Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Slurry Filling and Soil Grouting

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract titled Slurry Filling and Soil Grouting involves the injection of cementitious grout into subsurface voids to stabilize soil and pavement structures, primarily in the city of Los Angeles. The work is intended to address ground instability and structural weaknesses by reinforcing underlying layers through controlled grouting procedures, ensuring the long-term integrity of paved surfaces and adjacent infrastructure. The activity falls under NAICS code 238990 for other specialty trade contractors and is classified as a subcontract under the Public Works Engineering Bureau in California. The solicitation was posted on April 30, 2026, with a response deadline of May 7, 2026, at 7:00 PM, prompting timely submission from qualified subcontractors seeking to participate in this geotechnical stabilization effort. All performance activities are localized to Los Angeles, with no additional details provided on set-aside provisions or point of contact information.

General Info

Slurry filling and soil grouting in Los Angeles to stabilize subsurface soil and pavement structures.

Place of Performance

Los Angeles, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of E1909562.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vista Del Mar near Fontainbleau Street Emergency Slope Repair

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Bureau, Public Works
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Injection of cementitious grout into subsurface voids to stabilize soil and pavement structures.

More opportunities from California → Engineering Bureau, Public Works

Same awarding agency

NAICS: 541330
New
SLED
TOS No. 105 - Baldwin Vista Green Streets Project
Solicitation # 105
Task Order Solicitation No. 105 is for the Baldwin Vista Green Streets Project, managed by the City of Los Angeles Bureau of Engineering and LA Sanitation and Environment. The project focuses on stormwater capture and infiltration within the Baldwin Vista community, specifically along Coliseum Street between Hauser Boulevard and Nicolet Avenue. The scope of work includes engineering services for pre-design, design, bid and award, and construction support to install approximately 23 double drywell units, one single drywell unit, 450 square feet of bioswales with native landscaping, 40 new street trees, and seven educational displays. The project is funded through the Safe Clean Water Program, with total estimated costs ranging from 9.3 million dollars for construction to approximately 10.9 million dollars when including planning, design, operations, maintenance, and three years of post-construction monitoring. The contract utilizes a hybrid compensation structure, with pre-design and design phases paid on a lump-sum basis and bid, award, and construction support services reimbursed at hourly-salary rates. Proposals are evaluated based on project understanding and technical approach (30 percent), team qualifications (20 percent), value and resource allocation (20 percent), knowledge of City standards (20 percent), and project delivery performance (10 percent). Key requirements include adherence to ADA accessibility, California prevailing wage laws, and a Minority Business Enterprise participation goal of 18 percent. Deliverables follow a phased review process with required approvals at 30, 50, 90, and 100 percent design stages. The solicitation closing date is January 5, 2027, with the task order expected to be issued by April 15, 2027.
Engineering Services

POSTED

6 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS