Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 6, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought for Testing and Maintenance Services for Emergency Generators and Automatic Transfer Switches

Closed
PANAPG-17-P-0000097688Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting lump sum fee-for-service bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The contractor is responsible for providing all transportation, labor, supervision, tools, and new manufacturer-specified parts required to diagnose and repair the clutch assembly and power take-off system. The scope of work includes disassembling tractor components, replacing friction discs, bearings, oil seals, O-rings, and hydraulic pipes, resurfacing the flywheel, and performing necessary fluid and filter changes. Final acceptance is contingent upon the Facility Maintenance Department verifying proper clutch engagement and disengagement, as well as confirming the PTO system operates correctly under load. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone concerns, under NAICS code 811310. Interested offerors must submit a bid sheet, proof of insurance, and a completed supplier packet including a W-9 and self-certification form to Angie Mahoney by November 3, 2026, at 3:00 PM CST. Award will be based on best value. The contract incorporates various federal regulations, including Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31, and requires strict adherence to security, confidentiality, and non-disclosure protocols regarding government facilities and information.
Earle C. Clements Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 1 day
NAICS: 811310
New
SLED
Asphalt Storage Tank Maintenance and Repair
Solicitation # 601320000072188
The Texas Department of Transportation (TxDOT) issued Invitation for Bid 601320000072188 in October 2026 for the maintenance and repair of two Duraco Model 8250 asphalt storage tanks located at the Gonzales Maintenance Facility in District 13. The scope of work includes cleaning, the installation of new manway gaskets, the replacement of disturbed seals or components according to manufacturer recommendations, and the off-site transport and disposal of waste in compliance with Texas Health and Safety Code Chapter 361. Final payment is contingent upon a successful final inspection conducted by a TxDOT representative. Responses are due by November 6, 2026, at 3:00 p.m. Central Time and must be submitted via the Bonfire procurement portal. Bidders are required to provide a comprehensive submission including a price schedule in Excel format, qualifications and references, personnel resumes, and a mandatory child support obligation certification. Award decisions will be based on best value, with primary consideration given to purchase price and compliance with specifications. To be eligible, vendors must pass an initial screening of required documentation and maintain a vendor performance rating of A, B, or C in the CPA Vendor Performance Tracking System. Contractors must adhere to strict insurance requirements, including Commercial General Liability and Commercial Automobile Liability of 600,000 dollars per occurrence, and statutory Workers Compensation. The contract incorporates various state and federal mandates, including Title VI assurances, ADA considerations, and the Buy Texas affirmation. Invoicing must be submitted electronically to TxDOT and include a 15-digit contract number and a valid Texas Identification Number or EIN.
Texas Department of Transportation

POSTED

2 days ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
Conveyance Maintenance Services
Solicitation # 26-1336
Chicago Public Schools is soliciting bids for Conveyance Maintenance Services under solicitation number 26-1336 to implement a comprehensive preventive maintenance program for conveyance equipment. The selected bidder will provide all labor, materials, and supervision necessary to ensure equipment remains safe and operational, adhering to the City of Chicago Municipal Code, ASME A17.1/CSA B44, ASME A17.3, and original equipment manufacturer standards. The contract includes a three-year initial term with the possibility of two automatic renewals of two years each. Services involve monthly preventive maintenance during normal working hours from 6:00 a.m. to 2:30 p.m., as well as 24/7 emergency callback support. Key deliverables include site-specific maintenance schedules, the use of CPS facilities software for reporting, and an annual Executive Summary Report based on a 7-point assessment rubric. The agreement will be awarded to the lowest, responsive, and responsible bidder based on evaluation factors including price, business stability, professional qualifications, past performance, and capacity. Bidders must submit a comprehensive package via Bonfire, including an Excel-based bid tabulation, audited financial statements for the last three fiscal years, three non-Board references, and a W-9 tax form. Compliance with MBE/WBE aspirational goals of 30% and 7% respectively is required, along with adherence to the Illinois Minimum Wage Law and various federal and state non-discrimination acts. Invoicing must be submitted electronically in PDF format, with payments processed according to the Local Government Prompt Payment Act. All shipments are designated as F.O.B. destination. The deadline for questions is November 6, 2026, and the final response deadline is November 20, 2026.
Chicago Public Schools

POSTED

2 days ago

DEADLINE

in 19 days

General Info

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

2800 Powder Mill Road, ADELPHI, MD, 20783, USA

Set-Aside

NONE

Documents

5
DOCX
DOC
DOCX
DOC
DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg Adelphi
Contacts1 person available
OfficeADELPHI, MD, 20783-1197, USA
Office AddressADELPHI, MD, 20783-1197, USA
Contacts
Jamie N WhiteContract Specialist

Full Description

Show more
Testing and Maintenance Services for Six (6) Emergency Generators and Automatic Transfer Switches in accordance with the following draft requirements: DRAFT REQUIREMENTS: 2.1 Preventive Maintenance/Inspection and Testing/Incidental Repairs: The Contractor shall perform all preventive maintenance/inspection and testing/incidental repairs of the systems and equipment listed at Technical Exhibits 1 and 2 (Attachments), which identify the types of equipment and their locations at ALC. The routine maintenance and operational testing program shall be based on the manufacturer's recommendations and the latest edition of the National Fire Protection Association (NFPA) 110 "Standard for Emergency and Standby Power Systems", 111 "Standard on Stored Electrical Energy Emergency and Standby Power Systems", 70B "Recommended Practice for Electrical Equipment Maintenance", 70E "Standard for Electrical Safety Requirements for Employee Workplaces", Unified Facilities Criteria(UFC), National Electric Code(NEC), International Building Code(IBC), and all other Federal, State, and Local laws and regulations. 2.1.1 The date and time of day for required testing shall be decided by the government, based on facility operations. 2.1.2 Emergency power supply system (EPSS) components shall be maintained and tested by qualified person(s). 2.1.3 Equivalent loads used for testing shall be automatically replaced with the emergency loads in case of failure of the primary source. 2.1.4 A written schedule for routine maintenance and operational testing of the EPSS shall be established. A permanent record of the EPSS tests, exercising, operation, and repairs shall be maintained and readily available. 2.1.5 The permanent record shall include the following: 2.1.5.1 The date of the maintenance report. 2.1.5.2 Identification of the servicing personnel. 2.1.5.3 Notation of any unsatisfactory condition and the corrective action taken, including parts replaced. 2.1.5.4 Testing of any repair for the time as recommended by the manufacturer. 2.1.6 The operational test shall be initiated at an ATS (Automatic Transfer Switch) and shall include testing of each EPSS component on which maintenance or repair has been performed, including the transfer of each automatic transfer switch to the alternate power source, for a period of not less than 30 minutes under operating temperature. 2.1.7 Diesel generator sets, all generators except the one located in building 601, shall be exercised monthly with the available EPSS load and shall be exercised annually with supplemental loads at not less than 50 percent of the generator nameplate kilowatt (kW) rating for 30 continuous minutes and at not less than 75 percent of the EPS (Emergency Power Supply) nameplate kW rating for 1 continuous hour for a total test duration of not less than 1.5 continuous hours. 2.1.8 Spark-ignited generator set, like the one located in building 601, shall be exercised at least once a month with the available EPSS load for 30 minutes or until the water temperature and the oil pressure have stabilized. 2.1.9 The generator test shall be initiated by simulating a power outage using the test switch on the ATS or by opening a normal breaker. 2.1.10 Load tests of generator sets shall include complete cold starts. 2.1.11 Time delays shall be set as follows: 2.1.11.1 Time delay on start 1 second minimum and 0.5 second minimum for gas turbine units. 2.1.11.2 No minimum is required for time delay on transfer to emergency. 2.1.11.3 Time delay on restoration to normal shall be set to 5 minutes minimum. 2.1.11.4 Time delay on shutdown shall be set to 5 minutes minimum. 2.1.12 Transfer switches shall be operated monthly. The monthly test of a transfer switch shall consist of electrically operating the transfer switch from the primary position to the alternate position and then a return to the primary position. 2.1.13 Transfer switches shall be subjected to a maintenance and testing program that includes all of the following operations: 2.1.13.1 Checking of connections 2.1.13.2 Inspection or testing for evidence of overheating and excessive contact corrosion. 2.1.13.3 Removal of dust and dirt 2.1.14 EPSS circuit breakers including main and feed breakers between the generator and the transfer switch load terminals, shall be exercised annually with the generator in the "off" position. Circuit breakers should be tested under simulated overload conditions every 2 years. 2.1.15 Maintenance of lead-acid batteries is performed in-house and not part of this performance work statement. 2.1.16 A fuel quality test shall be performed at least annually using ASTM D 975 Standard Specification for Diesel Fuel Oils. Inferior fuel shall be removed and disposed off site. 3 Procedures 3.1 Operation and Testing Procedures: The Contractor shall follow the manufacturer's written procedures and the following as a minimum: 3.1 Perform maintenance per Maintenance Schedule 3.2 Record running time meter (RTM) reading at start and end of test. 3.3 Simulate normal power failure from a "cold start" by use of the test switch in automatic transfer switch or by opening normal power supply to EPSS. 3.4 Observe and record time delay (T/D) on start. 3.5 Record cranking time (terminates when engine starts). 3.6.Transfer load to generator. 3.7 Record alternating current (AC) voltage, frequency, amperage, kW. 3.8.Record initial oil pressure and battery-charging rate. 3.9 Record oil pressure, battery-charging rate, and water or air temperature after 15 minutes running time. 3.10 Return test switch to normal or reestablish normal power supply at such time to cause a minimum running time of 30 minutes under load. 3.11 Record prime mover and ac instruments just prior to transfer. 3.12 Record time delay on retransfer. 3.13 Record time delay on shutdown for units so equipped. 3.14 Place unit in automatic operation mode. 6 Deliverables: 6.1 Schedule of Work: The Contractor shall provide a schedule of work that incorporates all maintenance tasks and their corresponding frequencies. A draft copy of this schedule shall be provided to the Contracting Officer's Representative (COR) two (2) weeks after contract award. The COR will return the schedule, with input/comments, to the Contractor within seven (7) days of receipt of the submission. The Contractor shall submit the final schedule, for approval, within seven (7) days of receipt of the schedule with COR comments. The schedule of work shall be approved before work begins. This deliverable applies to the base year of the contract, and each individual option year exercised. 6.2 Accident Prevention Plan: The Contractor shall develop an accident prevention plan in accordance with EM 385-1-1, Appendix A, and provide a draft copy to the COR two (2) weeks after contract award. The accident prevention plan will be reviewed for completeness and compliance with OSHA and EM 385-1-1. The COR will return the accident prevention plan, with input/comments, to the Contractor within seven (7) days of receipt of the submission. The Contractor shall submit the final accident prevention plan, for approval, within seven (7) days of receipt of the plan with COR comments. The accident prevention plan shall be approved before work begins. 6.3 Quality Control Plan: The Contractor shall prepare and deliver a quality control plan, respective of the Quality Control Program (see section C.1.4 of the PWS), to include a schedule, to the COR for review within two (2) weeks after contract award. The COR will return the quality control plan, with input/comments, to the Contractor within seven (7) days of receipt of the submission. The Contractor shall submit the final quality control plan, for approval, within seven (7) days of receipt of the plan with COR comments. The Contractor shall submit the final quality control plan, for approval, within seven (7) days of receipt of the plan with COR comments. The quality control plan shall be approved before work begins. 6.4 Test Report: The Contractor shall document all results and findings of the preventative maintenance in accordance with the requirements of NFPA 70B, 2016 edition. The Contractor shall provide these results in a test report three (3) weeks after the scheduled maintenance is completed and prior to contract expiration. Contractor formatting is acceptable if in accordance with standard industry practices and if all criteria of NFPA 70B are met. 8 ATTACHMENTS: - Technical Exhibit 1 - Technical Exhibit 2 - Technical Exhibit 3

More opportunities from Department Of Defense → W6QK Acc-Apg Adelphi

Same awarding agency

NAICS: 334511
Federal
RF Sensor Network Design & IntegrationThe contract involves the design and integration of a multi-domain RF sensor network specifically engineered to detect and characterize frequency-agile unmanned aerial systems. This effort requires advanced signal processing capabilities to identify, track, and classify UAS threats in complex electromagnetic environments, with an emphasis on real-time situational awareness and adaptive response. The solution must be scalable, ruggedized for field operations, and capable of seamless operation across multiple domains including ground, air, and potentially space-based platforms. Deployment planning is a critical component, ensuring the network can be rapidly installed and configured in diverse operational terrains with minimal logistical footprint. The system must interoperate with existing military command, control, communications, and intelligence systems to feed actionable data into broader defense architectures. Performance requirements include high sensitivity to low-power signals, resistance to jamming and spoofing, and the ability to function autonomously in contested or denied environments. The work is to be performed in West Fork, Arkansas, under a subcontract arrangement with the Department of Defense, leveraging NAICS code 334511 for electronic component and product manufacturing.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

3 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS