This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on June 12, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Snag Creation, Topping / Girdling / Felling

Closed
AG-046W-S-15-0035Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
Inchelium Forestry, Pre-Commercial thinning fall 2026, Gold Mt. 156
Solicitation # InchThinning2026.pdf
The Confederated Tribes of the Colville Reservation, through Colville Tribal Forestry, is soliciting proposals for pre-commercial thinning and mastication services for the Gold Mt. 156 project area, totaling 52 acres. The contractor is responsible for providing all labor, equipment, supervision, and safety measures to execute thinning based on tree vigor and species preference. Technical specifications include strict guidelines on stump height, slash treatment, and the preservation of trees with a diameter at breast height of 8 inches or greater, unless otherwise marked. Compliance is monitored by a Contracting Officer's Representative who performs inspections to identify missed cuts or problem areas. Bids must be submitted in sealed envelopes to the Inchelium Forestry Office by 4:30 P.M. on October 21, 2026. Required submission documents include an updated SAM.gov registration, proof of insurance, a completed work plan, and a debarment certification. The contract emphasizes Indian preference, requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin and the submission of a TERO compliance and utilization plan. Payment is structured with 80 percent of each completed pay item paid within ten working days of final approval, while 20 percent is withheld until all contract requirements are satisfactorily completed.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in about 13 hours
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 115310
New
SLED
San Poil Forest stocking Survey 2027
Solicitation # StockingSurvey2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for five stocking survey contracts (SP-01-SSUR-27 through SP-05-SSUR-27) to be performed on the Colville Indian Reservation. The scope of work covers approximately 1,443 acres and 2,241 plots across the .30 mile, Swawilla, Summit North, and Williams Flats areas. Contractors are required to conduct survival and stocking surveys, submitting a detailed work plan that includes estimated daily acreage and completion schedules. Performance is measured by a Contract Officer's Representative (COR) who inspects at least 20 percent of plots; an accuracy rate of 85 percent or greater is required for acceptance, while full payment is tied to an accuracy rate of 95 percent and above. A 20 percent holdback will be withheld from all payments until all contract requirements are fulfilled. Award evaluations are based on technical qualifications and price reasonableness, with a strong preference given to certified Indian preference eligible firms. Bidders must submit a comprehensive packet including a Debarment Form, Title ID Certification, Bid Evaluation Form, and a TERO Compliance and Utilization Form. Additionally, contractors must provide liability insurance and adhere to tribal Occupational Safety Health Administration (IOSHA) standards. Those utilizing subcontractors or employees must submit a contracting and training plan to the TERO office. Failure to meet quality standards requires the contractor to rework the affected unit at no cost to the Tribe within two days of notification.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in 13 days
NAICS: 115310
New
SLED
San Poil Forest, 4 PreCommercial thinning contrats, 21 Mile area
Solicitation # SanpoilForest2026Oct29.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for four pre-commercial thinning contracts in the 21 Mile area. The project encompasses a total of 120.1 acres divided into four units: Unit A (56.3 acres), Unit B (38.4 acres), Unit C (41.5 acres), and Unit D (40.2 acres). The scope of work requires the identification and maintenance of crop trees while removing competing vegetation, adhering to strict specifications such as stump heights of less than five inches and the protection of boundary trees marked with orange or yellow stripes. Bids must be submitted via a locked drop-off box at the San Poil Forestry Office by October 29, 2026, at 4:00 P.M., with electronic submissions prohibited. Applicants must be registered in SAM.gov and possess a valid Trader License. The award process strongly prioritizes certified Indian preference firms, and contractors must ensure that at least 51 percent of their seasonal or project-based workforce is of Indian preference origin. Technical qualifications and reasonable pricing are key evaluation factors, and the Colville Tribal Forestry reserves the right to reject any bid. Contract administration includes oversight by a designated Contract Officer's Representative who will perform quality inspections. Payment is based on completed and accepted acreage, with 20 percent of each payment withheld until final approval and site cleanup are completed. Contractors must provide liability insurance and comply with the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation as administered by TOSHA. Additional requirements include TERO certification to avoid specific fees and the submission of a comprehensive employment and training plan.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 115310
New
SLED
Telogia Creek Sand Pine Removal
Solicitation # FWC 26/27-15
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for sand pine regeneration removal services covering approximately 797 acres at various locations within the Telogia Creek WMA in Liberty County, Florida. The project requires the removal of sand pines using hand pulling as the primary method, which is mandatory for pines with a stem diameter of less than one half inch. For larger pines, saws must cut below the lowest live branches, preferably at or slightly above ground level. All treated pines must be left where they are cut or pulled rather than piled, and the vendor is responsible for ensuring that surrounding non-target trees, such as Long Leaf Pines, remain upright. Upon completion, all trash and debris must be removed from the site. The contract will be awarded to the responsive and responsible bidder offering the lowest total price, calculated as the summed cost per acre across light, moderate, and heavy sand pine presence levels. The initial term is for one year upon issuance of the Purchase Order, with the Commission holding the option to renew the contract annually for up to two additional years. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and must submit their bids in a sealed envelope by the deadline of October 16, 2026, at 1:00 PM ET. Digital submissions are not accepted. Compliance requirements include the use of the U.S. Department of Homeland Security E-Verify system, adherence to federal safety requirements, and cooperation with the Inspector General. Awarded vendors must provide proof of automobile, public liability, and property damage insurance, as well as worker's compensation if they employ more than four people. Payment will be issued via electronic invoices processed in accordance with Florida Statutes, subject to a transaction fee for registered vendors. Performance will be verified by a Project Manager using GPS and GIS software, with payments deducted for any areas that do not meet the specified removal and site maintenance standards.
Florida Fish and Wildlife Conservation Commission

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
Mechanical Site Prep: Cherry West Item 1
Solicitation # RFP-2025-0153
The County of Tuolumne is soliciting proposals under RFP-2025-0153 for the Cherry West Project, which involves mechanical site preparation and fuels reduction on approximately 535.90 acres within the Stanislaus National Forest. This effort is conducted under a Master Stewardship Agreement with the USDA Forest Service on behalf of the Yosemite Stanislaus Solutions Collaborative to enhance forest and watershed health. Authorized activities include mastication, hand thinning, chopping, piling, and the creation of fuelbreaks. The initial contract term is two years, with the possibility of two three-month extensions. Priority units M014A and M014C must be completed between June and October 31, 2027, with at least 50 percent of all awarded acres finished by that date and all remaining work completed by October 31, 2028. Qualified proposers must have at least three years of experience in forested environments, hold a valid DIR registration number for prevailing wage compliance, and be licensed to practice in California. Award decisions are based on the most advantageous proposal considering price and other factors. Payment is contingent upon Forest Service acceptance, with full payment granted for work that is 95 percent or higher complete; work below this threshold may receive no payment or a reduced price. Contractors are required to submit a progress schedule, traffic control plan, and erosion control measures within 10 days of the Notice to Proceed. Additionally, the contract mandates strict adherence to fire safety plans, environmental protections for streamcourses, and detailed employment outcome reporting.
County Administration Office

POSTED

about 13 hours ago

DEADLINE

in 24 days
NAICS: 115310
New
SLED
On-Call Registered Professional Forester (RPF) Services
Solicitation # RFQ 202627-1
The Monterey Peninsula Regional Park District is soliciting qualifications under RFQ 202627-1 to establish a prequalified list of licensed Registered Professional Foresters (RPFs) for on-call services. The primary objective is to secure professional forestry expertise to manage the practice of forestry across the District's 13,000 acres of diverse landholdings, including sites such as the Frog Pond Wetland Preserve and Garland Ranch Regional Park. The scope of work involves supervising and training crews and contractors, approving prescriptions, and providing signed documentation and regulatory filings in compliance with the Professional Foresters Law. Prequalification is valid for up to five years, though it does not guarantee work; the District will select the most qualified RPF from the list for specific projects based on experience and availability, followed by a proposal and rate negotiation process. Applicants must submit a Statement of Qualifications via the OpenGov portal by November 2, 2026, which must include California RPF license numbers, resumes, and at least three public agency references. The evaluation is conducted on a pass/fail basis, and fee proposals are strictly prohibited during this initial phase. Selected consultants must operate as independent contractors and maintain comprehensive insurance coverage, including general liability, automobile liability, and professional liability of at least $1,000,000. Administrative terms include monthly invoicing with a 30-day payment cycle for non-disputed fees and a 10-day written notice period for termination for convenience by the District.
Planning & Conservation

POSTED

about 20 hours ago

DEADLINE

in 13 days

General Info

Contract Value

$36,169

NAICS

115310 - Support Activities for Forestry

Place of Performance

Pacific Northwest Region, Mt. Hood National Forest, Clackamas River Ranger District, ESTACADA, OR, 97023, USA

Set-Aside

SBA

Award Issued Date

Documents

6

2015_06_11_13_24_25.pdf

PDF

2015_06_11_13_26_51.pdf

PDF

2015_06_11_13_27_49.pdf

PDF

2015_06_11_13_28_25.pdf

PDF

2015_06_11_13_28_57.pdf

PDF

Schedule_of_Items_Girdling_Topping_Felling.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mount Hood National Forest
Contacts2 people available
OfficeSANDY, OR, 97055, USA
Office AddressSANDY, OR, 97055, USA
Contacts
Cynthia A KormanPurchasing Agent
Ed BuursmaWildlife Biological Technician

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes/proposals are being requested and a written solicitation will not be issued. The solicitation number AG-046W-S-15-0035 and issued as a Request for Quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-81. This is a small business set-aside with an associated NAICS code of 115310 and small business size standard of $7.5 million. The following are this solicitation's list of contract line item number(s) and items, quantities and units of measure: SEE ATTACHED SCHEDULE OF ITEMS. The date for delivery is October 31, 2015. The provision "52.212-1, Instructions to Offerors-Commercial", applies to this acquisition and the following are provided as an addenda to this provision. none. The provision "52.212-2, Evaluation-Commercial Items", applies to this acquisition and the specific evaluation criteria to be included in paragraph (a) of that provision, are as follows: i) Technical Capability of Services offered to meet the Government Requirement , ii) Price, iii) Past Performance. Technical Capability and Past Performance, when combined, are approximately equal to price. All offerors must provide a completed copy of "52.212-3, Offeror Representations and Certifications - Commercial Items" OR the offeror must have completed their annual representations and certifications electronically at https://www.sam.gov/portal/public/SAM. If the offeror has completed SAM on-line, a copy of 52.212-3 can be pulled from the SAM website. DUNS Number: TIN Number:___________________ FAR Clause "52.212-4, Contract Terms and Conditions - Commercial Items" applies to this acquisition and includes the following addenda to this clause incorporated in full or by reference. FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991) FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) Include X Delete The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31, 2015. Estimated start date is within 2 weeks after award. FAR 52.216-18 ORDERING (OCT 1995) (a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from ____________ through __________________. FAR 52.216-19 ORDER LIMITATIONS (OCT 1995) (a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than __________ the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under this contract. (b) Maximum order. The Contractor is not obligated to honor-- (1) Any order for a single item in excess of __________; (2) Any order for a combination of items in excess of ___________; or (3) A series of orders from the same ordering office within ___ days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above. FAR 52.216-21 REQUIREMENTS (OCT 1995) FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995) AGAR 452.236-72 USE OF PREMISES (NOV 1996) AGAR 452.236-73 ARCHAEOLOGICAL OR HISTORICAL SITES (FEB 1988) AGAR 452.236-74 CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION (NOV 1996) AGAR 452.236-77 EMERGENCY RESPONSE (NOV 1996) FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (JAN 2013) (a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)). ___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)). (2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553). (3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78). (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: [Contracting Officer check as appropriate.] __ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402). (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)). __ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.) _X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Aug 2012) (Pub. L. 109-282) (31 U.S.C. 6101 note). __ (5) 52.204-11, American Recovery and Reinvestment Act-Reporting Requirements (Jul 2010) (Pub. L. 111-5). _X_ (6) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Dec 2010) (31 U.S.C. 6101 note). __ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Feb 2012) (41 U.S.C. 2313). __ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (May 2012) (section 738 of Division C of Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161). __ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a). __ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JAN 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a). __ (11) [Reserved] _X_ (12)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644). __ (ii) Alternate I (Nov 2011). __ (iii) Alternate II (Nov 2011). __ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644). __ (ii) Alternate I (Oct 1995) of 52.219-7. __ (iii) Alternate II (Mar 2004) of 52.219-7. _X_ (14) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)). __ (15)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637(d)(4)). __ (ii) Alternate I (Oct 2001) of 52.219-9. __ (iii) Alternate II (Oct 2001) of 52.219-9. __ (iv) Alternate III (Jul 2010) of 52.219-9. __ (16) 52.219-13, Notice of Set-Aside of Orders (Nov 2011)(15 U.S.C. 644(r)). _X_ (17) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)). __ (18) 52.219-16, Liquidated Damages-Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)). __ (19)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer). __ (ii) Alternate I (June 2003) of 52.219-23. __ (20) 52.219-25, Small Disadvantaged Business Participation Program-Disadvantaged Status and Reporting (Dec 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323). __ (21) 52.219-26, Small Disadvantaged Business Participation Program- Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323). __ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f). _X_ (23) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2012) (15 U.S.C. 632(a)(2)). __ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Apr 2012) (15 U.S.C. 637(m)). __ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Apr 2012) (15 U.S.C. 637(m)). _X_ (26) 52.222-3, Convict Labor (June 2003) (E.O. 11755). _X_ (27) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Mar 2012) (E.O. 13126). _X_ (28) 52.222-21, Prohibition of Segregated Facilities (Feb 1999). _X_ (29) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). __ (30) 52.222-35, Equal Opportunity for Veterans (Sep 2010)(38 U.S.C. 4212). _X_ (31) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793). _X_ (32) 52.222-37, Employment Reports on Veterans (SEP 2010) (38 U.S.C. 4212). __ (33) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). __ (34) 52.222-54, Employment Eligibility Verification (JUL 2012). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.) __ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). __ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). __ (36) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b). __ (37)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (DEC 2007) (E.O. 13423). __ (ii) Alternate I (DEC 2007) of 52.223-16. _X_ (38) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513). _X_ (39) 52.225-1, Buy American Act-Supplies (Feb 2009) (41 U.S.C. 10a-10d). _X_ (40)(i) 52.225-3, Buy American Act-Free Trade Agreements-Israeli Trade Act (Nov 2012) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, and 112-42, and 112-43). _X_ (ii) Alternate I (Mar 2012) of 52.225-3. __ (iii) Alternate II (Mar 2012) of 52.225-3. __ (iv) Alternate III (Nov 2012) of 52.225-3. __ (41) 52.225-5, Trade Agreements (NOV 2012) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note). _X_ (42) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). __ (43) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150). __ (44) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150). __ (45) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)). __ (46) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)). __ (47) 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (Oct 2003) (31 U.S.C. 3332). _X_ (48) 52.232-34, Payment by Electronic Funds Transfer-Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332). __ (49) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332). __ (50) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a). __ (51)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). __ (ii) Alternate I (Apr 2003) of 52.247-64. (c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: [Contracting Officer check as appropriate.] _X_ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.). _X_ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). __ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). __ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). __ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007) (41 351, et seq.). __ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (Feb 2009) (41 U.S.C. 351, et seq.). __ (7) 52.222-17, Nondisplacement of Qualified Workers (Jan 2013) (E.O. 13495) __ (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247). __ (9) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)). (d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-Negotiation. (1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract. (2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved. (3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law. (e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause- (i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)). (ii) 52.219-8, Utilization of Small Business Concerns (Dec 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities. (iii) 52.222-17 Nondisplacement of Qualified Workers (Jan 2013) (E.O. 13495). Flow down required in accordance with paragraph (1) of FAR clause 52.222-17. (iv) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). (v) 52.222-35, Equal Opportunity for Veterans (Sep 2010) (38 U.S.C. 4212). (vi) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793). (vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40. (viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.). (ix) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)). ___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)). (x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007) (41 U.S.C. 351, et seq.). (xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (Feb 2009) (41 U.S.C. 351, et seq.). (xii) 52.222-54, Employment Eligibility Verification (JUL 2012). (xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6. (xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64. (2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations. Alternate I (Feb 2000). As prescribed in 12.301(b)(4)(i), delete paragraph (d) from the basic clause, redesignate paragraph (e) as paragraph (d), and revise the reference to "paragraphs (a), (b), (c), or (d) of this clause" in the redesignated paragraph (d) to read "paragraphs (a), (b), and (c) of this clause." Alternate II (Jul 2012). As prescribed in 12.301(b)(4)(ii), substitute the following paragraphs (d)(1) and (e)(1) for paragraphs (d)(1) and (e)(1) of the basic clause as follows: (d)(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to- (i) Examine any of the Contractor's or any subcontractors' records that pertain to, and involve transactions relating to, this contract; and (ii) Interview any officer or employee regarding such transactions. (e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial items, other than- (i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and (ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause- (A) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)). (B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (C) 52.219-8, Utilization of Small Business Concerns (Dec 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities. (D) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). (E) 52.222-35, Equal Opportunity for Veterans (Sep 2010) (38 U.S.C. 4212). (F) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793). (G) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40. (H) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.). (I) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)). (J) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007) (41 U.S.C. 351, et seq.). (K) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (Feb 2009) (41 U.S.C. 351, et seq.). (L) 52.222-54, Employment Eligibility Verification (Jul 2012). (M) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6. (N) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64. The following requirements, terms and conditions are necessary for this acquisition in order to maintain consistency with customary commercial practices: The date, time and place offers are due is June 25, 2015, 4:30 Pacific Time at 16400 Champion Way, Sandy or email to ckorman@fs.fed.us. Contact Cindy Korman (administrative / 503-668-1781 / ckorman@fs.fed.us) or Ed Buursma (technical / 503-630-8734 / ebuursma@fs.fed.us) for information regarding this solicitation. FAR 52.237-1 SITE VISIT (APR 1984) Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. FAR 52.237-1 SITE VISIT (APR 1984) Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

More opportunities from Department Of Agriculture → Mount Hood National Forest

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS