This Sources Sought opportunity from Department Of Energy was posted on June 17, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SOURCES SOUGHT FOR DESIGN AND INSTALLATION SERVICES FOR FAILED EQUIPMENT STORAGE VAULTS #3 AND #4 IN THE DEFENSE WASTE PROCESSING FACILITY (DWPF) AT THE SAVANNAH RIVER SITE NEAR AIKEN, SOUTH CAROLINA

Closed
SRR-SCM-2020-00270Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

SC, 29808, USA

Set-Aside

NONE

Documents

1

Attachment+1-+Conceptual+Design+Drawings-+FESV.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Jun 19, 2020 to Jun 26, 2020. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Savannah River Remediation-Doe Cntr
Contacts1 person available
OfficeAiken, SC, 29808, USA
Office AddressAiken, SC, 29808, USA
Contacts

Full Description

Show more
PURPOSE The purpose of this inquiry is to determine your interest and qualifications as a possible Offeror to perform design and construction services in the Defense Waste Processing Facility (DWPF) for Savannah River Remediation (SRR) at the Savannah River Site (SRS). In addition, this inquiry also provides an opportunity for SRR to ask pertinent questions of potential subcontractors. The current Procurement Specification will request subcontractor(s) to provide Failed Equipment Storage Vaults (FESV) #3 and #4 design and construction. This potential Design/Build subcontract will be performed with labor whose wages are subject to the Davis-Bacon Act. GENERAL DESCRIPTION OF SERVICE The specified facility that is Subcontractor's responsibility consists of two underground reinforced concrete Vaults approximately 28 long x 18 wide x 21 with a common interior wall. The new vaults will be constructed adjacent to existing Vaults 1 and 2 which stores failed equipment containing radioactive waste. In order to protect existing Vaults 1 and 2 and other existing components sheet piling may be required. Additional scope will be to lengthen the gantry crane rail tracks and replace cabling, providing level instrumentation in new sumps wired to existing DCS (Delta V Distributed Control System) as well as connecting the vaults to the existing drain water tank. These Vaults are within the site boundaries of DWPF which is a radiologically controlled area. This SS/RFI does not include the design and construction of the Melter storage boxes to be stored in the vaults. Project details are available in the Project Conceptual Design Documents (Attachment #1). Note: Specifications or Standards referenced on the drawings will not be provided for this SS/RFI. National consensus codes and standards will be used for this project. All required Geotechnical information will be provided by SRR. The project is planned to be executed in two phases; Phase 1 - Design and Phase 2 - Construction. This SS/RFI will be for the execution of both phases. The FESV #3 and #4 are considered safety related structures and are required to be designed to meet natural phenomena hazard (NPH) criteria in accordance with Department of Energy (DOE) Standards. This project will have considerable Department of Energy and SRR Management (DOE-SR) interest. SOURCES SOUGHT/REQUEST FOR INFORMATION (SS/RFI) DISCLAMER SRR will use the information obtained in your response to this SS/RFI to determine your firm's ability and interest in performing this service. This SS/RFI is for INFORMATIONAL PURPOSES ONLY. THE ATTACHED DESIGN DOCUMENTS ARE CONSIDERED FOR THIS REQUEST TO BE IN DRAFT FORM. EXPENSES RELATED TO SOURCES SOUGHT/REQUEST FOR INFORMATION (SS/RFI) SUBMISSIONS This SS/RFI does not commit SRR to issue a future solicitation for these services or to award a subcontract, nor to pay any costs incurred in the development and submission of any response. Funds are not presently available for any subsequent procurement action. SOURCES SOUGHT/REQUEST FOR INFORMATION (SS/RFI) SUBMITTAL INSTRUCTIONS The response should demonstrate your overall qualifications and proven capabilities in supplying the design and equipment and services required to perform the scope based on the attached Project Conceptual Design Documents (Attachment #1). The information specified below is requested. 1. Organization and Experience Demonstrate that your firm has sufficient resources and experience, or if you propose to perform the potential subcontract by use of a partnering agreement with another firm, or with the use of sub-tier subcontractors/suppliers. 2. Service Capability (Equipment, Personnel, and Facilities) and Scope Performance Provide documentation to indicate that your firm has the capability, equipment, personnel resources, and facilities necessary to perform the work scope. If you are not capable of performing the entire scope, are there any portions of the scope that your firm would be interested in performing? 3. Design Demonstrate that your firm or partnered firm has sufficient resources and experience. 4. Quality Assurance Program Demonstrate your firm's Quality Assurance program. Are you NQA-1 qualified? If not, do you have a Quality Assurance program that will meet any other nationally recognized standards? 5. Project Duration Based on your firm's experience and expertise, please provide rough estimates of project duration for Phase 1 and Phase 2. Phase 1 being Design and Phase 2 being Construction. REQUIREMENTS Potential Offerors need to be aware of SRR Subcontract Requirements as follows: SRR is a Davis-Bacon Act worksite, and Subcontractors and Lower-tiers Subcontractors are required to be signatories to the Project Labor Agreement (Union Labor). Proposal, Payment and Performance bonds will be required. Environmental Safety and Health Evaluation Worksheet for the past three (3) calendar years will be required with OSHA 300 logs to support. SRR requires an Experience Modification Rate (EMR) of 1.0 or less and a Total Recordable Case (TRC) rate of 3.4 or less. Potential Federal Budget constraints will be presented within the request for proposal (RFP). Representations and Certifications will be required and will be part of the RFP. Small Business Subcontracting Plans will be required of Large Business Offerors. North American Industry Classification System (NAICS): 237110 SUBCONTRACT TYPE It is anticipated that if the requirement referenced in this SS develops into a future procurement action, the end result will be a fixed-price subcontract. Following a formal RFP and Pre-Proposal meeting at SRR, a single subcontract is planned; however, SRR reserves the right to make multiple awards. Award will be made to the Offeror(s) whose proposal(s) best conforms to any resultant RFP and is determined by SRR to be the most advantageous. SRR will evaluate the proposals based on a Best Value approach. An award is anticipated in fiscal year 2021 (FY21). SUBMISSION OF RESPONSES If you do not plan to submit a response, a brief letter indicating your lack of interest and reasons would be appreciated. SS/RFI responses will be received by SRR via email at contact@example.gov or at the following address until June 26, 2020 close of business day by 5:00 pm EST. Within the response, please provide mailing address for an RFP via express delivery (FedEx or UPS). Savannah River Remediation, LLC. ATTN: Arika N. King Bldg. 707-9B Aiken, SC 29808 Offerors can review typical Davis-Bacon Subcontract documents at: SRRemediation.com, then to Business Opportunities, then to Documents and Forms. Please direct all questions to Arika King via email at contact@example.gov. Procurement Reference Documents such as standard terms and condition, standard representations and certifications, subcontractor safety program guidance, and other forms are located at the Savannah River Site web address: http://www.srremediation.com/business.html.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS