This Sources Sought opportunity from Department Of Defense was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought for Regional Dredge IDIQ MATOC

Closed
W9123726X1BM8Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

about 19 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
KB Dock Piers Ladder Replacement
Solicitation # N0025326Q0009
The Naval Undersea Warfare Center Division Keyport is soliciting a firm-fixed-price construction contract, designated as RFQ N0025326Q0009, for the replacement of emergency pier ladders at KB Dock in Bangor, Washington, and the Keyport Main Pier in Keyport, Washington. The scope of work involves removing thirteen 20-foot ladder extensions and two upper ladder sections, and installing twelve new 20-foot aluminum ladders and two new upper ladder sections. All new hardware must be constructed from 6061 marine-grade aluminum with nonslip rungs. The estimated magnitude of the requirement is between $100,000 and $250,000, and the project is 100% set aside for small business concerns under NAICS code 237990. Award will be based on the Lowest Price Technically Acceptable (LPTA) method, evaluating technical capability, past performance, and safety records. Offerors must demonstrate at least three years of experience in commercial or industrial applications and provide a stable safety rating based on DART and TCR rates over the last five years. Key requirements include the provision of a Site Safety and Health Officer with a 30-hour OSHA construction safety certification and adherence to EM-385-1-1 safety standards, including the presence of a rescue boat during working hours. Bid bonds are required for proposals of $150,000 or more, and performance and payment bonds must be submitted within ten days of award. All proposals must be submitted digitally, and the contractor must maintain active registration in the System for Award Management.
Naval Undersea Warfare Center

POSTED

about 19 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

This sources sought notice is a market research initiative by the U.S. Army Corps of Engineers, Huntington District, aimed at identifying qualified small business contractors for a potential Multiple Award Task Order Contract (MATOC) focused on mechanical dredging, clearing, and snagging operations across the Nashville, Louisville, Huntington, and Pittsburgh districts within the Great Lakes and Ohio River Division. The Government intends to award up to three indefinite-delivery, indefinite-quantity (IDIQ) contracts with a one-year base period and four one-year option periods, totaling a not-to-exceed ceiling of $80 million shared among all awardees. Work will be executed through negotiated firm-fixed-price task orders, with production rates set between 0 and 350 tons per hour and grade accuracy tolerances defined by the Government. Contractors must be able to mobilize equipment and crews within 24 hours for emergency response and demonstrate experience with independent, simultaneous, and land-based dredging operations, including construction of in-water sediment control dikes and upland disposal work. To qualify as small under NAICS code 237990, firms must perform at least 40% of the dredging volume using their own or another small business’s equipment, and all respondents must self-certify their status as Small Business, Small Disadvantaged Business, HUBZone, Woman-Owned, or Service-Disabled Veteran-Owned. A critical requirement is compliance with the U.S. Army Corps of Engineers’ Dredging Quality Management (DQM) system, with offerors required to describe prior experience with DQM, current capability to implement it, and whether it would affect their ability or willingness to respond to future solicitations. In addition to technical qualifications, proposers must provide detailed past performance data (not counted toward the 30-page limit), comprehensive equipment inventories including make, model, age, and condition, organizational structure, safety and quality control protocols, and bonding capacity documentation. Responses must be submitted electronically by May 8, 2026, to Amy Davis, and must include the firm’s DUNS number and geographic interest in supporting the four specified districts. The Government is seeking feedback on potential impacts of consolidating these requirements into a single MATOC, including concerns about regional restrictions, the feasibility of performance across multiple districts, and whether subdividing the Huntington District into smaller geographic regions would improve participation. No solicitation, specifications, or drawings are available, and no award will result from this notice—it is strictly for market research to inform future procurement

General Info

U.S. Army Corps seeks small businesses for potential dredging MATOC up to $80M across four districts with 24-hour mobilization and DQM compliance.

Agency

Department Of Defense → W072 Endist HuntingtonView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Huntington, WV, USA

Set-Aside

NONE

Documents

(3)

Sources Sought for Regional Dredge IDIQ MATOC W9123726XXxxx

DOCXsources-sought

Regional Mechanical Dredge Map - Ohio River Districts

PDFother

Huntington+District+Boundary+Map+-+Attachment+1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts2 people available
OfficeHUNTINGTON, WV, 25701-5000, USA
Organization / Agency
Department Of Defense → W072 Endist Huntington
View Agency Profile
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more

This is a SOURCES SOUGHT NOTICE FOR MARKET RESEARCH ONLY – This notice does not constitute a solicitation announcement or restrict the Government to an ultimate acquisition approach, and NO AWARD will occur from this notice. NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS are available for this notice. Responses to this Sources Sought notice will be used by the Government to make appropriate acquisition decisions.



The purpose of this notice is to gain knowledge of potentially qualified small business sources to include small businesses in the following categories: Small Business, Small Disadvantaged Business, Certified HUBZone, Woman-Owned, and Service-Disabled Veteran-Owned relative to NAICS code 237990, which has a Small Business size standard of $30 million or less. To be considered small for purposes of Government procurement, a firm must perform at least 40% of the volume dredge with its own equipment or equipment owned by another small business dredging concern. Responses will be used to determine appropriate acquisition decisions. A target of three (3) indefinite delivery contracts (IDC) will be negotiated and awarded with one (1) year base period and four (4) one (1) year option periods. The not-to-exceed amount for this IDC will be $80,000,000.00 and will be shared amongst MATOC contractors. Work will be issued by negotiated firm-fixed price task orders. This will be a regional contract, and task orders may be issued for mechanical dredging/clearing and snagging work in any of the following LRD Districts: Nashville (LRN), Louisville (LRL), Huntington (LRH), and Pittsburgh (LRP). This includes any navigable waters and navigable tributaries of the Ohio River, above it’s confluence with the Mississippi River. However, responses to the questions below could affect this overall decision. Work performed will approximately rank between 0 cubic yards and 400,000 cubic yards, with a production rate for each respective task order ranging between 0 tons per hour to 350 tons per hour. This rate will be determined by the Government and is a mandatory performance metric for each task order. The selected contractor(s) must have the ability to deploy equipment large enough to meet required production rates, as well as grade accuracy tolerances, satisfactory to the Government. The following dredge scenarios may be used in individual task orders.



Independent Dredge/Disposal: Dredging and disposal activities are performed by the same piece(s) of equipment at different times. This may involve more than one crane (derrick, excavator, etc) but dredge and disposal activities do not occur simultaneously. This also includes projects in which all dredged material is loaded at one location, then transported to another area for disposal via another piece of equipment.



Simultaneous Dredge/Disposal: A project in which two or more separate cranes (derricks, excavators, etc) are dedicated separately to the material loading and unloading actions for a single task order. Loading and unloading activities shall take place simultaneously with a continuous transfer of material from dredge area to disposal site.



Land Based: Dredging is performed from the bank by land-based equipment.



Responses to this Sources Sought announcement must include the contractor’s type of business such as Small Business, 8(a), HUBZone, etc, and their DUNS number. Responses shall include a qualifications statement along with documentation to support Technical Capabilities and Specialized Experience including:


      a. Experience in Mechanical Dredging/Clearing and Snagging work (company information and employees’ experience)


            b. Efficient mobilization (within 24 hours) of experienced dredging crews (including equipment) not limited to, barge mounted crane(s) material barge(s), tow boats, etc. for use in occasional emergency dredge situations.


            c. Ability to provide land-based services for upland disposal work, water and/or land based services for the construction of in-water disposal containment and sediment control dikes.


            d. The U.S. Army Corps of Engineers has recently implemented updated Dredging Quality Management (DQM) requirements for dredging operations. Please provide responses to the following:


  • Have you previously implemented or operated under DQM requirements on prior dredging contracts? If so, briefly describe your experience.
  • Are you currently capable of obtaining and integrating the required DQM systems, instrumentation, and support services for your mechanical dredging fleet? Please describe any existing capabilities or anticipated challenges.
  • Would the inclusion of DQM requirements affect your company’s ability or decision to submit an offer or express interest in a future IDIQ MATOC contract for mechanical dredging? If yes, please explain how (e.g., cost, schedule, technical barriers).
  • Respondents are encouraged to provide any additional comments or recommendations regarding the DQM requirements and their potential impact on industry participation.


Additionally, contractors are requested to provide the following Past Performance information; a list of relevant projects, current and/or completed, in the past five (5) years that best demonstrates competence with this type of work, include dates, locations, types of contracts, dollar amounts/values, description of the work and references. The following Management and Administration information shall also be included: Personnel and Organization Quality Control, Safety, and Location of the Firm. The responding firm must also provide a list of equipment and its availability. Describe each piece of equipment to include, at a minimum, the number of pieces of each type of equipment and name, manufacture, model, age, and condition of each piece of equipment. The firm must be able to mobilize equipment to respond to an emergency situation within 24 hours’ notice.



Also, contractors are requested to respond to the following questions:


            1. Will consolidating these dredging requirements into a Multiple Award Task Order Contract (MATOC) for a base period of one year and four one year option periods impact your ability to compete for this requirement?



            2. What negative impacts, if any, will your firm experience as a result of the consolidation of these construction projects?



            3. If the consolidation were limited to performance within the Huntington District boundaries (see Huntington District boundary map – Attachment 1), will that impact your ability to participate in this type of requirement for other Districts (specifically within the Great Lakes and Ohio River Division)?



            4. If the Huntington District established multiple regionally based contracts (divided the performance area within the Huntington District boundaries into 2 to 4 smaller geographic regions), would that change your ability to participate compared to performance under a MATOC within the entire Huntington District boundary?



