Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

South Glendale Pavement Management Program (PMP) Implementation Project

Closed
20260716003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation, pipeline and utility installation, surface work, and environmental support. Specific requirements encompass land surveying, site photography, tunneling, boring, jacking, micro tunneling, asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials include aggregate, geosynthetics, ready mix, precast concrete, and manhole materials, with a strong emphasis on compliance with Storm Water Pollution Prevention (SWPPP) standards. This solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. The deadline for responses is November 18, 2025, with invitations to bid and instructions managed through the Building Connected system. Primary coordination is handled by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

1 day ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
SB Minor B - Guardrail Replacement - San Diego County
Solicitation # 11A4460
The California Department of Transportation is soliciting bids for contract 11A4460, which involves guardrail replacement on I-8 in San Diego County. The project scope specifically includes the installation of the Midwest Guardrail System, featuring Type SFT-M End Anchor Assemblies and Type AGT Transition Railing at the Grossmont Center Drive/La Mesa Boulevard off-ramp (westbound) and West Willow (eastbound). This is a Small Business Minor B set-aside, requiring bidders to be certified small businesses at the time of bid opening and award. Bids must be submitted via email to Arlena Tedder by November 6, 2026, and any proposal exceeding $484,000.00 will be rejected. Award is based on a unit price-based bid, and the contractor must comply with 2025 Standard Specifications and Plans, as well as Cal/OSHA and CA RWQCB Region 9 regulations. Required submission documents include the Price Quote Proposal for Unit Items, Subcontractor List, Payee Data Record, and various certifications regarding civil rights and small business status. While DVBE goals are not established, participation is encouraged. Payment bonds are required for bids exceeding $25,000, and insurance certificates must be provided upon award. Invoicing is handled via progress payments for contracts over 20 working days, with a 25 percent withholding penalty if final utilization forms are missing.
California Department of Transportation

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The City of Glendale, California, is soliciting bids for the South Glendale Pavement Management Program Implementation Project, a comprehensive infrastructure initiative focused on pavement restoration and related public works improvements across the South Glendale area. The scope of work includes surface grinding and application of specialized asphalt mixes such as Asphalt Rubber Hot Mix and Asphalt Rubber Aggregate Membrane, along with selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, and cross gutters. Curb ramps will be modified and rebuilt to comply with current ADA accessibility standards. Additional components involve removing and replacing existing speed humps, adjusting utilities to finished grade, relocating water meters, planting street trees, and reinstalling traffic striping, pavement markings, and signage. The project also encompasses utility upgrades including new loop detector installation, selective street lighting enhancements, sanitary sewer repairs, cure-in-place pipe lining for sewer mains, and manhole shelf repairs. All work must be performed in strict accordance with approved plans, specifications, and applicable standards, including Caltrans, ASTM, and AASHTO requirements, and is subject to final inspection and acceptance by the City Director. The solicitation follows a Lowest Price Technically Acceptable (LPTA) award methodology, meaning the contract will be awarded to the lowest-priced responsive and responsible bidder who meets all mandatory qualifications and performance criteria. Bidders must demonstrate experience in public works, financial stability, a strong safety record, and a history of successful contract performance. All proposals must be submitted in hard copy to the City Clerk’s Office at 613 E. Broadway, Glendale, CA 91206, by the deadline of August 12, 2026, and are required to include specified forms such as the Bidder’s Proposal, Schedule of Bid Prices, Bid Bond, and statutory waivers. Required submittals include daily and weekly progress reports, final as-built drawings, and payment applications. Contractors must provide evidence of insurance coverage including $2 million in general liability and workers’ compensation as required by law, and must comply with all prevailing wage and collective bargaining agreements. Materials must meet defined performance standards, including UV stabilization and retroreflective properties for signage, and must be permanently marked with manufacturer and certification details. No contract pricing details are provided in the solicitation, as bids are to be submitted separately by proposers, and the City reserves the right to reject any or all bids or waive minor informalities.

General Info

Glendale seeks bids for South Glendale pavement repairs, ADA curb ramps, utility adjustments, tree planting, and sewer upgrades via cure-in-place lining.

Place of Performance

Glendale, CA, 91206, USA

Set-Aside

NONE

Documents

3

Addendum No. 1 - South Glendale Pavement Management Program Implementation Project Spec No. 3964

PDF, High priority: read this firstamendment
High

South Glendale Pavement Management Program PMP Implementation Project Specs No. 3964

PDF, High priority: read this firstspecifications
High

South Glendale PMP 3964 Construction and Sewer Improvement Plans

PDF, High priority: read this firstconstruction-plans
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendale
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Glendale
Office AddressN/A
Contacts

Full Description

Show more
Bid #3964: The project involves comprehensive pavement management across South Glendale. The scope includes surface grinding and placement of various asphalt mixes such as Asphalt Rubber Hot Mix (ARHM) and Asphalt Rubber Aggregate Membrane (ARAM). Work also entails the selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, and cross gutters. Curb ramps will be modified and reconstructed to meet current ADA standards. Additional tasks include the removal and replacement of existing speed humps, adjustment of utilities to finished grade, relocation of water meters, planting of street trees, and the removal and replacement of existing traffic striping, pavement markings, and signage. The project also covers the installation of new loop detectors, selective street lighting improvements, sanitary sewer point repairs, cure-in-place pipe (CIPP) lining, and manhole shelf repairs.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS