Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Specialized Industrial Coating Applicator

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Tolleson involves the application of protective industrial epoxy coatings for wastewater treatment plant projects. The scope of work includes coating the top of walls and the underside of covers to prevent leaks and corrosion, with specific termination elevations defined by Drawing S-02-302. The contractor is responsible for delivering sealed, epoxy-coated concrete surfaces in accordance with manufacturer installation recommendations. To qualify for this project, the contractor must hold a valid Arizona contractor license. The opportunity is managed by the Arizona Utilities agency under NAICS code 238390, with a response deadline set for January 14, 2027. There is no specified set-aside status for this procurement.

General Info

Subcontract for epoxy coatings at Tolleson wastewater plant; Arizona license required by 2027.

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

This scope was carved out of CMAR-26-011.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Digester 4 and Digested Sludge Storage Tank Rehabilitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 51 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 7 documents on the prime contractFrom Digester 4 and Digested Sludge Storage Tank Rehabilitation
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Utilities
ContactsNo contacts available
OfficeN/A
Organization / AgencyArizona → Utilities
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Applies protective industrial epoxy coatings for prime contractors on City of Tolleson wastewater treatment plant projects. Coats the underside of covers and the top of walls to prevent corrosion and leaks, terminating coatings at specific elevations per Drawing S-02-302. Requires Arizona contractor license and adherence to manufacturer installation recommendations. Delivers sealed, epoxy-coated concrete surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 238390
New
Federal
Springdale JCC – Gymnasium Foundation Waterproofing
Solicitation # springdale-jcc-gymnasium-foundation-waterproofing
The Career Systems Development Corporation is seeking quotes for gymnasium foundation waterproofing at the Springdale Job Corps Center in Troutdale, Oregon. The project aims to mitigate groundwater seepage and excessive humidity through a comprehensive scope of work that includes excavation, the installation of a minimum 24-inch high waterproof membrane on the foundation perimeter, and the implementation of a complete sump pump system with associated drainage pipes, liners, and alarms. Additionally, the contractor will be responsible for installing discharge lines, dedicated electrical outlets for pumps and dehumidifiers, and performing hydrojetting of existing drain lines. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated entities. All work must comply with the Davis-Bacon Act, specifically Wage Determination OR20260100, R.1, and contractors must provide a valid Oregon CCB contractor's license number. Quotes must be itemized by parts and labor and remain valid for 90 days from the closing date of December 11, 2026. For projects valued at $100,000 or more, payment and performance bonds are required upon award. The successful contractor must provide a minimum 2-year materials and workmanship warranty along with appropriate manufacturer warranties. Quotes for unit replacement must include all necessary support equipment, such as dumpsters, temporary toilets, and perimeter security.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Arizona → Utilities

Same awarding agency

NAICS: 237110
New
SLED
Digester 4 and Digested Sludge Storage Tank Rehabilitation
Solicitation # CMAR-26-011
The City of Tolleson is seeking Statements of Qualifications from qualified Construction Manager at Risk (CMAR) firms for the rehabilitation of Digester 4 and the Digested Sludge Storage Tank (DSST). The project scope includes the supply, delivery, fabrication, installation, and testing of all necessary materials and equipment, specifically highlighting the federally funded demolition and installation of a new enclosed waste gas burner. The total program budget for the project is approximately $12,000,000, and all work must be completed by June 30, 2028. The contract will follow a two-phase delivery method, where the selected CMAR will collaborate with the owner and engineer during a pre-construction phase to establish a Guaranteed Maximum Price (GMP). Applicants must submit a Statement of Qualifications limited to 10 pages, including two-page resumes for key personnel and a bonding capacity statement from a surety company rated A or better by AM Best, Inc. Because the project involves federal financial assistance, all contractors and subcontractors must maintain an active registration in the federal System for Award Management (SAM.gov) and possess a Unique Entity ID (UEI). The contract is subject to several federal regulations, including the Build America, Buy America (BABA) provisions, Davis-Bacon prevailing wage and labor standards, and the National Environmental Policy Act. Final acceptance of the work will be made by the City of Tolleson upon the recommendation of the Project Manager or Construction Manager.
Water and Sewer Line and Related Structures Construction

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS