Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Smithneck Road Rehabilitation Plans, Specifications And Estimates (PS&E)

Closed
241024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 928110
Federal
AFLCMC Armament Directorate Rapid Response (ADRR) Commercial Solutions Opening (CSO) for Innovative Execution
Solicitation # FA8682-24-C-S001
The Air Force Life Cycle Management Center Armament Directorate at Eglin Air Force Base, Florida, is utilizing the Armament Directorate Rapid Response Commercial Solutions Opening for Innovative Execution as an umbrella competitive solicitation to acquire innovative commercial products, technologies, and services. This vehicle, governed by 10 U.S.C. 3458 and DFARS Subpart 212.70, is designed to rapidly develop novel weapons capabilities through the use of digital engineering, agile software, and open system architectures. The CSO does not commit the government to any specific contract or funding but establishes a framework where specific requirements are posted as Spirals. These Spirals may result in awards via FAR Part 12 contracts or Other Transaction agreements under 10 U.S.C. 4022. The current closing date for the CSO has been extended to June 4, 2027. Technical areas of interest include digital engineering and modeling, software infrastructure such as DevSecOps pipelines, and hardware design and testing. Past and current Spirals have addressed programs such as the ERAM program, Lugged Affordable Cruise Missile, Counter-Air Missile Program, and the Family of Affordable Mass Missiles Beyond Adversary Reach. Proposals are evaluated based on technical merit, importance to agency programs, and funds availability, with price assessed to ensure it is fair and reasonable. Award eligibility requires registration in the System for Award Management and the Wide Area Workflow system for milestone-based invoicing. The government maintains strict security requirements, including the protection of Controlled Unclassified Information and prohibitions on specific foreign software and hardware.
Air Force Life Cycle Management Center

POSTED

about 2 months ago

DEADLINE

in over 2 years

AI Contract Overview

Show more

The contract involves the comprehensive rehabilitation of Smithneck Road, extending approximately 4.5 miles south of Highway 49, with the primary goal of upgrading the roadway to improve safety and usability. The existing pavement, which is 26 feet wide with unpaved shoulders, will be pulverized, graded, and compacted to create a new 24-foot-wide travel lane with two 2-foot paved shoulders and 1-foot graded unpaved shoulders. Incidental improvements include installing centerline markers, striping, and signage, along with the addition of Class II bikeway markings and signage. The project scope also encompasses the potential installation of pedestrian crosswalks with signage near the intersection with State Route 49. The selected engineering firm will be responsible for final design, preparing bid documents, environmental documentation, and supporting construction activities. This includes completing all necessary environmental studies and permits, coordinating with Caltrans for NEPA clearance, and developing detailed plans, specifications, and cost estimates based on Caltrans standards. The scope extends to bid support, construction phase services such as review of submittals, site inspections, and final documentation, as well as survey monument preservation. The project emphasizes thorough project management, stakeholder coordination, and adherence to environmental and safety standards, with proposals evaluated based on technical expertise, experience, and project approach. The contract size ranges from $500,000 to $1,500,000, and interested firms must respond by November 30, 2024.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

2

RFP Smithneck Road Rehabilitation PS&E 2024-10-24

PDF, High priority: read this firstrfp
High

Smithneck Road Rehabilitation Proposal Holders List

PDF, Low priorityproposal-holders-list
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Sierra County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Sierra County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The project provides for the rehabilitation of Smithneck Road from SR 49 to the end of pavement approximately 4.5 miles (2366.64 linear feet) south of Highway 49.  The existing roadway is 26 feet wide (two 12-foot-wide lanes) with 7-foot graded unpaved shoulders.  The proposal is to pulverize, grade and compact the existing roadway section This will provide a 24-foot-wide travel way with two, 2-foot paved shoulders and 1-foot graded unpaved shoulders.  Incidental work will include the installation of recessed centerline markers and a striped centerline and edge lines. This project proposes to install Class II bikeway lane markings and signage on Smithneck Road (County Road S860) between State Route 49 and Smithneck Creek County Park.  The project may also include installation of a pedestrian crosswalk markings with advance signage at or near the intersection of State Route 49 and Smithneck Road.Scope of WorkPreliminary engineering, Project Approvals & Environmental Documents (PA&ED) has been completed for this projects and Sierra County now wishes to select a qualified firm to prepare final design/final bid documents (plans, specifications & cost estimate- PS&E) for this project and to provide final environmental documentation (National Environmental Policy Act – NEPA) Listed below are tasks the Consultant is expected to incorporate in the proposed scope of services.  It is not intended that the tasks included below comprise a comprehensive list or are the only tasks required for this project.  Each Consultant should, based on its expertise, develop a comprehensive and detailed scope of services necessary to deliver Plans, Specifications & Estimate (PS&E), right-of-way engineering (plats and legals), and Construction/Bidding Support.                     1. Project Management Includes a detailed and updated Microsoft Project design/environmental scheduleProject Meeting and Stakeholder CoordinationQuality ControlNEPA Documentation.                The Consultant shall complete all required studies and prepare reports and other documentation necessary to obtain both National Environmental Policy Act (NEPA).  Studies, reports, and other documentation required for NEPA clearance shall be provided to the County for submittal to Caltrans for approval.  The tasks shall include but not be limited to those items required in the Preliminary Environmental Study (PES) completed for the project.The Consultant shall coordinate and provide documentation to Caltrans in order to obtain NEPA environmental clearance.  It is expected that Caltrans will prepare the NEPA environmental clearance document.The Consultant shall prepare the necessary environmental permitting packages for the project.  It is anticipated that the following permits may be required:Section 404 Permit (U.S. Army Corps of Engineers)Section 401 Water Quality Certification (Regional Water Quality Control Board)Streambed Alteration Agreement (Department of Fish and Game) Basis of Design Technical Memorandum – written description of the basis of design.Interim Design Submittal at 65%; Plans, design calculations and documents, opinion of construction cost.Interim Design Submittal at 95%; Plans, technical specifications, updated opinion of construction cost, response to comments from prior review.100% Plans, Specifications and Estimate, response to comments from prior review.Final Bid Documents (Final Mylar Plan sheets fully executed by Consultant and any necessary permitting agency, Final Opinion of Construction Cost, Final Technical Specifications). The County intends to base the Project plans and specifications on the Caltrans 2018 Standard Specificationsand Plans.Bidding Assistance (as-needed)Respond to Requests for Information or Clarification during BiddingDesign support for AddendaReview Bid Proposal for irregularitiesAssist with Award RecommendationsPrepare Resident Engineer File and Surveyors InformationPrepare Record Drawings based on information supplied by construction management staff andcontractor.Project Close-Outa. Prepare Record of Survey or other record documents for any new or reset survey monuments.Design Services During Construction (not Construction Management) (as-needed)Respond to Requests for InformationReview SubmittalsProvide Design ClarificationsAttend Pre-Construction and Progress MeetingsPeriodic Field Review and reportingFinal Inspection for Design conformityThe County will complete all necessary documents required by the LAPM and LAPG including authorization requests, finance letters and Scope/Cost/Schedule Change request.  Consultant will be required to provide all necessary technical data necessary to complete the Caltrans LAPM or LAPG forms.Survey Monument Preservation.EVALUATION CRITERIAThe Proposal for Professional Engineering and Environmental Services submitted in response to this Request for Proposals will be used as a basis for selecting the engineering Consultant for this project.  The Consultant’s proposal will be evaluated and ranked according to the criteria provided in Appendix B “Evaluation Criteria” of this Request for Proposals.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS