Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Solano 5 Wind Repower Project

Forecast
2025101549State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Sacramento Municipal Utility District

Place of Performance

Montezuma Hills Rd and Toland Landing, CA, 94571

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento Municipal Utility District
Contacts2 people available
OfficeN/A

Interested Companies (1)

AecomChelmsford, MA

Full Description

Show more
The Project would repower our existing Solano Wind Project Phase 2. This would consist of removing 29 Vestas V90 Wind Turbine Generators (WTGs) at the Solano 2 Wind site and constructing 21 new WTGs in the same general areas as the previously used locations. The Project would generate up to 94.5 MW. The Project site is dominated by non-native grasslands used for seasonal livestock grazing and dry crop farming. The Project would consist of, road improvements, WTG foundations, and an underground electrical collection system to transport electricity to the Russell Substation. In addition, two obsolete overhead electrical powerlines would be removed, two existing meteorological towers outside of the Solano 2 area would be replaced near their original locations, and a temporary water intake pump would be located at the Sacramento River to provide water for construction.

Similar Contracts

Same NAICS industry code

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS