Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Spill and Emergency Cleanup Response

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W071 Endist OmahaView Agency

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Littleton, CO, 80128, USA

Set-Aside

SBA

Documents

This scope was carved out of W9128F26QA090.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tri-Lakes Chatfield Trash Removal Service

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W071 Endist Omaha
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Rapid response to illegal dumping, hazardous spills, or storm-related debris requiring immediate action.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Mold Remediation
Solicitation # mold-remediation
Serrato Corporation DBA Flint Hills Job Corps is seeking a licensed mold remediation contractor for a subcontracting opportunity at the Flint Hills Job Corps Center in Manhattan, Kansas. The project focuses on removing mold contamination and restoring safe conditions in the Solo Parent Dormitory, specifically targeting rooms 208, 209, 210, 302, 310, and the 300 hallway linen closet. The scope of work includes site preparation, containment using critical barriers and HEPA filtration, removal of contaminated porous materials, and the application of EPA-registered antimicrobial treatments. All work must be performed within a 10-business-day period of performance and adhere to IICRC S520 standards, EPA guidelines, OSHA regulations, and Job Corps safety standards. Proposals must be submitted by August 13, 2026, at 4:00 PM CST and must include a W-9, DUNS number, and a detailed pricing schedule breaking down labor, hours, materials, and total costs. Award will be based on the proposal most advantageous to Serrato Corporation, focusing on price and price-related factors, provided the offeror meets all material compliance gates. Required documentation includes applicable licenses and a Certificate of Liability Insurance naming the Center as an additional insured. Final acceptance is contingent upon a Post-Remediation Verification report featuring visual inspections and lab results, and the contractor must provide a typical one-year warranty on all remediation work. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-owned businesses.
Serrato Corporation DBA Flint Hills Job Corps

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237310
New
Federal
Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
Solicitation # W9128F26RA107
The contract seeks to repair and replace Section V of the Mass Parking Apron at Minot Air Force Base in North Dakota, with the goal of establishing a uniform width of 340 feet south of the centerline taxiway, correcting a longstanding discrepancy where the eastern half was 5 feet narrower than the western half. The project will be executed using a design-bid-build delivery method and involves complete removal and reconstruction of the affected section over multiple phases across several years. A temporary asphalt concrete transition will be installed to integrate the new pavement with remaining existing sections, and adjacent turf areas will be regraded to meet drainage standards requiring a 1.5-inch drop-off at the pavement edge. Existing asphalt shoulders will be milled and stockpiled for future use by the base. The full scope is part of a multi-year program to overhaul the entire Mass Parking Apron, with this section being one of several planned replacements. The estimated construction cost ranges between $25 million and $35 million. The solicitation, identified as W9128F26RA107, is restricted exclusively to small businesses under a total small business set-aside and is open for bids for 30 days, closing on August 20, 2026. It is issued by the U.S. Army Corps of Engineers, Omaha District, under the Department of Defense, and falls under NAICS code 237310 for Heavy and Civil Engineering Construction. Primary point of contact is Shayna Zeleznik, with Jessica Beckman available as a secondary contact, and all inquiries should be directed to their provided email addresses and phone number. The work location is Minot Air Force Base, with administrative oversight based in Omaha, Nebraska. The contract opportunity is listed on SAM.gov with the provided UI link for further details.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers, Omaha District, is conducting a Sources Sought announcement for the Sentinel Utility Corridor project at Malmstrom Air Force Base, Montana. This high-value initiative has an estimated magnitude between $1.4 billion and $2.0 billion and will be executed using a Progressive Design-Build (PDB) framework under Other Transaction Authority (OTA) per 10 U.S.C. § 2808a. This non-traditional acquisition method bypasses standard Federal Acquisition Regulation (FAR) clauses in favor of custom-negotiated Agreement Articles and commercial practices. The project is structured in two primary phases: Agreement Phase 1, focusing on design and preconstruction, and Agreement Phase 2, covering final design and construction. The selection process utilizes a Qualifications-Based Selection (QBS) methodology, prioritizing team composition, past relevant experience, technical approach, problem-solving abilities, and innovation over price. Award is based on a trade-off process to identify the most qualified design-builder, with pricing negotiated after technical selection. Key deliverables include phased design packages (35%, 65%, and 100%), open-book cost estimates, and final facility turnover. Interested parties must submit an Industry Questionnaire via the provided portal and may submit a Statement of Qualifications (limited to 20 pages) or an optional Capability Statement (limited to 12 pages) by the response deadline of September 24, 2026.
Power and Communication Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details