Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Civil Utilities and Infrastructure

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Civil Utilities and Infrastructure involves the installation of water, sewer, and storm drain systems for prime contractors on the SMP 39 fusion power project. The scope of work includes laying pipe, installing manholes, and connecting to the City of Livermore municipal lines across a 51.9-acre parcel to deliver a functional utility network. The project is located in Livermore, California, and is categorized under NAICS code 237311. There is no specified set-aside status for this contract.

General Info

Subcontract for installing water, sewer, and storm drain systems in Livermore, California.

Place of Performance

Livermore, CA

Set-Aside

NONE

Documents

This scope was carved out of 2023010091.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SMP 39/SMP 40 Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom SMP 39/SMP 40 Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Livermore
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs water, sewer, and storm drain systems for prime contractors on the SMP 39 fusion power project. Lays pipe, installs manholes, and connects to City of Livermore municipal lines for a 51.9-acre parcel. Delivers a functional utility network.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
New
SLED
26/27-03-ECS Goodpasture Covered Bridge Seismic Retrofit and Wildfire Mitigation
Solicitation # 26/27-03-ECS
The 26/27-03-ECS solicitation is a project for the Goodpasture Covered Bridge Seismic Retrofit and Wildfire Mitigation, managed by the Lane County, OR Engineering & Construction Services (ECS) Division. The scope of work involves technical improvements to the bridge, including connection strengthening and ensuring no rise in water surface elevation to meet FEMA No-Rise Certification requirements. The project is subject to Build America Buy America requirements, ADA compliance for pedestrian access routes, and strict safety clearances of 10 feet from energized power lines. Bidders must be registered with the Oregon Construction Contractors Board or licensed by the State Landscape Contractors Board and must comply with Oregon prevailing wage laws. Award evaluation is based on the bidder's compliance with public bidding procedures, resource capability, performance and integrity records, and legal qualifications. Bidders must provide a bid guaranty for 10% of the bid amount and submit a first-tier subcontractor disclosure within two hours of the bid closing. The contract requires a performance bond and a payment bond, with a specific requirement that first-tier subcontractors be paid within 10 calendar days of satisfactory performance. Bids are submitted via Bid Express using AASHTOWare Project Bids software or as paper bids printed from the ODOT eBIDS website. There is no set-aside status for this solicitation.
Lane County, OR - Engineering & Construction Services (ECS) Division

POSTED

about 2 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
New
SLED
8800
Solicitation # 8800
The City of St. Louis Board of Public Service is soliciting bids for the removal and replacement of the Southwest and Columbia Bridges in Missouri. The scope of work includes the installation of electrical and pedestrian infrastructure, specifically 2-inch and 3-inch conduits and ADA-compliant pushbutton detectors with integrated audible pedestrian systems. All sidewalk and curb replacements must adhere to ADA requirements, and APS equipment must comply with the MUTCD 11th Edition. The project requires strict adherence to material standards, including various ASTM specifications for reinforcing bars and galvanized coatings, and mandates that all professional engineering submittals be signed and sealed by a Professional Engineer registered in the State of Missouri. Bidders must submit proposals electronically via the Bid Express Online Portal by November 10, 2026. The submission process is divided into three sections, with initial bid documents due immediately and DBE-related documentation due three days after the bid. Key requirements include a bid deposit of 5% of the total base bid, performance and payment bonds from a surety with an A- or better rating, and compliance with the Davis-Bacon and Related Act for prevailing wages. Additionally, the awarded contractor and its subcontractors must provide ten-hour OSHA training. This solicitation is not a set-aside.
City of St. Louis Board of Public Service

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details

More opportunities from California → City of Livermore

Same awarding agency

NAICS: 925120
New
SLED
Livermore General Plan 2045The City of Livermore is implementing the General Plan 2045, a comprehensive policy framework designed to guide the city's physical development, resource conservation, and infrastructure provision through a 20-year buildout horizon. This project replaces the previous General Plan and includes concurrent amendments to the Livermore Development Code, such as the creation of a Scenic Resources Overlay District and updated zoning standards. The plan focuses on concentrating growth within the Urban Growth Boundary through infill development, with projections estimating the addition of 16,610 housing units, 43,820 new residents, and 6,110 new jobs. The scope encompasses updates to nine state-mandated elements, including land use, mobility, and economic development, and introduces a new Midtown Specific Plan Area. The project has undergone a rigorous environmental review process in compliance with the California Environmental Quality Act, resulting in a Final Environmental Impact Report and a Mitigation Monitoring and Reporting Program. These documents establish protocols for protecting biological and cultural resources and ensure that future development is supported by adequate water supplies from Cal Water and Livermore Municipal Water. While the General Plan 2045 establishes the overarching goals and land use designations, it does not entitle specific projects; instead, it serves as the guiding framework for future discretionary decisions by city officials, requiring all subsequent developments to undergo separate environmental reviews and demonstrate consistency with the plan.
Administration of Urban Planning and Community and Rural Development

POSTED

about 17 hours ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS