Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Justice was posted on June 2, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SOURCES SOUGHT - CHICAGO EROSION ENVIRONMENTAL CONSTRUCTION

Closed
CE-ChicagoErosion-FAUFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Sandlake Road Slide(MP10.6)(Tierra Del Mar); 23788; CA/CEI
Solicitation # S-73000-00018190
Solicitation S-73000-00018190 is a Mini-RFP issued by the Oregon Department of Transportation to secure Construction Contract Administration and Construction Engineering and Inspection (CA/CEI) services. The project focuses on rebuilding Sandlake Road at MP10.6 in Tierra Del Mar following a landslide that damaged the southbound lane. The anticipated period of performance begins on December 15, 2026, and is expected to conclude by July 16, 2029. Funding for the project is provided by the Federal Highway Administration. The contract will be structured as a Work Order Contract assigned under an existing Price Agreement. Compensation is based on a Time and Materials model with a Not-to-Exceed maximum, though the final statement of work, payment amount, and delivery schedule will be negotiated with the top-ranked proposer. Award selection is based on a scoring system totaling 100 points for the technical proposal—covering philosophy, project samples, management, and cost-effectiveness—plus up to 25 additional points for potential interviews. Qualified proposers must ensure that services are performed under the authority of an inspector certified by the Oregon Department of Transportation Quality Assurance Certification Program. Additionally, firms must maintain a Consultant Quality Plan and certify compliance with conflict of interest guidelines, non-discrimination laws, and sexual harassment policies for contracts exceeding 150,000 dollars. Proposals must be submitted via OregonBuys as a single PDF file not exceeding five pages and five megabytes.
Procurement

POSTED

about 8 hours ago

DEADLINE

in 7 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Chicago, IL, USA

Set-Aside

LAS

Documents

1

Sources+Sought_ChicagoErosion.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fbi-Jeh
Contacts1 person available
OfficeWASHINGTON, DC, 20535, USA
Office AddressWASHINGTON, DC, 20535, USA
Contacts
Britt Sanford

Full Description

Show more
This notice is for informational purposes only. This is not a request for proposal or quote. It does not constitute a solicitation and shall not be construed as a commitment by the government. Responses in any form are not offers and the government is under no obligation to award a contract as a result of this announcement. No funds are available to pay for preparation of responses to this announcement. Any information submitted by respondents to this technical description is strictly voluntary. The Federal Bureau of Investigation (FBI) is issuing this Sources Sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support this requirement for an erosion control environmental construction project at the training facility in North Chicago, Illinois, along the shoreline of Lake Michigan. The project's scope covers a steep tree covered bluff extending from an elevation of approximately 650 feet to the lake level currently at an elevation of approximately 582 feet. There is on-going degradation at the toe of the bluff causing the loss of a northerly portion of the bluff, which was the basis of the FBI's initial concerns regarding the bluff conditions, as well as erosion/incision on the bluff from stormwater runoff spilling over the edge of the bluff. Based on aerial imagery, there are at least two locations where incisions are occurring. Left untreated, the depth and width of the incisions will increase, washing away vegetation and further destabilizing the bluff. It is also likely additional incision zones will appear over time. To prevent surface runoff from the top of the bluff from creating such incisions, drainage improvements are proposed at the top of the bluff to intercept the runoff before it reaches the bluff and convey the runoff to the lake. The project will include but not limited to: 1. Contractor shall review any available information for the area of the work to determine any impacts on the scope of work including any previous repair work or projects completed including all reports, drawings, field reports, and photographs to use as the basis for the new work and gain familiarity with the site. 2. Contractor shall survey the existing conditions of the buff area for familiarization to determine the deficiencies found and verify the appropriate approach for repair and replacement of the affected areas. 3. Contractor shall prepare and submit a QA/QC Plan defining the quality requirements, procedures and processes to be implemented for the project. 4. Contractor shall prepare and submit a Safety Plan defining all of the safety requirements, procedures and processes to be implemented for the project. 5. Contractor shall prepare and submit a project schedule showing progress of all major portions of the work and project milestones. 6. Contractor shall follow all environmental requirements for the project. 7. Contractor shall prepare a phasing work plan for sequencing of the work to minimize the impact of the work on training activities for that will continue to use areas of the site during construction. The Government is looking at two phases of the work. The first is the top of bluff stabilization and stormwater control measures and the second phase is the 8. Contractor will provide temporary safety barriers and signage for protection of people and the work during construction. 9. Contractor shall be responsible for providing the following work tasks for the erosion control work based on the construction documents developed for the project. a. Installation of a storm sewer running parallel to the top of the bluff conventionally by open cutting a trench with drainage inlets placed at regular intervals. b. Grading improvements including a shallow swale to capture the runoff flowing toward the bluff and to convey the runoff into the sewer inlets. c. Connecting any existing storm sewer lines to the new sewer system running perpendicular to the bluff installed by directional drilling methods to eliminate point source discharges onto the side of the bluff. d. Installing an anchored sheet pile retaining wall at the top of the slope with the sheet pile wall driven down 25 to 30 feet from the top of the slope. e. Placing a cap on the top of the sheet pile retaining wall and anchoring a new FBI approved security fence at the top of the wall. f. Providing slope improvements to include brush removal, selective tree removal, and tree trimming to open the bluff ground to sunlight. g. The bluff should then be revegetated with deep rooted grasses to hold the surface topsoil in place and resist erosion. h. Place and install armor stone, similar to the stone used along the lakefront south of the FBI Training Facility in Foss Park, at the toe of the slope to reduce the regression of the crest of the slope and protect the toe of the slope from wave action.

More opportunities from Department Of Justice → Fbi-Jeh

Same awarding agency

NAICS: 424480
Federal
Food Supply & Commissary LogisticsThe contract requires secure, daily delivery and logistics services to support all food service operations at the FBI headquarters in Washington, D.C., specifically ensuring the timely and safe transport of fresh produce, dairy, proteins, dry goods, and branded consumables. All deliveries must meet strict security and handling standards appropriate for a federal facility, with protocols in place to maintain product integrity, temperature control, and chain-of-custody accountability throughout the supply chain. The vendor must operate with high reliability, consistency, and discretion given the sensitive nature of the location and the critical need to sustain daily operations without disruption. This subcontract falls under NAICS code 424480, which pertains to grocery and related product merchant wholesalers, indicating the focus is on wholesale distribution logistics rather than retail or manufacturing. Performance is centralized at the FBI headquarters with a ZIP code of 20535, and the contract is managed under the Department of Justice through the FBI-JEH office. While no set-aside provisions or point of contact details are specified, the contract demands operational precision, compliance with federal security protocols, and the ability to integrate seamlessly into the existing food service infrastructure without compromising safety or efficiency.
Fresh Fruit and Vegetable Merchant Wholesalers

POSTED

3 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS