Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 18, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solicitation_GLEN 12-1027_Repair by Replacing Domestic Water Pumps B420

Closed
FA2550-20-R-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 11 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Colorado Springs, CO, 80912, USA

Set-Aside

SDVOSBC

Documents

22

00+GLEN+12-1027+Amendment+001+Purpose.docx

DOCX

00+GLEN+12-1027+Amendment+002+Purpose.docx

DOCX

00+GLEN+12-1027+Amendment+003+Purpose.docx

DOCX

00+Solicitation+-+FA255020R0002.pdf

PDF

01+SOW+GLEN+12-1027+2020-7-13.pdf

PDF

01+SOW+GLEN+12-1027+2020-7-21.pdf

PDF

01+SOW+GLEN+12-1027.pdf

PDF

02+Design+Analysis_Redacted+-+GLEN+12-1027.pdf

PDF

03+Requirements+-+01+55+04+-+SAFB+Security+Requirements.pdf

PDF

04+Design+Drawings+-+GLEN+12-1027.pdf

PDF

05+Existing+Conditions+Drawing+-+GLEN+12-1027.pdf

PDF

06+Schriever+AFB+IFS.pdf

PDF

07+SAFB+Environmental+Supplement.pdf

PDF

08+Planning+-+Project+AF+66+Form+-+GLEN+12-1027.xls

XLS

09+Wage+Determination+CO20200022.pdf

PDF

10+Specifications+-+GLEN+12-1027.pdf

PDF

11+Foundation+Drawing+-+GLEN+12-1027.pdf

PDF

Amendment+001+FA255020R00020001+SF+30.pdf

PDF

Amendment+002+FA255020R00020002+SF+30.pdf

PDF

Amendment+003+FA255020R00020003+SF+30.pdf

PDF

GLEN+12-1027+RFI+001+Responses.pdf

PDF

GLEN+12-1027+RFI+002+20-7-24+Answered.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jul 22, 2020 to Aug 3, 2020. The notice description changed.

Notice updated

Response deadline changed from Aug 3, 2020 to Jul 13, 2020. The notice description changed.

Notice updated

Response deadline changed from Jul 13, 2020 to Jul 31, 2020. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2550 50 Cons Pkp
Contacts2 people available
OfficeSCHRIEVER SFB, CO, 80912-2116, USA
Office AddressSCHRIEVER SFB, CO, 80912-2116, USA
Contacts

Full Description

Show more
AMENDMENT 003 UPDATE 7-27-20 The purpose of Amendment 003 is to: Incorporate RFI 002 responses containing 20 questions. AMENDMENT 002 UPDATE 7-21-20 The purpose of Amendment 002 is to: Incorporate RFI 001 responses containing 60 questions. Add attachment "11 Foundation Drawing - GLEN 12-1027" Adjust the Statement of Work (SOW) to list Attachment 11 and add into the attachments section, Section J, of the SF 1442. Adjust the deadline for submissions to 31 July 2020 by 1:00 PM Mountain Time. If there are additional RFIs critical to the requirement, then ensure they are submitted no later than 1:00 PM on Thursday, 24 July 2020. AMENDMENT 001 UPDATE 7-20-20: The purpose of Amendment 001 is to: Add attachment - 10 Specifications - GLEN 12-1027 Correct the Statement of Work (SOW) to appropriately reference Attachment 10 and list it in the attachments section, Section J, of the SF 1442. Extend the deadline for submissions to 3 August 2020 by 4:00 PM Mountain Time to allow for RFI responses (posted tentatively on 24 Jul 20) on Amendment 002. ORIGINAL: Rather than having two large domestic pumps, a combination of small and medium domestic pumps operating on Variable Frequency Drives (VFDs) shall cover a wider flow range. During normal operation, three pumps will cover a range of flow between about 100 GPM and 600 GPM. The Maximum Day Demand (MDD) plus fire flow demand shall be met with three medium pumps running in parallel. To provide a reliable water supply, a fourth identical medium pump shall be installed as a standby pump. Since the diesel fire pump is new as of 2012, this pump shall remain in service, as is, as a backup for firm capacity. Table 1 of the Design Analysis (pg 11, attached) lists the major pump and VFD equipment. Additionally, all steel water piping infrastructure in and around Building 420 requires replacement, with pipes resized for the flows from the new pumps, and equipped with new valves and fittings to provide simplicity of maintenance and repairs. Pipe replacement is detailed in the design drawings. The water distribution system shall supply water demands with sufficient service pressure and water quality over a range of fluctuating conditions that vary throughout the day and over the course of a year. AECOM created a hydraulic model using AFT Fathom software to verify and complete the final hydraulics. This included calculating the required head and pump turndown for each of the three pump types (Medium Pump, Small Pump, and Jockey Pump) at the required flow conditions, taking into account the frictional losses in the pipe system due to the recommended change in pipe sizes within the building. AECOM targeted a distribution pressure of 84 psi for normal water flow and 110 psi for fire flow. Refer to - Design Analysis_Redacted - GLEN12-1027 (attached) for more details on demand and pump operating points. The Contractor shall install a new fire department connection where easily accessed from the roadway. Exact location is to be determined by installer and approved by the SAFB fire department. Connection shall consist of two 2 - inch connections with NH internal threaded swivel fitting(s). Threading shall be 2.5 - 7.5 NH standard thread as specified in NFPA 1963.

More opportunities from Department Of Defense → FA2550 50 Cons Pkp

Same awarding agency

NAICS: 236220
Federal
USSF Construction CSO
Solicitation # USSF-CSO-FY26-2808A
The United States Space Force (USSF) Space Operational Contracting Headquarters has established a Master Commercial Solutions Opening (CSO) under solicitation number USSF-CSO-FY26-2808A to streamline the design, construction, repair, and alteration of base infrastructure. Authorized under 10 U.S.C. § 2808a, this framework utilizes Other Transaction (OT) authority, making all resulting agreements completely exempt from the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS). The Master CSO serves as an umbrella solicitation, with specific project requirements published separately as Areas of Interest (AOIs). All awards must be structured as fixed-price agreements, including firm-fixed-price, fixed-price incentive, or fixed-price award fee structures, while cost-reimbursable agreements are strictly prohibited. The solicitation process employs a phased down-select method to minimize industry costs, consisting of a Phase 1 White Paper, a Phase 2 Oral Pitch, and a Phase 3 Full Commercial Proposal. Evaluation focuses on technical merit, constructability, schedule viability, and fair and reasonable commercial pricing. Selected partners must adhere to commercial industry building codes such as IBC and NEC, and may be required to comply with Unified Facilities Criteria (UFC) and Anti-Terrorism/Force Protection (AT/FP) standards. Payment is managed through a milestone-based system, where fixed-price payments are triggered only upon the verifiable completion of work that has passed inspection. Additionally, contractors must comply with Davis-Bacon Act wage rates and maintain specific insurance coverages, including Professional Liability for design-build projects of at least $2M.
Commercial and Institutional Building Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS