Soil Erosion and Stormwater Control Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract involves the installation of temporary erosion control measures designed to manage soil erosion and stormwater runoff effectively. The scope of work includes setting up silt fences, diversion berms, and implementing stormwater pollution prevention systems to safeguard the environment during construction or land-disturbing activities. The contract is issued as a subcontract under the NAICS code 562910, which pertains to environmental remediation services. The contract was posted on June 15, 2026, by the Eastern Federal Lands Division of the Department of Transportation. While specific location and point of contact details are not provided, the contract focuses on ensuring environmental compliance by controlling sediment and pollutants, thereby reducing impacts on adjacent water bodies or land areas during project activities. This effort is critical for maintaining regulatory standards and protecting natural resources throughout the contract duration.
General Info
Agency
NAICS
Place of Performance
WV, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
