Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Washington was posted on May 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SPCC Plan Development and Compliance

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 12 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This subcontract opportunity, managed by the Public Works agency in Washington, involves the professional development and implementation of a Stormwater Pollution Prevention Plan (SWPPP) and a Spill Prevention, Control, and Countermeasure (SPCC) plan. The primary objective is to ensure full regulatory compliance with standards set by the Environmental Protection Agency and the Washington State Department of Transportation. Interested parties must submit their responses by the deadline of June 24, 2025. The project falls under NAICS code 541620, focusing on environmental consulting services to manage stormwater pollution and spill prevention protocols.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of P23010-1.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

S 11th Street and S Timm Road Safety Improvement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Dangerous Tree Sanitization and CertificationOpen now, due in 28 days
  • Water Pollution Control ProgrammingOpen now, due in 24 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Development and implementation of a Stormwater Pollution Prevention Plan (SPCC/SWPPP) compliant with EPA and WSDOT regulations.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project (PW# 2025-074) is a federally funded infrastructure initiative managed by the Seattle Department of Transportation. The project focuses on improvements to Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. The scope of work includes planing asphalt overlay, removing and replacing concrete panels and base repair, realigning the intersection at NE 113th Street, and installing curb bulbs at NE 114th Street and NE 115th Street. Additional requirements involve the installation of ADA-compliant curb ramps, sidewalk restoration, channelization, signing, concrete bike barriers, traffic signals, landscaping, and storm drainage. The engineer's estimate for the project is between $12,500,000 and $12,800,000. The contract is awarded to the lowest responsive bidder, with proposed recycling percentages serving as a tie-breaker. Bidders must comply with FHWA regulations, including Buy America requirements and a 13% Federal Small Business Enterprise (FSBE) goal. Performance is governed by the 2026 City of Seattle and WSDOT Standard Specifications. Key administrative requirements include a bid guaranty of 5% of the total bid and the provision of payment and performance bonds. Contractors are responsible for quality control and must coordinate specific inspections, such as those required by KC Metro for shelter footings. Bids are submitted via the OpenGov portal or by hard copy to the City of Seattle.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 1 day
View Details
NAICS: 238220
New
SLED
Charles Street Vehicle Maintenance HVAC Improvements
Solicitation # PW#2026-041
Solicitation PW#2026-041 is a mechanical project for the City of Seattle's Department of Finance and Administrative Services to perform HVAC improvements at the Charles Street Vehicle Maintenance facility located at 805 South Charles Street, Seattle, WA. The primary scope of work involves upgrading the existing exhaust fan system and installing a new makeup air unit to improve the removal of noxious gases from the welding shop. The project has an architect and engineer estimate of 1,540,511.00 dollars and requires the contractor to provide all labor, materials, and equipment necessary for completion, including adherence to ADA compliance and DOT regulations. The contract will be awarded to the responsible bidder providing the lowest responsive bid, with a strong emphasis on social equity. Bidders must submit a Women and Minority Business Enterprise (WMBE) Inclusion Plan and earn at least 10 points to be considered responsive, reflecting a past performance utilization rate of 15 percent. Required submissions include a bid bond, a signed Letter of Assent, and a Social Equity Plan. Once awarded, the contractor must provide payment and performance bonds for 100 percent of the contract amount plus state sales tax. Performance is monitored via a matrix focusing on construction work and contract compliance, with liquidated damages of 1,000.00 dollars per working day for delays in achieving substantial completion.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

7 days ago

DEADLINE

in 1 day
View Details
NAICS: 541320
SLED
Deane's Children's Park Phase I and II Improvements
Solicitation # 2026-RFQ-044
Solicitation 2026-RFQ-044, issued by the City of Mercer Island Public Works department, seeks professional services for the detailed design, permitting, and construction of Phase I and II improvements at Deane's Children's Park located at 5701 Island Crest Way, Washington. The project focuses on expanding inclusive play and accessibility while preserving the site's natural character. Phase I includes nature-based inclusive play features for ages 5 to 12 and older, swings, fencing, accessible parking, a connection to Island Park Elementary, utility infrastructure, and native vegetation restoration. Phase II involves the redevelopment of the central play area with inclusive features for children ages 2 to 12 and older. The selected consultant must be licensed in Washington State per RCW 39.80.020 and adhere to ADA and playground safety standards. The contract will be governed by the City's standard professional services agreement, requiring the consultant to act as an independent contractor and provide comprehensive indemnification to the City. Payment will be made via City warrant within 45 days of receiving monthly invoices. The evaluation process involves screening Statements of Qualifications, which are due by December 4, 2026, and may include short-listing, interviews, and reference checks. The final selection is at the sole discretion of the City. Awarded firms must maintain cost records for three years following final payment and provide technical construction support, including the review of RFIs and shop drawings.
Landscape Architectural Services

POSTED

13 days ago

DEADLINE

in 18 days
View Details
NAICS: 333923
SLED
Gorge Powerhouse Crane Replacement
Solicitation # 2022-076A
The City of Seattle is soliciting Statements of Qualifications for the Gorge Powerhouse Crane Replacement Design-Build Project located in Newhalem, Washington. This project involves the comprehensive design, demolition, construction, and commissioning of two replacement overhead bridge cranes, each rated at 150T, including a new collector for main power and communication circuits and all necessary controls and radio equipment. The estimated contract value is 12.5 million dollars, with an estimated notice to proceed date of March 1, 2027. The selected Design-Builder will be responsible for all project management, engineering, and quality control, ensuring compliance with ASME B30.2 and CMAA Specification 78 standards, as well as the Skagit Hydroelectric Project Historic Resources Management Plan. The procurement process utilizes a scored evaluation to identify the highest scored proposer, beginning with a qualifications phase that emphasizes past performance on similar projects. Qualified firms must provide a bonding commitment of at least 10.5 million dollars and meet strict insurance and registration requirements within the State of Washington. Key deliverables include 60 percent and 90 percent design packages, factory and site acceptance testing, and specialized training for crane operations and maintenance. The contract mandates adherence to prevailing wages, social equity and underutilized business inclusion plans, and strict safety standards, including the provision of an OSHA Experience Factor for the past three years.
Overhead Traveling Crane, Hoist, and Monorail System Manufacturing

POSTED

15 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS