Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The County of Sacramento is seeking a qualified Construction Manager at Risk (CMAR) to lead the Airfield Maintenance (AFMX) Facility project at Sacramento International Airport. The project involves the construction of a new 20,000 square foot pre-engineered steel structure designed to centralize maintenance equipment, vehicles, materials, and administrative functions. With an estimated construction budget ranging from 17.5 million to 18.5 million dollars, the selected CMAR will be responsible for all labor, materials, and management required to complete the facility. The project is divided into a preconstruction phase and a construction phase, with the latter utilizing a Guaranteed Maximum Price (GMP) delivery method. Eligible firms must hold a current Class B or higher California Contractors License, be registered with the California Department of Industrial Relations for public works, and demonstrate experience with government agencies and complex equipment replacement projects in secure operational settings. The selection process is based on a two-step evaluation consisting of a Statement of Qualifications (SOQ) review and interviews for the top-ranked respondents. Awarded contractors must provide performance and payment bonds, adhere to California prevailing wage laws, and comply with federal nondiscrimination and ADA requirements. Final completion and beneficial occupancy dates will be established during the preconstruction phase, with flexible work hours permitted to accommodate airport operations.
General Info
Agency
Place of Performance
CA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (44)
See All 44 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
Addendum #1: Attachment 1 – Request for Qualifications The County has identified an incorrect date in Attachment_1_-_Request_for_Qualifications. The document currently states November 19, 2026. The correct date is December 1, 2026. December 1, 2026, supersedes and replaces November 19, 2026, wherever that date appears in Attachment 1 – Request for Qualifications. Attachments: Attachment_1_-_Request_for_Qualifications_-_Addendum_1.pdf
Addendum #2: This Addendum 2 includes the following: County's response to question 1, which supplements response issued in Addendum 1. Response to question 2. Files presented and/or discussed during the Optional Pre-Proposal Conference on September 29, 2026: Pre-Proposal Conference Sign-In Sheet Pre-Proposal Conference Presentation Project Location Map 30% Schematic Design Plans An optional job walk is scheduled for Thursday October 22nd at 8:00 am. Attendees will park and meet at the job site provided in the Project Location Map. Attachments: RFQ_CMAR_for_SMF_AFMX_Facility_-_Addendum_No_2.pdf
Similar Contracts
Same NAICS industry code
More opportunities from California → Airports
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
