Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Solar Photo-voltaic Demonstration Project in Potter Valley

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the installation of a 5,000-gallon water storage tank, a 2'x2' concrete pad to support a solar array, a 3'x3' concrete pad for an electric pump, and a 1" PVC piping system to transport water from a well to the storage tank. The entire water system will be enclosed by a 30'x30' chain-link security fence to ensure protection and reliability. The system is designed to provide stored water for community fire suppression and food production purposes, emphasizing resilience and local resource management. The project is located at 9501 Spring Valley Road in Potter Valley, California, and is being managed by the Mendocino County Resource Conservation District. Environmental compliance is established through a categorical exemption under CEQA Guidelines Section 15304, confirming that the project involves minor land alterations with no significant environmental impact, and a cultural resources assessment was conducted in coordination with the Potter Valley Tribe. No formal contract value, pricing details, or line items are provided in the documentation, and there are no specified payment terms, invoicing methods, or accounting codes. The period of performance and delivery schedule are undefined, and there is no indication of FOB terms or shipping responsibilities. The contract does not include any Federal Acquisition Regulation clauses, evaluation factors for award, or procurement specifications such as COR, COTR, or PCO assignments. Representations and certifications typically required in federal solicitations are absent, including UEI, CAGE code, or socioeconomic status declarations. No packaging, marking, or preservation requirements are outlined, and the documentation focuses exclusively on the physical installation and environmental compliance, with no administrative, logistical, or financial specifications provided beyond the project description and CEQA exemption status.

General Info

Install 5,000-gallon tank, solar and pump pads, PVC piping, and security fence for community fire and food use in Potter Valley.

Agency

California → Mendocino County Resource Conservation District

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

9501 Spring Valley Road, CA, 95469

Set-Aside

NONE

Documents

(1)

NOE Form for Solar PV Demonstration Project Mendocino County

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mendocino County Resource Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Mendocino County Resource Conservation District
Office AddressN/A
Contacts
Joseph D. ScrivenWater Resources Program Manager

Full Description

Show more
The project involves installation of a 5,000-gallong water storage tank, a 2'x2' concrete pad for the solar array, a 3'x3' concrete pad for the electric pump, and 1" PVC pipe to convey water from the well to the storage tank. A 30'x30' chain-link security fence will surround the water system. Stored water will be available for fire suppression activities and food production.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle will replace 125 aging Robicon variable frequency drives (VFDs) with new equipment as part of Phase 3 of its VFD Replacement initiative. This effort aims to upgrade outdated infrastructure to ensure system reliability and improve operational efficiency across aviation facilities and infrastructure. The new VFDs will be fully integrated with the Port’s Direct Digital Controller (DDC) system to enable real-time energy usage monitoring, output control readings, and efficiency tracking, enhancing the Port’s ability to manage power consumption and maintain optimal performance. The scope includes all necessary wiring, testing, commissioning, and installation of associated equipment required to deliver a fully functional and synchronized system. The work falls under NAICS code 238210 and is managed by the Aviation Facilities & Infrastructure division, with technical oversight from Project Manager Sharon Miick and primary point of contact Yanet Maldonado. Although the solicitation number and set-aside details are not specified, the forecast was posted on July 31, 2026, signaling upcoming procurement activities. The project is critical for modernizing the Port’s electrical infrastructure and supporting long-term sustainability goals through precise control and monitoring of motor-driven systems. All work must be performed on-site at the Port’s facilities, with full accountability for system integration, performance validation, and operational readiness upon completion.
Aviation Facilities & Infrastructure

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract requires the provision of design, permitting, and construction services to install 50 high-resolution cameras across 43 sites in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance security and enforcement capabilities by replacing outdated systems with improved coverage, specifically targeting main terminal drive lanes and entrances previously unmonitored, with the goal of supporting forensic investigations and adherence to port movement rules. In the Bagwell area, the new cameras will shift focus from conveyor systems and security doors to critical transit corridors, while the North Cargo operations will benefit from flexible, user-controlled Pan Tilt Zoom units that provide broad surface area monitoring and dynamic viewing capabilities to address operational gaps. All work must be completed in accordance with specified technical and operational standards to ensure seamless integration with existing security infrastructure. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams available for coordination. The North American Industry Classification System code 238210 identifies this as a specialty trade contracting effort focused on electrical and communication system installation. Although the solicitation has not yet been formally issued, the forecasted posting date is July 31, 2026, indicating this is a forward-looking opportunity for qualified contractors to prepare proposals. The place of performance is within the Port of Seattle’s operational boundaries, and all contractors must be prepared to navigate port-specific logistics, security protocols, and environmental constraints during installation and commissioning.
Aviation Project Management Group

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Electrical Unit Price Portwide 2026_1 and _2This contract encompasses a broad range of electrical services to be performed across multiple Port of Seattle facilities including Seattle-Tacoma International Airport, maritime properties, and surrounding areas. The work includes but is not limited to the installation of raceways, wiring, medium voltage cabling, electrical boxes, transformers, temporary power and lighting systems, grounding, and associated testing, all in full compliance with applicable codes and regulations. The Contractor is responsible for providing all labor, tools, equipment, materials, and incidentals required to complete tasks as directed through Work Authorizations issued by the Port. Labor must be delivered according to the specified classifications outlined in the Schedule of Unit Prices, ensuring consistent pricing and accountability. The Port of Seattle anticipates a high volume of small-scale electrical projects over the coming year and plans to award two separate contracts under this solicitation to ensure sufficient capacity and rapid response times. The goal is to maintain operational continuity and meet dynamic project demands by leveraging two qualified contractors. The contract is identified under the NAICS code 238210 and is issued through Port Construction Services, with primary coordination handled by Heather Bowden and Lesley Miles. All work must be performed at designated Port-wide locations, and contractors are expected to adhere strictly to the terms and pricing structure detailed in the bid documents.
Port Construction Services

POSTED

about 9 hours ago

DEADLINE

N/A
View Details