Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 13, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solar PV Microgrid and Electric Vehicle Charger Design, Installation and Operation at Menlo Park Community Campus

Closed
2021-041321State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

7 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

23 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The City of Menlo Park is seeking proposals from qualified providers to develop a comprehensive renewable energy project at the Menlo Park Community Campus, which includes the design, procurement, permitting, installation, interconnection, and maintenance of solar photovoltaic systems, battery energy storage systems, microgrid energy management systems, and electric vehicle charging stations. The project aims to enhance resilience and cost-effectiveness by creating an islandable microgrid capable of operating independently if needed. Proposers have the flexibility to offer various financing options, including outright purchase, power purchase agreements, or other innovative financial arrangements, allowing the City to select the most advantageous approach. The contract encompasses all related documentation, warranties, and ongoing maintenance, ensuring a fully integrated and sustainable energy solution. The solicitation was posted on April 13, 2021, with a response deadline of May 25, 2021. The project is managed by the City of Menlo Park, California, under NAICS code 221114, indicating its focus on solar energy and related infrastructure. Interested parties can contact Nancy Melgar via email or phone for further details and access the full solicitation through the provided online portal. The initiative underscores the City’s commitment to advancing renewable energy infrastructure and resilience at the community level.

General Info

Agency

California → City of Menlo Park

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Menlo Park
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Menlo Park
Office AddressN/A

Full Description

Show more
The primary purpose of this Request for Proposals (RFP) is to identify qualified providers/developers of solar installations, battery energy storage systems, microgrid energy management systems (MEMS) and electric vehicle charging stations to support the City of Menlo Park (City) in developing a resilient and cost-effective renewable energy project and islandable MEMS at the Menlo Park Community Campus.The City seeks proposals from qualified Proposers for the design, procurement of materials, permitting, installation, interconnection, and all associated documentation, financing, maintenance, and warranties of Solar PV, BESS, Microgrid Energy Management Systems, and Electric Vehicle Charging Stations (collectively referred to as “Systems”) to be located at the Community Campus. It is anticipated that the Systems within the scope of this project may be purchased outright by the City or may be financed, owned, and operated by the Proposer under a Power Purchase Agreement (PPA). To provide best value for the City, various financing options are sought in the proposals so that the City can select from appropriate choices including, but not limited to, direct purchase, PPA, and other cost-effective options recommended by the Proposer. For more details please see Menlo Park Microgrid RFP.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS