This Sources Sought opportunity from Department Of Defense was posted on November 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought - Renovate Sijan Hall Dormitory - Phase 1, USAFA CO

Closed
W9128F23SC0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 11 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 11 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 11 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

USAF Academy, CO, 80840, USA

Set-Aside

NONE

Documents

2

Sources Sought Notice Renovate Sijan Hall Phase 1 USAFA CO FY25

PDF, High priority: read this firstsources-sought
High

DRAFT_SPECS_Rpr-Sijan-Hall_Ph1%28aa66%29+%282%29.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Jessica Beckman
Monica A. McKensey

Full Description

Show more
SOURCES SOUGHT 06 November 2024 - Specs are now attached. Due to large size of drawings, please email: jessica.l.merrill2@usace.army.mil for a drop off to be sent via email. Email requests will be accepted until 17 November 2024 only. RENOVATE SIJAN HALL, PHASE 1 W9128F25SC004 PURPOSE: By way of this Sources Sought Notice, the USACE-Omaha District intends to determine the extent of capable small business or other than small business firms that are engaged in providing the requirement described hereunder. The responses to this notice will be used for planning purposes for developing the general conditions and acquisition method for an upcoming contract requirement to renovate Sijan Hall (Building 2348), a cadet dormitory building at the United States Air Force Academy (USAFA) located in Colorado Springs, Colorado. Therefore, this notice does not constitute a Request for Proposal (RFP), Quotation or Bid; it does not guarantee the future issue of an RFQ/RFP/IFB; nor does it commit the Government to contract for any supply, service, or construction. There is no solicitation currently available. THIS IS NOT A PRESOLICITATION OR SOLICITATION ANNOUNCEMENT. After review of the responses to this notice, and if the Government intends to proceed with the acquisition, a separate pre-solicitation announcement will be published on the System for Award Management (SAM) website (sam.gov). Responses to this SOURCES SOUGHT NOTICE are not adequate responses to any future solicitation announcement. All interested parties and potential offerors are responsible for monitoring SAM for any future postings. The purpose of this notice is to gain knowledge of, and determine the availability of, potentially qualified small and large business sources and their size classifications relative to the North American Industry Classification System (NAICS) Code of 236220, - Commercial and Institutional Building Construction, to assist the Government in determining the most appropriate acquisition method for this contract requirement, including whether a small business set-aside is possible and/or appropriate. In addition, the purpose of this notice is to request information from interested Contractors to assist the Government in planning for and developing the general conditions for this pending contract requirement. Specific response requirements and questions are outlined below within this notice. Please note that this research is for planning and information purposes only and does not constitute a solicitation for competitive bids/proposals and is not to be construed as a commitment by the U.S. Army Corps of Engineers. However, all interested parties are invited to respond, via email, to this Sources Sought Notice. ANTICIPATED CONTRACT DESCRIPTION AND SCOPE - RENOVATE SIJAN HALL, PHASE 1: The project will be located at the United States Air Force Academy in Colorado Springs Colorado. The project will include various types of horizontal and vertical scope, including architectural, interior design, mechanical, electrical, exterior envelope, structure, fire protection, and site improvements. Sijan Hall (Building 2348) is the second of the two cadet dormitory buildings at the United States Air Force Academy, located in Colorado Springs, Colorado, and construction was completed in 1968. The primary function of Sijan Hall is a dormitory for Cadets and was designed to house 2,520 students in 1968; currently there are 1,926 Cadets that occupy Sijan. Several other ancillary functions are also housed in Sijan Hall. This six-story building is located on the south side of the Cadet Area. The facility with approximately 625,300 square feet is listed as a part of the Air Force Academy's National Historic District. The renovation of Sijan Hall will be broken up into five (5) stand-alone phases, with each phase to be constructed independently, to accommodate the relocation of displaced cadets and thus allow the remainder of the building to be open and operational as each phase is being renovated. No disruptions to functions will be permitted to the phases and portions of the building that are not being renovated. The focus of this Sources Sought / Request for Information is limited to Phase 1 which includes the renovation of approximately 135,000 SF of the building representing Phase 1. Phase 1 will be solicited as a 100% design and will include, but not be limited to: interior renovations, exterior curtain wall replacement, mechanical, electrical, plumbing, fire protection, life safety, energy management, any associated exterior and utility work, and communication systems. Other portions of the building will be occupied during performance of work under Phase 1. It is anticipated that the solicitation for the Phase 1 renovation will be issued in June 2023 for a FY 2023 award. Sijan Hall currently does not meet the latest USAFA Design Standards, so the design to be constructed under Phase 1 will ensure that items replaced or upgraded comply with the current USAFA Design Standards. Most of the existing building systems have exceeded their useful life and will be removed and replaced as part of this project. Repairs to the facility are required to address repetitive system maintenance, prevent further deterioration of the building's systems, components, and infrastructure, and facilitate future maintenance of all new building systems and infrastructure. The building's exterior envelope and systems will need to be modernized to meet the requirements of Unified Facilities Criteria (UFC) 1-200-02, High Performance and Sustainable Building Requirements. Phase 1 renovation will address interior renovations, new architectural finishes and interior upgrades, interior work brought down to the structure and rebuilt per USAFA standards, the removal and abatement of asbestos containing materials and lead based paint. Phase 1 will also include removal and replacement of all exterior curtain wall systems within the boundary of Phase 1, and will provide all mechanical, electrical, plumbing, and fire protection work back to the mechanical room(s) that serve the areas within Phase 1. Phase 1 will also involve installing building systems to include mechanical, plumbing, low voltage, electrical and communication systems; for example, isolation valves and bypass capability on the High Temperature Hot Water (HTHW) system so each mechanical and plumbing zone will be independently isolated. In addition, Phase 1 will include the replacement of three (3) substations. A ground source heat pump system will be used for all phases of the Sijan Hall renovation, with Phase 1 providing the entire well field, including 160 6 wells drilled to approx. 400+. This well field will be located south of Sijan Hall and placed in the sloped hillside north of the cadet parking lot. The roof of Sijan Hall has been completely replaced and therefore is excluded from the scope of work; however, isolated repairs may be required for roof penetrations associated with Phase 1 work. The overall intent of this project is to bring the facility up to code. Where non-code compliant building construction, components, and features are identified by the life safety and building code analysis, they will be corrected as part of the project construction. As part of the life safety and building code analysis, the construction type of the facility shall be identified. The current construction type will comply with the International Building Code (IBC) 2018 and applicable UFC, NFPA and ADA. Sijan Hall will be used primarily as a dormitory and will be classified as a residential Group R-2. The building will also consist of small accessory assembly and office spaces (i.e., individual offices and barber shop). These assembly and office spaces will be individually classified per sections 302.1 and 508.2 of the IBC. All current codes, UFC's and USAFA Standards will be incorporated into the final product. The existing facility does not comply with UFC 3-600-01, Fire Protection Engineering for Facilities, but shall be brought to compliance with this UFC as part of this project. This UFC requires complete sprinkler protection regardless of floor area or construction type. Also, temporary fire rated barriers will be necessary to protect occupied spaces from construction areas. NOTE: The design for the renovation of Sijan Hall, Phase 1, is currently at 100%. To assist interested firms in better understanding the potential scope of this project and to better respond to this Sources Sought / Request for Information, the 100% draft design package is posted along with this notice for INFORMATION PURPOSES ONLY. Please note that this design package is in draft (not for construction) form and is subject to and will likely change prior to and with the issuance of any official solicitation announcement. In accordance with DFARS 236.204, the magnitude of this project is expected to range between $100M and $250M for construction efforts to Renovate Sijan Hall, Phase 1. ESTIMATED PROJECT SOLICITATION ISSUE DATE: June 2025 Project Period of Performance: 600 calendar days from construction NTP. SUBMISSION REQUIREMENTS FOR THIS SOURCES SOUGHT NOTICE: All interested, capable, qualified, and responsive Contractors under NAICS code 236220 are encouraged to reply to this request. Interested PRIME CONTRACTORS ONLY should submit a narrative demonstrating their experience in construction projects of similar nature as described in the Project Description. Responses are requested only from: POTENTIAL PRIME CONSTRUCTION CONTRACTORS WITH COMPANY BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $120M. Narratives shall be no longer than 10 pages. Email responses are required. Required Information: Company Name, address, phone number, point of contract, email, web address: CAGE Code and Unique Entity Identifier (UEI): North American Industry Classification System Code (NAICS): State whether your firm is classified by the Small Business Administration as any of the following under NAICS code: 236220. Small Business Small Disadvantaged Business Service-Disabled Veteran Owned Small Business (SDVOSB) Section 8(a) Women Owned Small Business (WOSB) HUBZone Historically black colleges and Universities/Minority Institutions None of the above Is your company currently registered in System for Award Management (SAM)? Has your company performed work for the federal Government under a different name or UEI/DUNS #, or as a member of a Joint Venture (JV)? If yes, provide an explanation: CAPABILITIES and SUBMISSION REQUIREMENTS: A brief capabilities narrative describing the interested firm's ability to meet anticipated contract requirements as described above. Include business size to include any official teaming arrangements as a partnership or joint venture. A brief narrative describing one project the interested firm has completed that is similar in size, scope, cost, and complexity to the anticipated contract requirements described above. State whether you were a Prime or a Subcontractor Start and end date of work Information on your bonding capability - SPECIFICALLY IDENTIFY CAPACITY OF PERFORMANCE AND PAYMENT BONDS The interested firm is also requested to provide insight into the following questions pertaining to the anticipated contract scope: What would be an anticipated contract duration for a project such as this, assuming a 5-day work week, 0700-1800? What would be an anticipated contract duration for a project such as this, assuming a 7-day work week, 0700-1800? What would be an approximate cost increase, in percentage, associated with each of the above extended work schedules versus a normal 40-hour work week? What is your average work force (in personnel)? What is your peak work force (in personnel)? Do you anticipate that dorm room renovation and associated temporary student relocation could be limited to 12 months? If 12 months is not achievable, please provide a suggested period of performance. What would be an anticipated size of a laydown area (in square feet)? What would be an anticipated number of general Contractor trailers required, to include major subcontractors? What would be an anticipated impact on cost (in percentage) if workforces have to be bussed from five miles away (remote workforce parking)? Do you estimate any risk mitigation measures required to meet suggested period of performance (i.e., dedicated access, space for stored materials, extended work hours, etc.)? SUBMISSION DUE DATE/TIME: Responses to this SOURCES SOUGHT NOTICE / REQUEST FOR INFORMATION should be received as soon as possible but no later than 2:00 pm (Mountain Time) on 18 November 2024. Please forward responses to the attention of Jessica Beckman, Contract Specialist, at Jessica.l.merrill2@usace.army.mil, and copy cenwo-ct-fsrm-doc-submission@usace.army.mil . Please note that the Government is not soliciting and will not entertain questions at this time and phone calls will not be accepted. Submission of your interest and response to these questions is not a prerequisite to any potential future posting, but participation will assist the Government in identifying sources with required capabilities and will assist the Government in planning and developing the general conditions for this contract requirement as well as the appropriate acquisition method for this contract requirement. In addition, an interested firm's response to this notice, or to any of the questions contained herein, will not constitute a commitment by the firm in any way on any of these matters. Interested bidders must be registered in the SAM database (sam.gov) to be eligible for award of any future Government contract. Provide comments or identify any concerns your company has regarding the planned solicitation. Note that the Government will not be responding to inquiries about the proposed solicitation at this time. Your responses and comments will be used by Government personnel to assess the viability and scope of the proposed solicitation and will be kept in strictest confidence. Telephone inquiries will not be accepted.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS