This Solicitation opportunity from Pennsylvania was posted on June 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation 2025-05 involves the rehabilitation and relocation of the timber superstructure for the Historic South Perkasie Covered Bridge located in Lenape Park, Borough of Perkasie, Bucks County, Pennsylvania. The project scope encompasses structural replacement, fiber strengthening, and relocation to a new foundation, requiring strict adherence to the Secretary of the Interior's Standards as well as FHWA, AASHTO, and PennDOT design standards. Key technical requirements include the use of Fiber Reinforced Plastic tensile reinforcing and specific composite structural assemblies, with contractors responsible for site use, utility protection under PA Act 287, and coordination with related abutment and wingwall work.
The contract is governed by EJCDC Standard General Conditions and includes rigorous administrative and legal requirements. Contractors must provide performance, payment, and maintenance bonds, as well as comprehensive insurance naming the Borough of Perkasie and other project partners as additional insured. Compliance with the Davis-Bacon Act for wage rates and the Commonwealth of Pennsylvania Public Works Employment Verification Act is mandatory. Project management protocols include detailed submittal processes, a formal schedule of values for monthly payments, and a structured system for change orders and field coordination meetings. Final payment is contingent upon the submission of a contractor's affidavit, a release of liens, and the consent of the surety.
General Info
Rehabilitate and relocate Historic South Perkasie Covered Bridge following strict structural and legal standards.
PDF, High priority: read this firstwage-determination
HighAI Summary for Davis-Bacon Wage Rate Determination - Bucks County, PA: This document is Appendix A, a Davis-Bacon Wage Rate Determination for building construction projects in Bucks County, Pennsylvania. It specifies the minimum hourly wage rates and fringe benefits for various labor classifications, including electricians, carpenters, ironworkers, and plumbers. The document references General Decision Number PA20240078 and includes updates through March 2025, as well as compliance requirements for Executive Orders 14026 and 13658.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Doc 00 41 00 BID FORM - EBID: A PEMA/FEMA contract document containing mandatory federal compliance clauses. It specifically details Equal Employment Opportunity (EEO) requirements per 2 C.F.R. Part 200 and compliance with the Clean Air Act and Federal Water Pollution Control Act for projects involving Perkasie Borough.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Document 00 91 13 Addenda: This document outlines the process for issuing and accessing addenda for the bidding process, specifying that updates will be posted on the PennBid website.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for EJCDC Standard General Conditions of the Construction Contract: This document contains the Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC). It establishes the legal and operational framework for a construction project, including definitions, contractor and owner responsibilities, payment terms, dispute resolution, and termination procedures.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Perkasie Borough South Perkasie Covered Bridge - Addendum #2: Addendum #2 dated July 22, 2025, for Contract No. #2025-05 (South Perkasie Covered Bridge - Timber Superstructure). This document revises Section 06 72 00 - Composite Structural Assemblies to clarify that alternate products may be used for Fiber Reinforced Plastic (FRP) tensile reinforcing, provided they meet specific material properties (STrt, MOErt, MOErc) and thickness requirements. It includes the updated technical specifications for composite structural assemblies, including requirements for FRP panels, lumber backing, and structural epoxy adhesives.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Perkasie Covered Bridge Restoration - General Requirements: Section 01 10 00 General Requirements for the restoration of the historic South Perkasie Covered Bridge in Perkasie, PA. The document outlines the project scope, including structural replacement, fiber strengthening, and relocation to a new foundation, as well as referenced design standards (AASHTO, ANSI/AWC, PennDOT), sequencing, permitting, and construction plan requirements.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 11 13 Summary of Work - South Perkasie Covered Bridge: This document is Section 01 11 13, Summary of Work, for the rehabilitation and relocation of the timber superstructure of the Historic South Perkasie Covered Bridge in Lenape Park, Borough of Perkasie. It outlines the scope of work, including adherence to Secretary of the Interior's Standards and FHWA/AASHTO/PennDOT standards, contractor responsibilities regarding site use and utility protection (PA Act 287), and coordination with other projects such as abutment and wingwall work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 Measurement and Payment: This document specifies the measurement and payment criteria for bridge restoration work. It outlines the procedures for unit price and lump sum payments, specifically detailing the scope and compensation for lifting and shoring, timber floor deck restoration, joists, transverse beams, lower cross bracing, lattice truss members, bottom chord, and wing wall posts restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: Technical specifications section detailing contract administration requirements, including the submission of the Schedule of Values, monthly application for payment procedures, and formal change order processes (Stipulated Price, Unit Price, Work Change Directives, and Time and Material changes).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: This document is a technical specification section (01 31 00) detailing the requirements for coordination, field engineering, and meeting protocols. It outlines the responsibilities for preconstruction and progress meetings, including required attendance and agenda items for project management and execution.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 Submittals: Technical specification section 01 33 00 detailing submittal procedures, construction progress schedules, product data, shop drawings, certificates, and manufacturer's instructions required for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for South Perkasie Covered Bridge - Timber Superstructure (Contract #2025-05) Addendum #1: Addendum #1 dated July 16, 2025, for the South Perkasie Covered Bridge - Timber Superstructure project. It documents the mandatory pre-bid meeting held on July 9, 2025, providing a Q&A summary regarding project value, start dates, permitting, and technical specifications. The document includes revisions to the Measurement and Payment section, notes on Davis-Bacon wage applicability, and attaches the pre-bid attendance list and bridge inspection report.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Supplementary Conditions - Contract CN 2025-05: This document contains the Supplementary Conditions for Contract CN 2025-05, amending the Standard General Conditions of the Construction Contract (EJCBC No. C-700). It defines critical project terms, commencement of contract times, schedule of values requirements, and contract document compositions. It also includes specific provisions regarding subsurface conditions and the distribution of drawing sets and project manuals.
