Southeast Bay Outfall Settlement Monitoring & 54-inch Pipe Repair Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The San Francisco Public Utilities Commission will perform maintenance on the Southeast Bay Outfall pipeline at Pier 80, focusing on two distinct areas: installing new settlement monitors along the 60-inch reinforced concrete pipe and repairing the 54-inch pipeline underneath the pier. Up to five settlement monitors will be placed near the shoreline, one just west of Illinois Street in Tulare Park and four just east of it, each requiring a small 2-foot diameter by 5-foot-deep excavation with a concrete cap installed flush to the ground surface. These installations are designed to monitor ground movement without disrupting the surrounding environment. Concurrently, repairs to the submerged 54-inch pipeline will include replacing the internal mechanical seal at a joint, installing a pipe strap, repairing restraining rods, and applying corrosion protection. All repair work will occur during low tide when the pipeline is exposed, with access facilitated by boats launched from either a dock near the Islais Creek Booster Pump Station or via a temporary crane at Pier 80. No ground disturbance is involved in the pipeline repair, ensuring minimal impact on the surrounding infrastructure and ecosystem.
General Info
Agency
NAICS
Place of Performance
San Francisco, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code