            5. If the area were expanded to require performance anywhere within the Huntington, Louisville, Nashville, and Pittsburgh Districts’ boundaries (See Regional Dredge Map – Attachment 2), how would that impact your decision to propose and/or your ability to perform on the MATOC?



            6. Provide bonding capability (construction bonding level per single contract and aggregate construction bonding level, both expressed in dollars), along with current bonding capacity.



            7. Contractors are asked to indicate what Districts they are interested in supporting and if there are any cost ranges in which task orders would be considered too small or too large to support.



            8. All responders are encouraged to provide any additional positive/negative feedback to the procurement.



Contractors are hereby strongly encouraged to make known their interest and experience in this type of work. The submission is limited to 30 pages (one sided). Please note that past performance information does not count toward 30 page limit. Electronic submission via email is required. Please email your qualification statement to Amy Davis, Amy.L.Davis@usace.army.mil by close of business on May 08, 2026.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 236220
New
Federal
Tom Jenkins Office/Shelter roof replacement
Solicitation # W9123726QA090
Solicitation W9123726QA090 is a total small business set-aside for the removal and replacement of roofing systems at the Tom Jenkins Dam in Glouster, Ohio. The scope of work requires the installation of a new fully adhered white EPDM membrane roof for the office and a new architectural asphalt shingle roof with synthetic underlayment for the shelter. All work must be completed within 60 calendar days from the Notice to Proceed, with a performance period scheduled from September 21, 2026, to November 21, 2026. The project requires a minimum 20-year warranty on both roofs and strict adherence to EM 385-1-1 safety standards and Davis-Bacon wage determinations for Muskingum County. The contract is a firm-fixed-price arrangement with an estimated value between 100,000 and 250,000 dollars. Award will be granted to the lowest price offeror who meets all technical requirements and is deemed responsible. Key administrative updates via Amendment 0004 have removed the requirement for performance and payment bonds and modified applicable FAR clauses. All proposals must be submitted electronically through the PIEE Solicitation Module by September 15, 2026. The contractor is responsible for providing a site-specific Abbreviated Accident Prevention Plan and maintaining a quality control system to ensure all materials are new and installations are leak-free.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 332312
New
Federal
Miter Gate Rack Arm Fabrication for Captain Anthony Meldahl Lock and Dam
Solicitation # W9123726QA084
Solicitation W91237-26-Q-A084 is a request for a firm-fixed price supply contract issued by the U.S. Army Corps of Engineers, Huntington District, for the fabrication and delivery of one rack arm assembly for the Captain Anthony Meldahl Lock and Dam in Felicity, Ohio. The scope of work includes the fabrication of one rack, one rack support, and all associated appurtenances according to contract drawing 22/5. This is a supply-only procurement, meaning the contractor is responsible for fabrication, assembly, and testing, while the government will handle the final installation. The award will be based on the lowest price among offers that meet all technical requirements, and the project is designated as a total small business set-aside under NAICS code 332312. Key requirements include the submission of detailed shop drawings for approval and the implementation of a quality control system. Final shop assemblies must be witnessed by a government inspector, and the contractor must provide 14 days' notice prior to final testing. The delivery is required within 180 calendar days from the date of award, with terms set as FOB Destination. Packaging must adhere to strict standards for long-term storage, including the use of rust preventatives, weathertight wooden crates, and marking in accordance with MIL-STD-130 and MIL-STD-129. All responses must be submitted electronically via the PIEE Solicitation Module in a searchable PDF format.
Fabricated Structural Metal Manufacturing

POSTED

3 days ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Federal
Bolivar Dam Gatehouse Roof Replacement
Solicitation # W9123726QA073
Solicitation W9123726QA073 is a sealed bid invitation for a total small business set-aside construction project to replace the roof membrane of the Intake Structure Building at Bolivar Dam in Bolivar, Ohio. The contractor is responsible for providing all personnel, equipment, transportation, and materials required to remove and dispose of the existing membrane, gravel, and reglet flashing, and install a new 3,060 square foot roofing system. Specifications require the use of Johns Manville 060 PVC single-ply white membrane or an equivalent, along with two layers of 2.6 inch polyisocyanurate insulation board. The project must be completed within 60 calendar days from the issuance of the Notice to Proceed, which is contingent upon the approval of bonding, insurance, security clearances, and an Accident Prevention Plan. The contract is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates and federal mandates for paid sick leave and minimum hourly wages. Safety compliance is mandatory according to OSHA 29 CFR 1910 and 1926, as well as the U.S. Army Corps of Engineers EM 385-1-1 manual. Administrative requirements include active registration in the System for Award Management and compliance with Buy American and cybersecurity standards, including CMMC level requirements. Proposals must be submitted through the PIEE Electronic Quote Submissions portal by the deadline of September 14, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS