Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 29, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

South Fork Skokomish Large Wood Enhancement Project - Phase 3

Awarded
AG-05G2-S-10-0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The South Fork Skokomish Large Wood Enhancement Project Phase 3, managed by the USDA Forest Service Olympic National Forest, involves floodplain and river restoration between River Mile 12 and 13 of the South Fork Skokomish River. The contractor is responsible for constructing approximately 30 stable log debris structures along the main channel, floodplain, and tributary outlets, with each structure consisting of 40 to 180 pieces of wood partially buried below the streambed to ensure stability during floods. To facilitate the work, the project requires the reconstruction of roughly 0.5 mile of an abandoned forest road for heavy equipment access from the Oxbow campground. Tracked excavators and bulldozers will be utilized for the installation of logjams and large wood complexes. The old Oxbow campground area will serve as the general staging area and will remain closed for the duration of the construction activities.

General Info

Contract Value

$140,588.51

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Olympic National FOrest 1835 Black Lake Blvd SW, OLYMPIA, WA, 98512, USA

Set-Aside

NONE

Award Issued Date

Documents

6

Amendment 002 - Solicitation AG-05G2-S-10-0020

DOC, High priority: read this firstamendment
High

SF Skok Design Drawings

PDF, High priority: read this firstspecifications
High

South Fork Skokomish LWD Phase 1 Map Legend

PDF, Low priorityspecifications
Low

Amendment_No_001.doc

DOC

SF+Skokomish+LW_Phase+3+Map.docx

DOCX

Solicitation_SF_Skok_Construction_of_Log_Debris_Structures.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jun 15, 2010 to Jun 28, 2010. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Fs Olympic National Forest
Contacts1 person available
OfficeOLYMPIA, WA, 98512, USA
Office AddressOLYMPIA, WA, 98512, USA
Contacts
Miley B SutherlandContracting Officer

Full Description

Show more
Construction of Log Debris Structures. The Olympic National Forest intends to acquire by contract floodplain and river restoration work from approximately River Mile 12 to 13 along the main stem of the South Fork Skokomish River, adjacent to the Oxbow Campground area. Access is from Forest Service Road Nos. 23 and 2300-220. Contractor shall construct approximately 30 strategically placed log debris structures along the edges of the main channel, on the flood plain, and at tributary outlets. Project includes reconstructing approximately 0.5 mile of an abandoned forest road to provide access for heavy equipment and maintenance vehicles from the Oxbow campground to the project site. General staging area during instream construction will be in the old Oxbow campground area, which would be closed during the project. Tracked excavators and bulldozers will be used to construct logjams and large wood complexes along stream channels, gravel bars, and floodplains. Each of the log jams will be strategically located to accomplish specific restoration objectives. Most of the logjams would be constructed along the edges of the current stream channel or on the floodplain. The amount of wood per structure will depend on the structure type and location and will range from 40 to about 180 pieces of wood per structure. All of the logjams will be designed and constructed to remain stable during large flood events. A large portion of each structure will be buried below the streambed.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS