Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Ceiling Installation & Renovation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Whitfield County Schools in Georgia involves the installation and replacement of ceiling grids and tiles for prime contractors on various facility projects. The scope of work includes the removal of old ceilings and the installation of new acoustic ceiling tiles and suspension grids, adhering to standard commercial interior finish standards to deliver completed ceiling systems across renovated areas. The solicitation was posted on November 24, 2026, with a response deadline of January 5, 2027. The project falls under NAICS code 238390 and there is no specific set-aside status designated for this requirement.

General Info

Documents

This scope was carved out of PE-55102-NONST-2027-000000039.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Modifications and Renovations to the Whitfield County College and Career Academy

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 42 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Modifications and Renovations to the Whitfield County College and Career Academy
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Whitfield County Schools
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and replaces ceiling grids and tiles for prime contractors on Whitfield County Schools facility projects. Removes old ceilings and installs new acoustic ceiling tiles (ACT) and suspension grids using standard commercial interior finish standards. Delivers installed ceiling systems across the renovated areas.

Similar Contracts

Same NAICS industry code

NAICS: 238390
New
Federal
Springdale JCC – Gymnasium Foundation Waterproofing
Solicitation # springdale-jcc-gymnasium-foundation-waterproofing
The Career Systems Development Corporation is seeking quotes for gymnasium foundation waterproofing at the Springdale Job Corps Center in Troutdale, Oregon. The project aims to mitigate groundwater seepage and excessive humidity through a comprehensive scope of work that includes excavation, the installation of a minimum 24-inch high waterproof membrane on the foundation perimeter, and the implementation of a complete sump pump system with associated drainage pipes, liners, and alarms. Additionally, the contractor will be responsible for installing discharge lines, dedicated electrical outlets for pumps and dehumidifiers, and performing hydrojetting of existing drain lines. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated entities. All work must comply with the Davis-Bacon Act, specifically Wage Determination OR20260100, R.1, and contractors must provide a valid Oregon CCB contractor's license number. Quotes must be itemized by parts and labor and remain valid for 90 days from the closing date of December 11, 2026. For projects valued at $100,000 or more, payment and performance bonds are required upon award. The successful contractor must provide a minimum 2-year materials and workmanship warranty along with appropriate manufacturer warranties. Quotes for unit replacement must include all necessary support equipment, such as dumpsters, temporary toilets, and perimeter security.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Georgia → Whitfield County Schools

Same awarding agency

NAICS: 238990
SLED
Valley Point Elementary - Playground Equipment
Solicitation # WCS-FA-2027-001
Whitfield County Schools is soliciting proposals from qualified, licensed, and experienced contractors to provide all designs, labor, materials, equipment, supervision, permits, and inspections necessary to install playground equipment for children aged 5-12 at Valley Point Elementary School in Georgia. The project requires the contractor to be an IPEMA Certified Manufacturer and Installer and to provide a HIC Certified system. Key technical specifications include the use of 5-inch round steel posts with 11mil powder coating, stainless steel or galvanized hardware, and tamper-resistant connections. The design must exclude crawl tubes and fabric shades, permitting only hard surface shade canopies, and must include an ADA ramp to the playground border. All equipment must adhere to ASTM standards for safety performance, impact attenuation, and engineered wood fiber. Proposals must be submitted in sealed format to the Whitfield County Operations Department by December 9, 2026, at 2:00 pm. Each submission must include a bid bond or certified check for 5% of the total proposal amount, a signed E-Verify affidavit, and documentation of accessibility compliance conforming to WCAG 2.1 Level AA. Evaluation will be based on cost, responsiveness, suitability for purpose, references, and management. The contract includes a preference for U.S.-produced goods and materials and may be extended for up to four one-year terms. Payment is issued in full upon project completion and sign-off by the Director of Facilities. There is no specified set-aside status for this solicitation.
All Other Specialty Trade Contractors

POSTED

15 days ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS