Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on June 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

South Regional Water Treatment Plant Expansion Production Well SRO-5 (RE-BID)

Closed
69-ITB-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves the construction of a new 24-inch production well at the South Regional Water Treatment Plant, designated as SRO-5, with a total depth of approximately 850 feet and a casing length of around 320 feet. The scope includes installing surface and well casings, open hole sections, grout, and performing development, water quality testing, and alignment assessments. Post-construction, geophysical and video logging will be conducted to evaluate the well’s condition, along with step-drawdown and constant rate discharge tests to assess aquifer productivity and ensure proper well development. Water quality testing during construction and testing phases will verify compliance with standards. The project is estimated at $755,000 and is part of a solicitation posted by the Florida procurement office, with a response deadline of August 5, 2025. The work aims to enhance the water supply system by expanding production capacity and ensuring well integrity and water quality, adhering to specified plans and specifications.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Procurement
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Procurement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
South Regional Water Treatment Plant (SRWTP) Expansion Production Well SRO-5. The work shall be constructed in accordance with the plans and specifications. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following:
Construction of one 24-inch production well with a total casing length of approximately 320 feet and a total depth of 850 feet including surface casing, well casing, open hole, grout, development, water quality testing, plumbness and alignment testing, disinfection, well flange, and concrete pad. A series of geophysical logs and a video log will be performed on the water supply well after completion. A step-drawdown test shall be conducted on the water supply well in order to show proper development. An 8-hour constant rate discharge test shall be performed on well SRO-5 to determine the relative productivity of the Floridan aquifer in the area. Water quality testing shall also be performed during the construction and testing of the water supply well.
Project Estimate: $755,000.00

More opportunities from Florida → Procurement

Same awarding agency

NAICS: 459510
New
SLED
INVITATION FOR SALE - Surplus Sale - Ground Support Equipment (GSE) & Miscellaneous Related Items - RE-POSTING
Solicitation # 2027-007-ITB
The Sanford Airport Authority is soliciting sealed bids for the sale of surplus Ground Support Equipment (GSE) and miscellaneous related items located at Orlando Sanford International Airport. All property is offered on an as-is, where-is basis, with all faults and defects, and no warranties or guarantees are provided. GSE will be sold individually, while miscellaneous items will be sold by line-item lot. Bidders are responsible for inspecting all equipment prior to submitting a bid and must demonstrate the financial capability to complete the purchase and removal of the items. Bids must be submitted through the Authority's e-Procurement Portal by December 7, 2026, at 12:00 pm. Successful bidders must remit full payment via certified check, cashier's check, wire transfer, or ACH within five calendar days of the Notice of Award; personal and company checks or credit cards are not accepted. Purchased property must be removed within fifteen calendar days following payment confirmation. Removal of motorized or oversized equipment may require a written removal plan, and insurance is mandatory for activities involving commercial vehicles, heavy equipment, cranes, rigging, or towing. All bids remain binding for thirty calendar days and are subject to public disclosure under Chapter 119 of the Florida Statutes.
Used Merchandise Retailers

POSTED

about 21 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
City Hall 3rd Floor Renovations
Solicitation # 2026-135
Invitation to Bid No. 2026-135 is a solicitation issued by the City of St. Cloud, Florida, for renovation services on the third floor of City Hall. With an estimated project cost of 80,000 dollars, the scope of work focuses on the City Manager's Department and includes converting a storage room into a break room and a conference room, as well as modifying the City Attorney and City Clerk's area. Required improvements encompass the installation of commercial-grade laminate flooring, new walls and partitions, LED lighting and electrical upgrades, painting, carpentry, and the relocation of access-control pads. The contractor is responsible for all permits, licenses, and inspections, ensuring all work complies with the Florida Building Code and ADA requirements. Bids must be submitted electronically via the OpenGov portal by November 19, 2026, at 2:00 pm. To be considered, bidders must hold a valid State of Florida Construction license and provide certifications regarding public entity crimes and federal debarment. The City will evaluate bids based on responsiveness and pricing, rejecting any that are obviously unbalanced. While performance and bid bonds are not required, the successful contractor must provide insurance within ten calendar days of the award and comply with the Davis-Bacon Act for prevailing wage rates. Final payment is contingent upon a thorough inspection to ensure all work is functional and code-compliant, with a minimum one-year warranty required for workmanship and materials.
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in 2 days
View Details
NAICS: 541611
New
SLED
AI Consulting Services for Policy & Process Modernization
Solicitation # 27-21EJ
The Sarasota Manatee Airport Authority is seeking a qualified consultant under solicitation 27-21EJ to modernize its policies, directives, and procedures and to design, build, and pilot a governed AI Assistant for Executive Leadership. The project is structured into three workstreams, with the final phase beginning only after the Authority approves the pilot. The ultimate goal is to establish an operating model that the Authority's Information Technology Services team can manage independently without further developer support. All deliverables and AI interactions must comply with Florida public-records law (Chapter 119), and the Authority operates on a Microsoft 365 and Azure Government Community Cloud tenant. The contract features an initial term expiring March 31, 2031, with the possibility of two one-year renewals. Award decisions are based on a points-based evaluation of the best value and best interests of the Authority. Selected consultants must provide an organizational chart and resumes for key personnel demonstrating expertise in AI governance, data privacy, and cybersecurity. Invoices must be submitted electronically to the Authority Finance Department with detailed itemization of services and personnel. Respondents must submit all proposals via the OpenGov portal, including required certifications regarding non-collusion, anti-human trafficking, and the absence of conflicts of interest.
Administrative Management and General Management Consulting Services

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 541512
New
SLED
Airport Digital Twin Platform Implementation and Support Services
Solicitation # 2027-006-RFP
The Sanford Airport Authority is soliciting proposals under RFP 2027-006 for the implementation and support of an Airport Digital Twin Platform and an open, standards-based ecosystem at Orlando Sanford International Airport (SFB). The project aims to integrate disparate operational, maintenance, and business systems into a common digital environment to enhance asset management, operational awareness, and facility stewardship. The initial scope focuses on terminal and airfield infrastructure, specifically targeting performance monitoring, preventive and predictive maintenance, and engineering decision support. The selected solution provider will be responsible for configuring, deploying, and supporting a commercially available platform that provides advanced analytics, dashboards, and workflows while ensuring existing systems remain the authoritative records. The procurement process is governed by Florida law, including public records disclosures and restrictions on public entity crimes. Proposals are due by December 3, 2026, and must include a technical proposal, a cost proposal detailing implementation and recurring fees, and evidence of minimum qualifications such as business licensing in Florida and insurance coverage. Evaluation is based on a best-value determination, considering the respondent's experience, technical approach, and implementation roadmap. While the Authority has not set a fixed go-live date, the successful vendor must propose a detailed implementation schedule and milestones. Final award determination is subject to the approval of the Authority's Board of Directors.
Computer Systems Design Services

POSTED

4 days ago

DEADLINE

in 16 days
View Details
NAICS: 424690
New
SLED
Countywide Chemicals
Solicitation # 26-8705
Collier County is soliciting bids under solicitation number 26-8705 for the procurement of various chemicals to support its water, wastewater, and parks and recreation facilities. The scope of work includes the delivery of chemicals such as ammonia, chlorine, carbon dioxide, sodium hydroxide, and various acids and polymers to multiple regional plants and aquatic venues throughout the county. The contract is intended for a four-year term with a one-year renewal option. Awards will be made to the lowest responsive and responsible bidders on a per-line-item basis, with the county intending to establish primary, secondary, and tertiary suppliers to ensure a reliable supply chain. Bidders must provide all-inclusive unit pricing that covers all costs, including fuel and tariffs, and must adhere to strict technical specifications and safety standards, including AWWA and NSF/ANSI Standard 60. Deliveries are FOB Destination and must be coordinated with a minimum of four hours' notice. Mandatory requirements for submission include E-Verify enrollment, conflict of interest certifications, and proof of registration with the Florida Department of State. Additionally, successful bidders for projects exceeding 200,000 dollars must provide performance and payment bonds for 100 percent of the contract amount. All bids must be submitted electronically via the OpenGov portal by the deadline of December 1, 2026.
Other Chemical and Allied Products Merchant Wholesalers

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 238160
New
SLED
Hangars 1 and 2 Roof Replacement
Solicitation # 001-2027
The City of Lake City, Florida, issued Invitation to Bid 001-2027 for the replacement of existing roofing systems on Hangars 1 and 2 at the Lake City Gateway Airport. The scope of work involves the demolition and disposal of existing metal roof panels and purlins and the installation of a new 24-gauge standing seam metal roof system with new light-gauge metal purlins. The project utilizes a delegated design approach for the roof deck and connections. Performance must begin between five and fifteen days after the Notice to Proceed, with a total completion timeline of 240 calendar days, although an alternative option for an accelerated 60-day building shutdown is available. Bids must be submitted electronically via the OpenGov Procurement portal by November 19, 2026, at 2:00 pm EST. The contract will be awarded to the responsible bidder providing the lowest responsive bid, with a 5% preference given to residents of Columbia County, Florida. Required submission materials include a bid bond for 5% of the total maximum bid price, evidence of competency, and certification of non-collusion. The successful contractor must provide separate performance and payment bonds for 100% of the contract price and comply with federal regulations, including 2 CFR Part 200 and the E-Verify Program. Strict operational requirements are in place due to the airport environment, including adherence to a construction safety and phasing plan to prevent Foreign Object Debris (FOD) on airside pavements. All materials must be stored and secured against wind displacement. Contract administration, including payment applications and change order requests, is managed through the Architect via an internet-based submittal service. Quality assurance is the responsibility of the Owner, while the Contractor is responsible for quality control in accordance with various ASTM standards.
Roofing Contractors

POSTED

4 days ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
SLED
Immokalee Sports Complex Phase 1A & 1B
Solicitation # 26-8703
Collier County is soliciting sealed bids for the construction of the Immokalee Sports Complex Phase 1A and 1B, located at 505 Escambia St., Immokalee, Florida. The project has an anticipated budget of 6,240,000 dollars and is divided into two primary scopes. Phase 1A focuses on the construction of two artificial turf fields, stormwater improvements, fencing, and landscaping. Phase 1B involves the construction of a 1,190 square foot restroom facility with mechanical, electrical, and plumbing components, a pavilion structure, utility tie-ins, and concrete sidewalks. The project requires the use of Procore for management and mandates that the successful contractor possess at least ten years of experience in sports field construction. Bids must be submitted electronically via the OpenGov portal by November 12, 2026, at 3:00 p.m. local time. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for submission include a 5 percent bid bond, proof of E-Verify enrollment, and a certificate of authority to conduct business in Florida. The successful bidder must provide performance and payment bonds for 100 percent of the contract amount. The project timeline includes a 180-calendar day completion period, with liquidated damages set at 5,549 dollars per day for delays. Additionally, the contractor must comply with Florida State statutes regarding the use of local forest products and certify that they are not engaged in a boycott of Israel.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS