Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Sonoma County 2026 Pavement Preservation Program

Forecast
26-0527-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sonoma County 2026 Pavement Preservation Program encompasses pavement treatments on 21 road segments throughout the county, including asphalt concrete overlays, full depth reclamation with overlays, slurry seals, cape seals, and double chip seals, with specific treatments assigned to each segment. Additional improvements involve replacing metal beam guard rails across the project roads, requiring minimal excavation confined to existing right-of-way areas for foundation removal and installation. Shoulder maintenance will focus on mowing and clearing vegetation, sediment, and debris from roadside ditches to restore proper drainage, with no ground disturbance in areas where only mowing is performed. Select culverts deemed damaged or failing will be replaced, mostly in-kind, with limited excavation strictly within the roadbed and minimal disturbance of up to five feet at inlets and outlets. Some culverts will be upsized, elongated, or realigned to handle 100-year flow events, with rock slope protection installed at outlets to control erosion and preserve water quality. Headwalls at existing headways will be replaced as needed to accommodate higher flows. Tree trimming to a 15-foot standard will occur to ensure construction access, with up to four trees scheduled for removal to facilitate culvert replacements on specified road segments. All construction will use standard equipment such as excavators, pavers, compactors, graders, and backhoes, with staging limited to existing stabilized shoulders within public right-of-way and no activity on private property. Traffic will be maintained on overlay roads during construction, while full-depth reclamation sections may require daytime detours due to constriction of roadway width.

General Info

Sonoma County to treat 21 road segments with pavement upgrades, guard rail replacement, drainage fixes, culvert updates, and limited tree removal within right-of-way.

Agency

California → Sonoma County

Place of Performance

Multiple, CA, Multiple

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Olguin CabanAssistant Engineer

Full Description

Show more
Road Work \ The Project would consist of an asphalt concrete overlay (Overlay), a Full Depth Reclamation (.FDR) with an overlay, a slurry seal, a cape seal, or a double chip seal on 21 road segments located throughout . '· l Sonoma County. Refer to Table 1: Project Roads and Proposed Work for which road segment would receive which treatment. Additional improvements to bring the Project road segments up to current standards would include replacement of metal beam guard rail. Replacement of guardrails would require removal of existing guardrails, excavation to accommodate new guardrail foundations, and installation of new guardrail. Excavation required would be minimal and limited to where existing guardrail foundations were removed within the existing right of way. Water Quality Work As part of the Project, shoulder maintenance would involve mowing and/or clearing to remove accumulated vegetation sediment, and debris in existing roadside ditches to restore contours and reestablish flow lines. All areas to be cleaned are located within the existing right of way. In some areas, only mowing existing vegetation would occur. No ground disturbance would occur in mowed areas. In areas where sediment and debris are hampering drainage function, material sufficient to restore function would be removed from the area and properly disposed of. Culvert replacement would occur for select damaged or failing culverts located within Project road segments. All culvert replacement would entail excavation through the existing roadbed to the existing culvert, culvert removal, placement of a new culvert at grade, and restoration of culvert inlet and outlet to existing flow lines. Excavation would be limited to what is required for existing culvert removal and placement of the new culvert primarily within the existing roadbed. Most culverts would be replaced in-kind. Limited ground disturbance would occur at the inlet and outlet of culverts replaced in-kind to restore flow lines. Disturbance is only anticipated to extend up to five feet from the culvert inlet and outlet. Some culverts would be replaced with enlarged, elongated, and/or realigned culverts to accommodate 100-year flows. Energy dissipaters comprised of rock slope protection would be placed as needed at the outlet of upsized to culverts to accommodate the new flows, minimizing erosion and preserving water. quality. Locations with existing headways would have the headwalls replaced as needed to accommodate 100-year flows. While the Project would not require landscape improvements, tree trimming to a standard height of 15 feet would occur as necessary to provide access for construction equipment and guardrail installation. Up to four trees could be removed to facilitate the replacement of culverts on the following roads: • Walling Rd PM 11.555 • Mill Creek Road PM 17.007 • Mill Creek Road PM 18.540 • Dry Creek Road PM 12.127 Construction Construction activities .would require standard construction equipment for asphalt and concrete demolition, roadway excavation, paving, striping, and shoulder maintenance. This would include use of an excavator, paver, compactor, grader, and backhoe. Construction staging and parking would be accommodated within the Project site on paved or stabilized, flat shoulder areas within public right of way. No construction staging would occur on private property. All Project work is anticipated to occur within the existing road and right of way or in limited previously disturbed areas adjacent to culverts as required for culvert replacement. During construction, standard traffic control mechanisms would be used to maintain vehicular access on AC Overlay roadways. The FDR roadways may require detours between the hours of 8:30 AM to 5:30 PM, as the existing roadway width may not allow for traffic flow during construction.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and utility construction services, including underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, shoring, subsurface investigation, and site clearing. Additional requirements include surface improvements like asphalt paving, traffic signals, and landscaping, along with environmental support services such as storm water pollution prevention (SWPPP) and quality control. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must hold a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Certified DBE, MBE, WBE, or OBE firms must provide certification from an approved agency prior to the bid opening. Quotes will be considered from bidders who can maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS