Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Somarts Cultural Center - Ada Barrier Removal

Closed
20260720024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitory rooms, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, and electrical and plumbing repairs to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave provisions. Contractors must comply with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed. The project includes a one-year guarantee of workmanship and a specific 20-year product warranty for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return them to safe residential use, specifically targeting sixteen residential rooms and bathrooms, common areas, and mechanical rooms. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area, as well as the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including certified Veteran, Service-Disabled Veteran, Women-Owned, and HUBZone small businesses. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with general liability and worker's compensation insurance, within ten days of award. Key deliverables include a project schedule, safety plan, and a minimum one-year workmanship warranty upon final acceptance. Construction is scheduled to take place between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The project spans 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key structural elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the scope includes the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The comprehensive scope of work requires pricing for a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site preparation is extensive, involving clearing, rock excavation, grading, and mitigation for impacts on existing wetlands. Infrastructure improvements consist of new access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB certifications.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Somarts Cultural Center ADA Barrier Removal project, solicited by the City and County of San Francisco Public Works, aims to improve public accessibility on the first and second floors of the facility. The primary scope of work involves the installation of a new hydraulic Limited Use Limited Access (LULA) lift, an associated machine room, and a new stair. Additional requirements include accessible restroom upgrades, the installation of a new drinking fountain on the first floor, and modifications to the second floor to accommodate the lift and stair, which includes relocating an existing kiln. The project also encompasses limited aesthetic improvements, such as new restroom flooring, with an optional bid alternate for a durable epoxy coating on the main hall floor. This is a local government construction project awarded to the lowest responsible responsive bidder. Evaluation factors include bidder qualifications, safety records, experience statements, and Local Business Enterprise (LBE) participation. The contractor is responsible for adhering to strict packaging and marking standards, including ANSI/ASME pipe identification and engraved equipment nameplates, and must comply with various regulatory bodies such as OSHA, Cal/OSHA, and the California Building Code. Performance is measured by the successful installation of thermal and acoustic insulation systems and the completion of a one-week system operation test. Bids must be submitted as a single PDF via a designated ShareFile portal by the deadline of August 12, 2026.

General Info

Install hydraulic lift, accessible fixtures, and stair at SOMArts Center, San Francisco, by August 12, 2026.

Documents

8

Addendum No. 1 for SOMArts Cultural Center ADA Barrier Removal Electrical Plans

PDF, High priority: read this firstamendment
High

Addendum No. 1 for SOMArts Cultural Center ADA Barrier Removal Sourcing Event 0000002326

PDF, High priority: read this firstamendment
High

Addendum No. 2 for SOMArts Cultural Center ADA Barrier Removal

PDF, High priority: read this firstamendment
High

Addendum No. 2 for SOMArts Cultural Center ADA Barrier Removal Project

PDF, High priority: read this firstamendment
High

SOMArts Cultural Center ADA Barrier Removal Drawings

PDF, High priority: read this firstdrawings
High

SOMARTS Cultural Center ADA Barrier Removal Project Manual Volume 1 of 2

PDF, High priority: read this firstproject-manual
High

SOMArts Cultural Center ADA Barrier Removal Project Manual Volume 2 of 2

PDF, High priority: read this firstproject-manual
High

Pre-Bid Site Walk Conference Sign-In Sheet for SOMArts Cultural Center ADA Barrier Removal

PDF, Low prioritypre-bid-sign-in-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco, San Francisco Public Works
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #0000002326: The project aims to improve public accessibility to the SOMArts Cultural Center's first and second floors. The scope of work includes the installation of a new hydraulic Limited Use Limited Access (LULA) lift with an associated machine room and stair. It also involves accessible restroom upgrades and a new drinking fountain on the first floor. On the second floor, modifications will be made to accommodate the new lift and stair, including relocating an existing kiln. The project also features limited aesthetic upgrades, such as new restroom flooring, and an optional bid alternate to apply a durable epoxy coating to the main hall floor.

More opportunities from California → City and County of San Francisco, San Francisco Public Works

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS