Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 5, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SPECIAL NOTICE to announce an INDUSTRY DAY for JAMAICA BAY MARSH ISLAND RESTORATION to be held on Wednesday, November 5, 2008 beginning at 1:00 PM.

Closed
W912DS-09-S-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Department Of Commerce Nist

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 236210
New
Federal
Sources Sought - POST TEST LITHIUM BATTERY STORAGE
Solicitation # N00167-27-RFPREQ-CD-102-0002
The Naval Sea Systems Command Naval Surface Warfare Center Carderock Division is conducting a sources sought effort for the construction of a Post-Test Lithium Battery Storage Facility in West Bethesda, Maryland. This project, classified under NAICS code 236210 for Industrial Building Construction, involves the creation of a storage area featuring a non-flammable single-pitch sloped roof, a perimeter fence with a gate, 3-hour rated firewalls, and concrete walls for large battery storage. Additional requirements include low-voltage outlets, pole-mounted LED flood lighting, and a dedicated forklift access road. The effort must be completed within 210 days of the award and adhere to Unified Facilities Guide Specifications and other stringent technical criteria. This notice is not a request for proposal, and no award will be made directly from this notice. Interested small and large businesses must submit a capability statement and a Rough Order of Magnitude by 1700 EST on 18 November 2026 to Heather Valiga. The government will use these responses to determine the future acquisition strategy. Because the project is located on a secure military installation, all personnel must obtain proper clearances and credentials. Key deliverables include an Activity Hazard Analysis and a detailed schedule due within five days of the pre-construction meeting, as well as a personnel list provided seven days before the start date.
Nswc Carderock

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 236210
New
SLED
Arrowhead Regional Medical Center Lot 1 Parking Structure
Solicitation # 2026010330
The County of San Bernardino is soliciting the construction of the Arrowhead Regional Medical Center Lot 1 Parking Structure located at 400 North Pepper Avenue in Colton, California. The project consists of a post-tensioned, cast-in-place structure spanning up to 500,000 square feet across six levels, providing up to 1,600 parking spaces. Key design elements include a finished exterior with an architectural mesh facade on the first floor, two banks of two elevators, and the installation of photovoltaic panels on the top level. The facility will be restricted to employees via badge access and will feature security enhancements such as LED lighting, emergency call boxes, security cameras, and locked gates. The project must comply with the California Building Code, the Americans with Disabilities Act, the 2022 California Building Energy Efficiency Standards (Title 24), and the California Green Building Standards Code (CALGreen) for electric vehicle charging stations. Environmental mitigation includes a landscape plan to offset the removal of approximately 51 trees. To maintain parking capacity during construction, a temporary surface parking lot will be operated at 1351 West Valley Boulevard with shuttle services provided to the campus. The project has undergone CEQA review, resulting in a Mitigated Negative Declaration confirming that the project will not have significant environmental impacts provided mitigation measures are implemented.
San Bernardino County

POSTED

2 days ago

DEADLINE

N/A

General Info

NAICS

236210 - Industrial Building Construction

Place of Performance

26 Federal Plaza. Room number will be posted later., NEW YORK, NY, 10278, USA

Set-Aside

NONE

Documents

8

Constructed+Elders+East+Mitigation+Plans.pdf

PDF

Elders+West+Marsh+Draft+Plans.pdf

PDF

Example+Fencing+%26+Planting+Specifications.pdf

PDF

Industry+Meeting+Agenda+Nov+5+08.pdf

PDF

Industry+Presentation+Nov508.pdf

PDF

Marsh+Island+Industry+Notice+Oct+22+.pdf

PDF

Yellow+Bar+Access+Channel+Condition+Survey.pdf

PDF

Yellow+Bar+Preliminary+Design+Alternatives.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

event

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
Contacts2 people available
OfficeNEW YORK, NY, 10278-0004, USA
Office AddressNEW YORK, NY, 10278-0004, USA
Contacts
Wei LuginLead Contract Specialist
Albert C RumphContract Specialist

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 13 hours ago

DEADLINE

in about 17 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS