Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Soulajule Emergency Culvert Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Soulajule Emergency Culvert Replacement Project, managed by the Marin Municipal Water District in California, involves the urgent in-kind replacement of a failed 120-linear-foot, 72-inch corrugated metal pipe culvert beneath 3 Peaks Fire Road. The existing structure has separated and displaced, causing sinkholes and erosion that threaten the roadway embankment. Because this road is the sole access point for a residence and critical water supply infrastructure at the Soulajule Reservoir, the project is essential to prevent roadway failure and ensure the uninterrupted delivery of water services. The scope of work includes installing a new 72-inch corrugated metal pipe culvert within the existing alignment to maintain the same drainage function. Contractors will perform excavation and backfilling, restore the roadway and embankment, and install rock slope protection at the inlet and outlet to mitigate future erosion. All disturbed areas will be fully restored upon completion of the project.

General Info

Marin Municipal Water District replacing a failed 72-inch culvert beneath 3 Peaks Road.

Agency

California → Marin Municipal Water District

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

3 Peaks Fire Road, CA

Set-Aside

NONE

Documents

(1)

NOE_SoulajuleCulvert_August_Filed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marin Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Marin Municipal Water District
Office AddressN/A
Contacts
Carly BlanchardEnvironmental Planner

Full Description

Show more
The Project consists of the emergency, in-kind replacement of a failed 120-linear-foot, 72-inch corrugated metal pipe (CMP) culvert beneath 3 Peaks Fire Road adjacent to Soulajule Reservoir. The existing culvert has failed and separated at two coupling locations, with portions of the culvert displaced into the channel. The failure has resulted in erosion, sinkhole formation, and degradation of the roadway embankment, creating an imminent risk of roadway failure. The roadway provides the only access to a residence and critical District water supply infrastructure at Soulajule Reservoir. District access to the critical water infrastructure in this area is necessary to ensure uninterrupted delivery of water service. The failed culvert will be replaced in-kind with a new 120-linear-foot, 72-inch CMP culvert within the same alignment and serving the same drainage function. Associated work will include excavation and backfilling, restoration of the roadway and embankment, and installation of rock slope protection at the culvert inlet and outlet to stabilize the embankment and reduce future erosion. Disturbed areas will be restored following completion of the work.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
David C. McCollom WTP Membrane Basin Rehabilitation
Solicitation # david-c-mccollom-wtp-membrane-basin-rehabilitation
Kiewit Infrastructure West Co. is soliciting quotes for the David C. McCollom WTP Membrane Basin Rehabilitation project located in California. The scope of work includes a variety of services such as demolition, concrete rehabilitation, metals, painting and coating, mechanical insulation and testing, adjusting and balancing, and dumpster or trash services. Interested firms must contact Kiewit to receive an official Invitation to Bid through the Building Connected system. This solicitation includes set-asides for various small business categories, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Disadvantaged Business Enterprises. To be considered a responsive bidder, firms must hold a valid California Contractor’s license appropriate to their trade and provide acceptable insurance coverage. Responsible subcontractors and material contractors are required to provide bonding for 100% of their contract value, though Kiewit will reimburse the bond premiums. Additionally, Kiewit is a signatory to several collective bargaining agreements involving carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. The deadline for responses is September 1, 2026, and further inquiries regarding project specifics, scheduling, or materials should be directed to the Lead Estimator.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details