PDF
PDF, Low prioritywage-determination
LowAI Summary for Commonwealth of Pennsylvania Public Works Employment Verification Form: A compliance form for contractors and subcontractors working on Commonwealth of Pennsylvania public works projects. The document requires affirmation that the employer is in compliance with the Public Works Employment Verification Act via the federal E-Verify Program (EVP).
PDF
PDF, Low prioritycontract-document
LowAI Summary for Consent of Surety to Final Payment - South Perkasie Covered Bridge: A legal form for the Consent of Surety to Final Payment regarding the South Perkasie Covered Bridge - Timber Superstructure project. The document serves as a formal agreement where the surety company approves final payment to the contractor after verifying that all labor and material claims have been settled, while maintaining the surety's obligations to the Borough of Perkasie.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Contractor's Affidavit - South Perkasie Covered Bridge: A Contractor's Affidavit form (Document 00 65 19.13) for Contract 2025-05: South Perkasie Covered Bridge - Timber Superstructure. The document serves as a sworn statement by the contractor to the Borough of Perkasie that all labor, materials, and claims associated with the work have been paid in full.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Contractor's Release of Liens - South Perkasie Covered Bridge: A legal template for a Contractor's Release of Liens associated with Contract 2025-05 for the South Perkasie Covered Bridge - Timber Superstructure. The document serves as a formal discharge of claims and demands against the Borough of Perkasie upon receipt of final payment.
PDF
PDF, Low prioritybond
LowAI Summary for Maintenance Bond - South Perkasie Covered Bridge: A template for a Maintenance Bond for Contract 2025-05: South Perkasie Covered Bridge - Timber Superstructure. The bond requires the Principal to provide a guarantee for 100% of the completed contract amount to cover defects in materials or workmanship for twelve months following final completion.
PDF
PDF, Low prioritypayment-bond
LowAI Summary for Payment Bond 00 61 13.16 - Borough of Perkasie: A standard payment bond form (EJCIC C-615(A) Modified) for a contract with the Borough of Perkasie. The document outlines the obligations of the Contractor and Surety to ensure payment for labor, materials, and equipment furnished by claimants during the performance of the contract.
PDF
PDF, Low priorityperformance-bond
LowAI Summary for Performance Bond - Cover Bridge Timber Superstructure: A legal performance bond template for the Borough of Perkasie regarding the Cover Bridge Timber Superstructure project. The document outlines the obligations of the Surety and Contractor to the Owner in the event of a contractor default, including procedures for notification, remediation, and liability limits.
PDF
PDF, Low priorityspecifications
LowAI Summary for South Perkasie Covered Bridge - Certificate of Insurance: Document 00 62 16 for Contract 2025-05 regarding the South Perkasie Covered Bridge Timber Superstructure. It specifies the required additional insured parties, including Perkasie Borough, Gilmore & Associates, Inc., Wood Research and Development, and the Commonwealth of Pennsylvania, referencing Document 00 73 00 for coverage limits.
Ref. #: Perkasie Borough, Bucks County This contract includes a base bid for the rehabilitation and relocation of the timber superstructure for the Historic South Perkasie Covered Bridge located in Lenape Park in the Borough of Perkasie.