This Solicitation opportunity from California was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The SMF Pedestrian Walkway Hub Flight Paths Public Art Installation Project, solicitation number 41015, is a CUPCCAA informal bid issued by the County of Sacramento Department of Airports. The project involves the specialty installation of the Flight Paths public artwork by David Brooks, consisting of ten flight paths and twelve bird sculptures at the Sacramento International Airport. The estimated construction cost is 210,000.00 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bidders must hold a valid California C-61/D-34 Prefabricated Equipment Contractor license and provide a self-performance certification, as construction subcontractors are prohibited.
The scope of work includes all labor, materials, and rigging necessary for the installation, with the County providing specific equipment, including JLG compact crawler boom lifts and a Genie electric slab scissor lift. Performance is managed through a phased Notice to Proceed structure, where NTP-1 covers scheduling and documentation, and NTP-2 establishes site availability and commences contract time. The contractor is responsible for adhering to strict structural calculations for aircraft cable suspension and curtain wall attachments, as well as complying with FAA nondiscrimination and Buy American preference requirements. Final acceptance is contingent upon a joint receiving inspection, completion of a punch list, and a visual review by the artist.
General Info
Sacramento County seeks a licensed contractor to install Flight Paths public art for $210,000.
DOCX, High priority: read this firstspecifications
HighAI Summary for Contract 41015 - Attachment B: Required Submittal Register: This document is Attachment B for the SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation Project (Contract No. 41015). It provides a detailed Required Submittal Register specifying the minimum project-specific and payment-administration submittals, including baseline schedules, installation work plans, safety plans, and artwork inventory logs, along with their required content and submission deadlines.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Contract 41015 Attachment D - County-Furnished Equipment: Attachment D for Sacramento County Department of Airports Contract No. 41015 (September 2026) regarding the SMF Pedestrian Walkway Hub Public Art Installation. This document specifies the equipment provided by the County, including two JLG X500AJ compact crawler boom lifts and one Genie GS-4655 electric slab scissor lift, detailing the scope of County-furnished rentals and the Contractor's responsibilities for operation and safety.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Contract 41015: SMF Pedestrian Walkway Hub – Flight Paths Public Art Installation Project: Special Provisions for the SMF Pedestrian Walkway Hub – Flight Paths Public Art Installation Project (Contract No. 41015), dated September 2026. This document modifies the County of Sacramento Standard Construction Specifications and outlines bid proposal requirements, including lump-sum base bid components, exclusions, and contractor responsibilities for the installation of public art at Sacramento International Airport.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Contract 41015 - SMF Pedestrian Walkway Hub Public Art Installation Minimum Qualifications: Attachment A for Contract No. 41015 (September 2026) outlines the minimum contractor qualifications for the SMF Pedestrian Walkway Hub Flight Paths Public Art Installation. It specifies requirements for a C-61/D-34 Prefabricated Equipment Contractor license, a 100% self-performance mandate prohibiting construction subcontractors, and a requirement for three comparable projects completed within the last five years.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Contract No. 41015 - Attachment C: Bid Item Schedule: A Bid Item Schedule for the SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation Project (Contract No. 41015), dated September 2026. It defines a single lump-sum Base Bid for the installation of ten flight paths and twelve birds, including labor, rigging, and engineering, while specifying that certain equipment is County-furnished.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Contract No. 41015 - Sleeve-Joint Reference Photographs: Attachment E of Contract No. 41015 for the SMF Pedestrian Walkway Hub Public Art Installation. This document provides reference photographs of a 3D-printed mockup of an overlapping sleeve joint to illustrate geometry, seams, and fastener-hole arrangements.
DOCX
DOCX, High priority: read this first5 pages · specifications
HighAI Summary for FAA Required Language for Non-AIP Contracts 2026: This document provides mandatory federal aviation administration (FAA) language for contracts not funded under the Airport Improvement Program (AIP). It outlines general civil rights provisions, Title VI solicitation notices, nondiscrimination requirements for contractors and subcontractors, and clauses regarding the transfer of real property.
DOCX
DOCX, High priority: read this first3 pages · specifications
HighAI Summary for FAA Solicitation Provisions for Construction and Equipment 2026: This document contains mandatory solicitation provisions and certifications for FAA-funded construction and equipment procurement. It includes requirements for Buy American Preference (BABA), Title VI civil rights compliance, debarment certifications, DBE participation, FLSA minimum wage standards, lobbying certifications, and prohibitions on covered Unmanned Aircraft Systems (UAS).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Genie GS-4655 Electric Slab Scissor Lift Specifications: Technical specification sheet for the Genie GS-4655 Electric Slab Scissor Lift. The document details measurements (working heights, platform dimensions), productivity metrics, power options (FLA and AGM batteries), weight, and available platform options and accessories.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for JLG X500AJ Compact Crawler Boom Lift Specifications: Technical specification sheet for the JLG X500AJ Compact Crawler Boom Lift. The document details performance metrics (49-ft platform height, 500-lb capacity), power options (Honda engine or Lithium Ion), dimensions, and standard features. It includes reach diagrams and warranty information.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Notice #41015: SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation Project: Invitation for Bids (IFB) issued by the County of Sacramento for the installation of the 'Flight Paths' public artwork by David Brooks. The project involves specialty contracting for fine art installation, rigging, and engineering support. Bids are due electronically by October 15, 2026, at 2:00 pm. The estimated construction cost is $210,000.00, and a C-61/D-34 contractor license is required. Award is based on the base bid only.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sacramento International Airport Public Art - Bird Mounting Locations: Technical drawing and specification document detailing the mounting locations, elevations, and weights for various bird sculptures (Birds 1-12) for the Sacramento International Airport Public Art project. Includes floor plans and elevation details provided by RE:DESIGN.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SD-03 SMF Pedestrian Walkway Overall Floor Plan (Sheet A-110): Architectural drawing sheet A-110 providing the overall floor plan for the SMF Pedestrian Walkway project, specifically detailing Concourse B, Terminal G, and Terminal H in Sacramento. Dated 12/5/2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SD-07-SMF Pedestrian Walkway Hub Flight Paths - Curtain Wall Attachment Details: Technical specifications detailing the attachment method for bird sculptures to horizontal aluminum mullions of a curtain wall, specifying the use of through bolts and 1/4-20 threaded rods welded to the bird feet.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SD-10-SMF Pedestrian Walkway Hub Flight Paths Scope Interface Markup Drawing: Technical markup drawing and scope interface document for the SD-10-SMF Pedestrian Walkway Hub Flight Paths, containing component descriptions and design references.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SMF Airport Hub Artwork - Structural Calculations: Structural calculation package dated July 7, 2025, for the 'Bird Flight Paths' artwork installation at the SMF Airport Hub walkway expansion. The document details the suspension of 10 aluminum extrusion pieces using aircraft cables and Gripple connectors, including weight tributary analysis, above-ceiling structural designs, and sway restraint calculations to ensure code compliance and structural integrity.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SMF Pedestrian Walkway - Finish Floor Plans (Areas A, B, and C): Technical finish floor plans and room schematic legends for the Sacramento County Department of Airports project: SMF New Pedestrian Walkway from Terminal B to Concourse B. Includes floor plan details for Area C, material legends (terrazzo), and architectural scale specifications dated September 30, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SMF Pedestrian Walkway Hub Asbestos Assessment (June 26, 2026): An asbestos assessment report dated June 26, 2026, for the Sacramento International Airport (SMF) Pedestrian Walkway Bridge Hub Upgrade Project. The survey, conducted by a Certified Asbestos Consultant, concluded that no suspected asbestos-containing materials were present in the materials to be impacted (concrete, metal, and dens deck), meaning no asbestos-related work items are required for the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SMF Pedestrian Walkway Hub - Equipment Loading Memo: Technical memo dated July 31, 2026, from Buehler Engineering to Sacramento County Department of Airports regarding allowable equipment loading for maintenance and art installation at the SMF Pedestrian Walkway. It provides structural evaluations and specific requirements for using JLG X500AJ and Genie GS-4655 lifts, including mandatory use of spreader pads, plywood for the Genie lift, and minimum spacing requirements to ensure floor framing adequacy and limit deck deflections.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SMF Pedestrian Walkway Hub Flight Paths Public Artwork Submittal: Approved deferred submittal for public artwork titled 'Preserved Flight Paths' at Sacramento International Airport. The document includes a drawing index (PA-N1 through PA-H4), artist statements, and technical specifications for bright finished aluminum castings and stainless braided wire rope, along with structural engineering details and requirements for special inspection of structural steel welding.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. Read ( Attachments A-U ) for further details.