[PROJECT TITLE CONTINUED]: Livermore General Plan 2045 General Plan and its policy direction.
PROJECT DESCRIPTION: The amendments provide updates to the Code as necessary to maintain consistency with General Plan land use designations, policies, and implementation actions, including updates to Planned Development Industrial District PD-I-22-001 (SMP 39) to provide greater flexibility for industrial and other employment generating uses.
Section 15162(a): an EIR has been certified or a negative declaration adopted for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following:
(1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
Response: The certified 2025 Addendum contemplated amendments to PD-I 22-001 related to conditionally allowed uses, including the removal of the 20% cap on warehouse and distribution facilities, and evaluated the impacts if the entirety of the SMP 39 site were to develop with these uses. The Amendments include revising permitted uses on the SMP 39 site to allow advanced manufacturing as a permitted use and allow uses currently permitted under SMP 40 (i.e., remove the 20-percent limitation on warehouse and distribution uses). These uses would be most closely represented by the ITE Land Use Code “High-Cube Fulfillment Center Warehouse,” would have a lower trip generation rate, including associated with heavy-duty trucks, than that of the Industrial Park ITE Land Use Code, the original use code used in the analysis of the 2024 EIR. The overall trip generation associated with buildout of the SMP 39 site would be reduced as compared to what is anticipated in the 2024 EIR and is the basis for the 2025 Addendum’s analysis on Air Quality, Emissions, and Noise. In addition, consistent with the 2024 EIR, the proposed project would be subject to all applicable federal, State, and local policies, regulations, and standards, as well as applicable mitigation measures established in the 2024 EIR. Therefore, the Amendments would not change any of the conclusions of the 2024 EIR. Considered in the context of the scope and intended implementation of the 2025 Addendum, the Amendments do not constitute substantial changes requiring major revisions to the EIR due to new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
(2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
Response: The Amendments are consistent with the impacts that were evaluated in the 2025 Addendum. No changes in the circumstances relevant to implementation of the Amendments have been identified that would require major revisions to the 2024 EIR due to new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
(3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
(A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
(B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
(D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
Response: No new significant effects have been identified, no previously analyzed impacts have become substantially more severe, and no previously infeasible mitigation measures or alternatives have become feasible but unadopted. Additionally, no new feasible mitigation measures or alternatives have been identified that would substantially reduce significant effects.
Because none of the conditions described in CEQA Guidelines Section 15162(a) above have occurred, no subsequent EIR is required for approval of the Amendments. The 2024 EIR and 2025 Addendum adequately address the environmental effects of this action and all previously adopted mitigation measures and monitoring requirements remain in effect.