Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SNOC26271001 - RFP -Private Public, Partnership Housing Project

Closed
SNOC26271001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to submit proof of these specific public notices and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Documentation for general outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with Davis-Bacon Act wage determinations, OSHA, EPA, ADA, and NFPA-101 life safety codes. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

Snow College is soliciting proposals under RFP SNOC26271001 to secure a Development Partner for the evaluation, feasibility analysis, and potential construction of a student housing project in Richfield, Utah. The conceptual project involves approximately 150 beds on college-owned land, with a focus on supporting enrollment growth and student success. The engagement begins with a predevelopment agreement to assess market demand, affordability targets of 450 to 550 dollars per bed per month, and delivery structures. If the project is deemed viable, the parties intend to negotiate a full development partnership agreement, subject to approval from the State Board of Higher Education and the State of Utah Division of Facilities and Construction Management. Proposals must be submitted via the U3P portal by September 10, 2026, and must include a separate cost proposal file to avoid disqualification. Evaluation is based on a best-value determination, weighing factors such as experience, affordability strategies, and a required interview for those scoring over 250 points. Selected partners must comply with Utah state laws, including GRAMA for public records and E-Verify for employment eligibility. The contract requires comprehensive insurance coverage of at least 2 million dollars per occurrence, performance and payment bonds for projects exceeding 50,000 dollars, and adherence to standard college terms regarding indemnity and jurisdiction in Sanpete County, Utah.

General Info

Snow College seeks development teams to evaluate feasibility of 150 student housing beds via public-private partnership.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

12

Master - New Standard Terms and Conditions for Snow College

PDF, High priority: read this firststandard-terms-and-conditions
High

RFP SNOC26271001 Private Public Partnership Housing Project

DOCX, High priority: read this firstrfp
High

RFP SNOC26271001 Private Public Partnership Housing Project

PDF, High priority: read this firstrfp
High

RFP SNOC26271001 Private, Public Partnership Housing Project

PDF, High priority: read this firstrfp
High

RFP #SNOC26271001 - Private Public Partnership Housing Project

DOCX, High priority: read this firstrfp
High

SNOC26271001 RFP - Private, Public Partnership

PDF, High priority: read this firstrfp
High

Snow College Goods and Service Contract Template

PDF, High priority: read this firstcontract-document
High

Snow College Standard Contract Terms and Conditions for Goods and Services

PDF, High priority: read this firstcontract-document
High

Claim of Business Confidentiality Form

PDF, Low priority1 page · business-confidentiality-claim
Low

IRS Form W-9 (Rev. March 2024)

PDF, Low priorityother
Low

RFP SNOC26271001 - W-9 Taxpayer Identification Form

PDF, Low priorityother
Low

Snow College Vendor Registration Form

PDF, Low priorityvendor-registration
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
SSnow College (“the College”), a public institution of higher education in the State of Utah, is soliciting proposals from qualified and experienced development teams to serve as a Development Partner for the evaluation, feasibility analysis and possibly the construction of a proposed student housing project on College-owned land located in Richfield, Utah, with approximately 150 beds (Conceptual).
The College seeks a collaborative partner to assist in determining the feasibility, affordability, and appropriate delivery structure for student housing that would support enrollment growth, student success, and long-term institutional goals at the Richfield Campus. The intent is to enter into a predevelopment agreement to evaluate project feasibility. If it is determined that a project and partnership is feasible to move forward, then a full development partnership agreement will be negotiated. All of this is subject to input from the State of Utah Division of Facilities and Construction Management and approval from the State Board of Higher Education.
Snow College invites interested parties to submit a proposal to provide the college with these services.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

1 day ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS