Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Solar PV System Engineering and Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Solar PV System Engineering and Design involves providing technical design and engineering services for elevated solar arrays within Reclamation District 563 Tyler Island projects. The scope of work includes conducting site assessments, developing PV layouts, performing structural engineering for elevated racking, and executing electrical load calculations. All deliverables must be produced using solar modeling and CAD software to generate signed and sealed engineering plans and specifications. The project is categorized under NAICS code 541330 and requires the contractor to hold a valid Professional Engineer license in the state of California. These services are performed as a subcontractor to prime contractors to ensure all technical specifications and safety standards are met for the installation of the solar infrastructure.

General Info

Subcontract for solar PV engineering and design services for California's Reclamation District 563.

Agency

California → Reclamation District 563 Tyler Island

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of Reclamation District 563 - Tyler Island Solar Array.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 563 Tyler Island
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Reclamation District 563 Tyler Island
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical design and engineering for an elevated solar array for prime contractors on Reclamation District 563 Tyler Island projects. Conducts site assessment, PV layout design, structural engineering for elevated racking, and electrical load calculations. Uses solar modeling and CAD software to produce signed and sealed engineering plans and specifications. Requires a Professional Engineer (PE) license in California.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS