Sonoma County 2026 Pavement Preservation Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sonoma County 2026 Pavement Preservation Program encompasses pavement treatments on 21 road segments throughout the county, including asphalt concrete overlays, full depth reclamation with overlays, slurry seals, cape seals, and double chip seals, with specific treatments assigned to each segment. Additional improvements involve replacing metal beam guard rails across the project roads, requiring minimal excavation confined to existing right-of-way areas for foundation removal and installation. Shoulder maintenance will focus on mowing and clearing vegetation, sediment, and debris from roadside ditches to restore proper drainage, with no ground disturbance in areas where only mowing is performed. Select culverts deemed damaged or failing will be replaced, mostly in-kind, with limited excavation strictly within the roadbed and minimal disturbance of up to five feet at inlets and outlets. Some culverts will be upsized, elongated, or realigned to handle 100-year flow events, with rock slope protection installed at outlets to control erosion and preserve water quality. Headwalls at existing headways will be replaced as needed to accommodate higher flows. Tree trimming to a 15-foot standard will occur to ensure construction access, with up to four trees scheduled for removal to facilitate culvert replacements on specified road segments. All construction will use standard equipment such as excavators, pavers, compactors, graders, and backhoes, with staging limited to existing stabilized shoulders within public right-of-way and no activity on private property. Traffic will be maintained on overlay roads during construction, while full-depth reclamation sections may require daytime detours due to constriction of roadway width.

General Info

Sonoma County to treat 21 road segments with pavement upgrades, guard rail replacement, drainage fixes, culvert updates, and limited tree removal within right-of-way.

Agency

California → Sonoma County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Multiple, CA, Multiple

Set-Aside

NONE

Documents

(1)

Sonoma County 2026 Pavement Preservation Program Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Olguin CabanAssistant Engineer

Full Description

Show more
Road Work \ The Project would consist of an asphalt concrete overlay (Overlay), a Full Depth Reclamation (.FDR) with an overlay, a slurry seal, a cape seal, or a double chip seal on 21 road segments located throughout . '· l Sonoma County. Refer to Table 1: Project Roads and Proposed Work for which road segment would receive which treatment. Additional improvements to bring the Project road segments up to current standards would include replacement of metal beam guard rail. Replacement of guardrails would require removal of existing guardrails, excavation to accommodate new guardrail foundations, and installation of new guardrail. Excavation required would be minimal and limited to where existing guardrail foundations were removed within the existing right of way. Water Quality Work As part of the Project, shoulder maintenance would involve mowing and/or clearing to remove accumulated vegetation sediment, and debris in existing roadside ditches to restore contours and reestablish flow lines. All areas to be cleaned are located within the existing right of way. In some areas, only mowing existing vegetation would occur. No ground disturbance would occur in mowed areas. In areas where sediment and debris are hampering drainage function, material sufficient to restore function would be removed from the area and properly disposed of. Culvert replacement would occur for select damaged or failing culverts located within Project road segments. All culvert replacement would entail excavation through the existing roadbed to the existing culvert, culvert removal, placement of a new culvert at grade, and restoration of culvert inlet and outlet to existing flow lines. Excavation would be limited to what is required for existing culvert removal and placement of the new culvert primarily within the existing roadbed. Most culverts would be replaced in-kind. Limited ground disturbance would occur at the inlet and outlet of culverts replaced in-kind to restore flow lines. Disturbance is only anticipated to extend up to five feet from the culvert inlet and outlet. Some culverts would be replaced with enlarged, elongated, and/or realigned culverts to accommodate 100-year flows. Energy dissipaters comprised of rock slope protection would be placed as needed at the outlet of upsized to culverts to accommodate the new flows, minimizing erosion and preserving water. quality. Locations with existing headways would have the headwalls replaced as needed to accommodate 100-year flows. While the Project would not require landscape improvements, tree trimming to a standard height of 15 feet would occur as necessary to provide access for construction equipment and guardrail installation. Up to four trees could be removed to facilitate the replacement of culverts on the following roads: • Walling Rd PM 11.555 • Mill Creek Road PM 17.007 • Mill Creek Road PM 18.540 • Dry Creek Road PM 12.127 Construction Construction activities .would require standard construction equipment for asphalt and concrete demolition, roadway excavation, paving, striping, and shoulder maintenance. This would include use of an excavator, paver, compactor, grader, and backhoe. Construction staging and parking would be accommodated within the Project site on paved or stabilized, flat shoulder areas within public right of way. No construction staging would occur on private property. All Project work is anticipated to occur within the existing road and right of way or in limited previously disturbed areas adjacent to culverts as required for culvert replacement. During construction, standard traffic control mechanisms would be used to maintain vehicular access on AC Overlay roadways. The FDR roadways may require detours between the hours of 8:30 AM to 5:30 PM, as the existing roadway width may not allow for traffic flow during construction.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS