Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Slurry Material Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

State of California, Department of TransportationView Agency

NAICS

325910 - Printing Ink ManufacturingView NAICS

Place of Performance

Los Molinos, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 06-0H22U4.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Madera County Near Madera From San Joaquin River Bridge To 0.6 Mile North Of Avenue 12 Overcrossing

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyState of California, Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
State of California, Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply specified slurry materials (SlurryPro CDP, Super Mud) for drilling or stabilization activities.

Similar Contracts

Same NAICS industry code

More opportunities from State of California, Department of Transportation

Same awarding agency

NAICS: 236220
SLED
Caples Lake Maintenance Station Dormitory, Sand Storage, and Generator Building
Solicitation # 10-1H5604
The project involves the demolition of an existing sand storage building and the construction of a new four-story dormitory building, a new sand storage facility, and the renovation of an existing generator building at the Caltrans Caples Lake Maintenance Station. The scope encompasses extensive site work including roadway excavation, paving with HMA and Class 2 AB material, installation of retaining walls, and new drainage systems comprising RCP, flared end sections, and RSP, along with temporary water pollution control measures. Building construction requires concrete foundations, structural steel, masonry, and full integration of architectural, structural, mechanical, electrical, plumbing, and fire protection systems, all to be executed in a high mountain environment with strict environmental and material handling constraints. Materials must be stored in weathertight enclosures, protected from freezing and direct sunlight, and maintained within ambient temperature ranges of 45°F to 90°F; coatings and sensitive products require adherence to manufacturer specifications, including dehydration and sealing prior to shipment. All work must comply with referenced industry standards such as ASTM A36/A36M, NEMA 250, NFPA 80, UL 325, and AISI S240, and acceptance testing must adhere to the latest NETA Acceptance Testing Specification, with inspections conducted on-site by the contractor and verified by the Engineer. Bids are solicited under solicitation number 20260724021, with a response deadline of August 27, 2026, and the work is classified under NAICS code 236220 for construction of buildings. The procuring agency is the California Department of Transportation, and submissions must be made in both electronic and hard-copy formats using approved digital file types such as PDF, JPG, and MPEG, with proper file labeling and metadata retention. Bidders must declare their small business enterprise status with certification from the California Department of General Services, and any request for small business preference requires submission of formal commitment and confirmation forms; failure to provide these renders the bid nonresponsive. Contractors must also submit installer qualification statements, manufacturer certifications on official letterhead, and all system passcodes and passwords no later than 14 days before final completion. While no contract value is disclosed and no explicit evaluation factors, payment details, or contract type are provided, the project requires strict compliance with quality assurance provisions, including shop drawings, product data, welder qualifications, and inspection reports. Delivery and performance are to occur at the job
Commercial and Institutional Building Construction

POSTED

about 1 month ago

DEADLINE

in about 2 hours
View Details