Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

SLCo SLP132462 Mountain America Expo Center Water Softener - RFB

Active
SLCo SLP132462 Mountain America Expo Center Water Softener - RFBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Salt Lake County, on behalf of the Mountain America Exposition Center, is soliciting bids for the removal and replacement of the large water softener that supplies all domestic water to the facility, under solicitation number SLP132462. The scope of work includes the complete demolition and disposal of the existing softener tanks, piping, and valves, along with the shutdown and draining of the building’s water supply riser, demolition of overhead piping, installation of a new water softener supply manifold and drain line, and the setup of a new brine tank with a salt-filling sock. The project requires the use of pre-fabricated piping to limit building water shutdown to a single day, installation of three GFCI-protected electrical outlets per control valve in coordination with an electrical subcontractor, and full startup and activation of the new system along with onsite training and an operation manual. The new water softener equipment must be brand new, featuring a four-inch manifold with two-inch branch lines to each of three tanks, each equipped with isolation valves and unions for service, and all piping must adhere to the WCC installation diagram for the Triplex system. The contract includes a freight and service agreement, and all work must be performed at the Mountain America Expo Center located at 9575 State St, Sandy, UT 84070. Bidders must demonstrate at least five years of relevant experience and provide written references from three current customers using similar equipment or services; failure to meet these criteria renders a bid non-responsive. Award will be made to the lowest responsive and responsible bidder based solely on cost, as submitted in the required Pricing Schedule, though Salt Lake County may apply preference adjustments for vendors who certify participation in its Employee Health Care, Veterans, or Companywide Hiring Preference programs. All bids must be submitted through the Bonfire U3P portal by the deadline of August 5, 2026, and must include the completed Environmental Compliance and Non-Debarment Certification, as well as the relevant Preference Certification forms. The contractor must carry comprehensive insurance, including workers’ compensation, commercial general liability with $1 million per occurrence and $2 million aggregate limits, and commercial automobile liability at $1 million per occurrence, all issued by Utah-licensed providers rated A- or better by A.M. Best. The contract is governed by Utah state law and Salt Lake County ordinances, with termination for convenience requiring thirty days’ written notice and termination for non-funding possible if appropriations lapse. Payment is made by

General Info

Salt Lake County seeks contractor to replace water softener at Mountain America Expo Center by August 5, 2026.

Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(7)

SLP132462 Mountain America Expo Center Water Softener Request for Bids

PDFrfb

SLP132462 References Document

PDFpast-performance

RFB Preference System Certification and Scoring Guidelines 01.11.24

PDFrfb

SLP132462 Pricing Schedule

PDFpricing-schedule

2026 Terms and Conditions v.1

PDFterms-and-conditions

SLP132462 Salt Lake County Preference System Requirements

PDFsow

RFB Environmental Compliance Practices Vendor Compliance Statement

PDFrfb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / Agency
Utah
View Agency Profile
Office AddressUT, USA
Contacts

Full Description

Show more
Salt Lake County Contracts and Procurement, on behalf of the Mountain America Exposition Center, invites your company to bid on the removal and replacement of the large water softener which supplies all domestic water to the facility. Please see the attached General Requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
EXETER AVENUE SEWER REPLACEMENT PROJECT
Solicitation # 26012.00
The West Pittston Borough Neighborhood Accessibility Improvements Project is a municipal construction initiative in Luzerne County, Pennsylvania, focused on enhancing pedestrian access and safety through the installation of new sidewalks, handicapped ramps, and related infrastructure improvements along Ledgeview Drive and Damon Street. The project is funded in part by a Multimodal Transportation Fund Grant from the Commonwealth of Pennsylvania’s Commonwealth Financing Authority and is being procured through a sealed bid process administered via the PennBid electronic platform. Bids must be submitted online by 10:00 a.m. local time on July 16, 2026, and are to be priced on a unit price basis as specified in the online bid form, with award going to the lowest responsive and responsible bidder. The contract requires compliance with Pennsylvania prevailing wage rates and strict adherence to nondiscrimination policies covering race, gender, creed, color, sexual orientation, gender identity, religion, disability, national origin, and age, reflecting West Pittston Borough’s status as an Equal Opportunity/Affirmative Action Employer. Bidders must furnish bid security, a Performance Bond, and a Labor and Material Payment Bond, each in an amount equal to the contract value, with bonds remaining effective for one year after final payment is due or beyond the correction period, whichever is later. Insurance providers must maintain an A.M. Best rating of A-VII or better. Comprehensive contract documents, including the Agreement, General and Supplementary Conditions, Specifications, Drawings, Addenda, Wage Rate Requirements, and Additional State and Federal Requirements, are incorporated by reference and accessible through the Project Manual. Submission mandates include the Bidder Qualification Statement, Non-Collusion Affidavit under Pennsylvania Anti-Bid Rigging Act, Workmen’s Compensation Act affidavit, Employment Eligibility Verification (I-9), Public Works Employment Verification Form, and Nondiscrimination/Sexual Harassment Clause certification. Bidders must also certify they are not under federal or state suspension or debarment and provide resumes of key personnel, including the Safety Officer. The project includes related work such as traffic maintenance, removal of trees, pavement restoration, and installation of storm sewer components including manholes, inlet boxes, jacked pipes, and thermoplastic piping. Contract performance is governed by specific deadlines: substantial completion within 225 calendar days and final completion within 250 calendar days after notice to proceed, with liquidated damages applicable for delays. Payments are processed through Contractor Applications for Payment, subject to retainage based on work completed and stored
Luzerne County

POSTED

1 day ago

DEADLINE

in 26 days
View Details

More opportunities from Utah

Same awarding agency

NAICS: 518210
New
SLED
Cloud Infrastructure Migration and Management (IaaS)The contract seeks a subcontractor to migrate and manage state data and systems using Infrastructure as a Service (IaaS) cloud infrastructure within accounts managed by the Division of Technology Services, with strict adherence to GovRAMP and FedRAMP compliance standards. The work involves transitioning legacy systems to secure, government-approved cloud environments, ensuring data integrity, continuous availability, and alignment with federal security frameworks throughout the lifecycle of the migration and ongoing management. All activities must be conducted within the constraints of state-controlled cloud accounts and must maintain auditability and accountability as required by regulatory authorities. The opportunity is posted under NAICS code 518210 for Data Processing, Hosting, and Related Services, and is open for submissions with a response deadline of August 12, 2026. The contracting entity is the state of Utah, with no specific office address or point of contact provided, and performance is expected to occur within Utah’s jurisdiction. The solicitation is structured as a subcontract and is not assigned a set-aside designation, indicating open competition among qualified vendors who can demonstrate proven experience in secure cloud migration and federal compliance environments.
Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services

POSTED

2 days ago

DEADLINE

in 10 days
View Details