Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought for Regional Dredge IDIQ MATOC

Closed
W9123726X1BM8Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 14 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 20 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This sources sought notice is a market research initiative by the U.S. Army Corps of Engineers, Huntington District, aimed at identifying qualified small business contractors for a potential Multiple Award Task Order Contract (MATOC) focused on mechanical dredging, clearing, and snagging operations across the Nashville, Louisville, Huntington, and Pittsburgh districts within the Great Lakes and Ohio River Division. The Government intends to award up to three indefinite-delivery, indefinite-quantity (IDIQ) contracts with a one-year base period and four one-year option periods, totaling a not-to-exceed ceiling of $80 million shared among all awardees. Work will be executed through negotiated firm-fixed-price task orders, with production rates set between 0 and 350 tons per hour and grade accuracy tolerances defined by the Government. Contractors must be able to mobilize equipment and crews within 24 hours for emergency response and demonstrate experience with independent, simultaneous, and land-based dredging operations, including construction of in-water sediment control dikes and upland disposal work. To qualify as small under NAICS code 237990, firms must perform at least 40% of the dredging volume using their own or another small business’s equipment, and all respondents must self-certify their status as Small Business, Small Disadvantaged Business, HUBZone, Woman-Owned, or Service-Disabled Veteran-Owned. A critical requirement is compliance with the U.S. Army Corps of Engineers’ Dredging Quality Management (DQM) system, with offerors required to describe prior experience with DQM, current capability to implement it, and whether it would affect their ability or willingness to respond to future solicitations. In addition to technical qualifications, proposers must provide detailed past performance data (not counted toward the 30-page limit), comprehensive equipment inventories including make, model, age, and condition, organizational structure, safety and quality control protocols, and bonding capacity documentation. Responses must be submitted electronically by May 8, 2026, to Amy Davis, and must include the firm’s DUNS number and geographic interest in supporting the four specified districts. The Government is seeking feedback on potential impacts of consolidating these requirements into a single MATOC, including concerns about regional restrictions, the feasibility of performance across multiple districts, and whether subdividing the Huntington District into smaller geographic regions would improve participation. No solicitation, specifications, or drawings are available, and no award will result from this notice—it is strictly for market research to inform future procurement

General Info

U.S. Army Corps seeks small businesses for potential dredging MATOC up to $80M across four districts with 24-hour mobilization and DQM compliance.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Huntington, WV, USA

Set-Aside

NONE

Documents

3

Sources Sought for Regional Dredge IDIQ MATOC W9123726XXxxx

DOCX, High priority: read this firstsources-sought
High

Regional Mechanical Dredge Map - Ohio River Districts

PDF, Low priorityother
Low

Huntington+District+Boundary+Map+-+Attachment+1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts2 people available
OfficeHUNTINGTON, WV, 25701-5000, USA
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more

This is a SOURCES SOUGHT NOTICE FOR MARKET RESEARCH ONLY – This notice does not constitute a solicitation announcement or restrict the Government to an ultimate acquisition approach, and NO AWARD will occur from this notice. NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS are available for this notice. Responses to this Sources Sought notice will be used by the Government to make appropriate acquisition decisions.



The purpose of this notice is to gain knowledge of potentially qualified small business sources to include small businesses in the following categories: Small Business, Small Disadvantaged Business, Certified HUBZone, Woman-Owned, and Service-Disabled Veteran-Owned relative to NAICS code 237990, which has a Small Business size standard of $30 million or less. To be considered small for purposes of Government procurement, a firm must perform at least 40% of the volume dredge with its own equipment or equipment owned by another small business dredging concern. Responses will be used to determine appropriate acquisition decisions. A target of three (3) indefinite delivery contracts (IDC) will be negotiated and awarded with one (1) year base period and four (4) one (1) year option periods. The not-to-exceed amount for this IDC will be $80,000,000.00 and will be shared amongst MATOC contractors. Work will be issued by negotiated firm-fixed price task orders. This will be a regional contract, and task orders may be issued for mechanical dredging/clearing and snagging work in any of the following LRD Districts: Nashville (LRN), Louisville (LRL), Huntington (LRH), and Pittsburgh (LRP). This includes any navigable waters and navigable tributaries of the Ohio River, above it’s confluence with the Mississippi River. However, responses to the questions below could affect this overall decision. Work performed will approximately rank between 0 cubic yards and 400,000 cubic yards, with a production rate for each respective task order ranging between 0 tons per hour to 350 tons per hour. This rate will be determined by the Government and is a mandatory performance metric for each task order. The selected contractor(s) must have the ability to deploy equipment large enough to meet required production rates, as well as grade accuracy tolerances, satisfactory to the Government. The following dredge scenarios may be used in individual task orders.



Independent Dredge/Disposal: Dredging and disposal activities are performed by the same piece(s) of equipment at different times. This may involve more than one crane (derrick, excavator, etc) but dredge and disposal activities do not occur simultaneously. This also includes projects in which all dredged material is loaded at one location, then transported to another area for disposal via another piece of equipment.



Simultaneous Dredge/Disposal: A project in which two or more separate cranes (derricks, excavators, etc) are dedicated separately to the material loading and unloading actions for a single task order. Loading and unloading activities shall take place simultaneously with a continuous transfer of material from dredge area to disposal site.



Land Based: Dredging is performed from the bank by land-based equipment.



Responses to this Sources Sought announcement must include the contractor’s type of business such as Small Business, 8(a), HUBZone, etc, and their DUNS number. Responses shall include a qualifications statement along with documentation to support Technical Capabilities and Specialized Experience including:


      a. Experience in Mechanical Dredging/Clearing and Snagging work (company information and employees’ experience)


            b. Efficient mobilization (within 24 hours) of experienced dredging crews (including equipment) not limited to, barge mounted crane(s) material barge(s), tow boats, etc. for use in occasional emergency dredge situations.


            c. Ability to provide land-based services for upland disposal work, water and/or land based services for the construction of in-water disposal containment and sediment control dikes.


            d. The U.S. Army Corps of Engineers has recently implemented updated Dredging Quality Management (DQM) requirements for dredging operations. Please provide responses to the following:


  • Have you previously implemented or operated under DQM requirements on prior dredging contracts? If so, briefly describe your experience.
  • Are you currently capable of obtaining and integrating the required DQM systems, instrumentation, and support services for your mechanical dredging fleet? Please describe any existing capabilities or anticipated challenges.
  • Would the inclusion of DQM requirements affect your company’s ability or decision to submit an offer or express interest in a future IDIQ MATOC contract for mechanical dredging? If yes, please explain how (e.g., cost, schedule, technical barriers).
  • Respondents are encouraged to provide any additional comments or recommendations regarding the DQM requirements and their potential impact on industry participation.


Additionally, contractors are requested to provide the following Past Performance information; a list of relevant projects, current and/or completed, in the past five (5) years that best demonstrates competence with this type of work, include dates, locations, types of contracts, dollar amounts/values, description of the work and references. The following Management and Administration information shall also be included: Personnel and Organization Quality Control, Safety, and Location of the Firm. The responding firm must also provide a list of equipment and its availability. Describe each piece of equipment to include, at a minimum, the number of pieces of each type of equipment and name, manufacture, model, age, and condition of each piece of equipment. The firm must be able to mobilize equipment to respond to an emergency situation within 24 hours’ notice.



Also, contractors are requested to respond to the following questions:


            1. Will consolidating these dredging requirements into a Multiple Award Task Order Contract (MATOC) for a base period of one year and four one year option periods impact your ability to compete for this requirement?



            2. What negative impacts, if any, will your firm experience as a result of the consolidation of these construction projects?



            3. If the consolidation were limited to performance within the Huntington District boundaries (see Huntington District boundary map – Attachment 1), will that impact your ability to participate in this type of requirement for other Districts (specifically within the Great Lakes and Ohio River Division)?



            4. If the Huntington District established multiple regionally based contracts (divided the performance area within the Huntington District boundaries into 2 to 4 smaller geographic regions), would that change your ability to participate compared to performance under a MATOC within the entire Huntington District boundary?



            5. If the area were expanded to require performance anywhere within the Huntington, Louisville, Nashville, and Pittsburgh Districts’ boundaries (See Regional Dredge Map – Attachment 2), how would that impact your decision to propose and/or your ability to perform on the MATOC?



            6. Provide bonding capability (construction bonding level per single contract and aggregate construction bonding level, both expressed in dollars), along with current bonding capacity.



            7. Contractors are asked to indicate what Districts they are interested in supporting and if there are any cost ranges in which task orders would be considered too small or too large to support.



            8. All responders are encouraged to provide any additional positive/negative feedback to the procurement.



Contractors are hereby strongly encouraged to make known their interest and experience in this type of work. The submission is limited to 30 pages (one sided). Please note that past performance information does not count toward 30 page limit. Electronic submission via email is required. Please email your qualification statement to Amy Davis, contact@example.gov by close of business on May 08, 2026.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 332312
New
Federal
Steel and Other Metal Materials for the Marietta Repair Station: Stamford De-Watering Box Material PH 1
Solicitation # W9123727QA011
Solicitation W9123727QA011 is a firm-fixed price commercial supply contract issued by the US Army Corps of Engineers, Huntington District, for the procurement of various steel and metal materials to support the Stamford De-Watering Box project at the Marietta Repair Station in Ohio. This procurement is a 100 percent small business set-aside under NAICS code 332312. The required materials include a wide array of ASTM standard products, specifically ASTM 1018 CR round bars, ASTM A434 CL bc, ASTM A53 seamless pipe, ASTM 1026 seamless tubing, ASTM A36 plates and bars, ASTM A709 Gr 50 plates, T-beams, and flat bars, as well as ASTM A325 fasteners. Specialized fabrication is required for certain ASTM 709 Gr 50 plates, including 1/8 inch tolerances and 45-degree double bevels as specified in the technical drawings. The selected vendor is responsible for arranging shipping to the Marietta Repair Station, with the government handling the unloading of materials upon arrival. All deliveries must be completed within eight weeks of the award date and must be accompanied by traceable mill certifications and testing reports. To be eligible for award, firms must be registered in the System for Award Management and comply with DFARS clauses 252.225-7001 and 252.225-7002 regarding the Buy American and Balance of Payments Program and Qualifying Country Sources as Subcontractors. The contract will be awarded using simplified acquisition procedures, and final invoicing is to be submitted via email once all materials are delivered onsite.
Fabricated Structural Metal Manufacturing

POSTED

1 day ago

DEADLINE

in about 7 hours
View Details
NAICS: 237990
New
Federal
Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020
Solicitation # W9123726RA020
Solicitation W9123726RA020 is a new acquisition by the Department of the Army, Huntington District, for the rehabilitation of the intake structure and dam at Fishtrap Lake in Shelbiana, Kentucky. The scope of work includes providing all labor, materials, and supervision for electrical and mechanical replacements, specifically the manufacturing of one new service gate cylinder and the rehabilitation of two service gate cylinders and one low flow gate cylinder. The contract includes four optional components: cylinder rehabilitation, crane rehabilitation, elevator power and control system replacement, and full replacement of all three service gate cylinders. The base contract must be completed within 270 calendar days of the Notice to Proceed, with various options extending the period of performance up to 450 days. Proposals are evaluated based on past performance, a small business participation plan, and cost/price reasonableness. Submissions must be delivered in searchable PDF format via the PIEE Solicitation Module. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates for Pike County, Kentucky, and must adhere to USACE EM 385-1-1 safety standards, including the submission of an Accident Prevention Plan and a critical lift plan. Performance and payment bonds are required for bids exceeding 150,000 dollars. Hazardous materials handling must comply with DOT and EPA standards, and all elevator work requires certification by a third-party Qualified Elevator Inspector.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 9 days
View Details
NAICS: 332312
Federal
Steel and other Materials for the Marietta Repair Station: Stamford Barrier Gate Material PH 2
Solicitation # W9123727QA010
Solicitation W9123727QA010 is a firm-fixed price commercial supply contract issued by the US Army Corps of Engineers, Huntington District, for the procurement of steel and other materials to support the Stamford De-Watering Box at the Marietta Repair Station. This procurement is a 100 percent small business set-aside under NAICS code 332312. The scope of work involves the supply and delivery of a variety of materials adhering to specific ASTM standards, including 4140 HR ANN round bars, C95500 and C95400 bronze, 6061-T6 aluminum, 1026 seamless tubing, 1018 CR, A668 CL G, A240 Duplex 2205, A36 steel, and A1 rail. All materials must be delivered to the Marietta Repair Station in Ohio with accompanying traceable mill certifications and testing reports. The contract will be awarded using simplified acquisition procedures, with a response deadline of October 28, 2026. To be eligible, firms must be registered in the System for Award Management and comply with the Buy American and Balance of Payments Program and Qualifying Country Sources as Subcontractors regulations. The vendor is responsible for arranging shipping to the delivery site, while the government will handle the unloading of materials. Final invoicing is to be submitted via email to the designated point of contact after all materials have been delivered onsite.
Fabricated Structural Metal Manufacturing

POSTED

7 days ago

DEADLINE

in about 7 hours
View Details
NAICS: 237990
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation Project, managed by the U.S. Army Corps of Engineers Huntington District, is a comprehensive infrastructure modernization effort designed to extend the facility's operational life by 50 years. The scope of work includes the full replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation of 1930s-era electro-mechanical drive systems. Critical structural repairs involve replacing the post-tensioned Tainter Gate anchorage system due to stress corrosion cracking and proactively replacing the Main Lock Miter Gate anchorages. Additionally, the project encompasses the replacement of the Dam Service Bridge, modernization of electrical service distribution and SCADA systems, and the replacement of worn components within the Main Lock Emergency Gate Machinery. To facilitate this effort, an Industry Day event is scheduled for November 02, 2026, featuring a presentation at the Winfield Community Center and a site walkthrough at the Winfield Locks and Dam. Interested prime contractors and subcontractors must register by November 01, 2026, at 12:00 PM Noon. The event includes opportunities for in-person one-on-one meetings for prime contractors on the day of the event, with virtual sessions available for all partners starting November 03, 2026. Technical requirements for the project include strict adherence to ASTM A578 for ultrasonic inspections of plates and AWS D1.5 for reinforcing fillet welds, with specific performance testing required for bar anchor installations.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS