This Solicitation opportunity from Georgia was posted on October 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Union County Board of Commissioners is soliciting proposals from Georgia state licensed contractors for the replacement of the Spiva Cove Bridge and the repair of a culvert on Kiutuestia Creek Road at Lows Mill Road. The project scope includes all necessary labor, materials, and equipment to complete the construction in accordance with Georgia Department of Transportation standards and specifications. The project requires substantial completion within 150 days of the Notice to Proceed, with final completion due within 30 days thereafter. Liquidated damages are established at $500 per day for delays in substantial completion and $100 per day for delays in final completion.
Proposals must be submitted in two separate, sealed packages labeled as Qualifications Proposal and Pricing Proposal, with the outer shipping package specifically marked as RFP – Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair at Lows Mill Road- Project# UC-2026-02. Mandatory submissions include a Bidder's Certification, E-Verify/SAVE affidavits, and proof of insurance. A 5% bid bond is required at the time of proposal, and the awarded vendor must provide 100% performance and payment bonds. The selection process is based on the best interest of Union County, evaluating company background, financials, personnel qualifications, relevant work, and pricing. There is no set-aside status for this solicitation.
General Info
Union County seeks licensed contractors for bridge replacement and culvert repair projects.
PDF, High priority: read this firstproposal-certification
HighAI Summary for Appendix A - Bidder's Certification (Union County Project #UC-2026-02): A mandatory Bidder's Certification form for the Spiva Cove Bridge and Kiutuestia Creek Road Culvert Replacement project (Union County Project #UC-2026-02). The document requires the bidder to certify the absence of collusion or fraud and provide company contact information. Failure to sign this document results in the proposal being declared non-responsive.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Report - Spiva Cove Road Bridge Replacement: A geotechnical engineering evaluation report dated August 19, 2026, prepared by Geo-Hydro Engineers, Inc. for Union County, Georgia. The document details subsurface exploration, including soil test borings and regional geology, to support the Spiva Cove Road Bridge Replacement project. It provides critical technical data on soil classifications, standard penetration testing, and auger refusal depths.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kiutustia Creek Road Culvert Material Quantities and Cost Estimate: A material quantities and cost estimate document for the Kiutustia Creek Road project (26013UCGD) in Union County, GA, dated 10/5/2026. It includes a bid schedule for sitework, specifically culvert repair, clearing and grubbing, grading, and flume installation using Type I Riprap.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Spiva Cove Road Bridge Material Quantities and Cost Estimate: A material quantities and cost estimate document dated 10/5/2026 for the Spiva Cove Road Bridge project (25011UCGD) in Union County, GA. It includes GDOT item descriptions for sitework, bridge structure components, erosion control measures, and a bid schedule format for unit pricing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Spiva Cove Road Site Development Plans: Site design and engineering documents for Spiva Cove Road in Union County, GA, prepared by Carter Engineering. The document includes a sheet index covering site plans, grading, bridge plans, erosion control, and structural design. Status is listed as 'Not for Construction' with an initial submittal date of 08/21-26.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for Spiva Cove Road Site Development Plans: Site development plans and general construction notes for Spiva Cove Road in Blairsville, GA, for Union County Government. Prepared by Carter Engineering Consultants, Inc., the document includes a sheet index covering site plans, grading, bridge plans, and erosion control, as well as detailed general notes regarding construction standards, utility coordination, and material specifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Union County Project# UC-2026-02 Addendum #1: Issued October 21, 2026, this addendum modifies the RFP for the Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair. It includes a revised RFP (v2), revised contract and design drawings, and adds a Geotechnical Report (Appendix H). A signed acknowledgement is required for submission.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Union County Project# UC2026 02 Addendum # 2: Addendum # 2 issued on October 29, 2026, for the Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair at Lows Mill Road (Project# UC2026 02). This document extends the proposal due date to November 19, 2026, at 10:00 a.m. and requires a signed acknowledgement from the vendor.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Union County Spiva Cove Bridge and Kiutuesta Creek Road Culvert RFP: Request for Proposals issued by the Union County Commissioner on October 14, 2026, for the replacement of the Spiva Cove Bridge and repair of the Kiutustia Creek Road Culvert at Lows Mill Road. The procurement is open to Georgia state licensed contractors, with proposals due by November 11, 2026, at 10:00 A.M. The document outlines the procurement schedule, communication restrictions, bond requirements (5% bid bond), and references specific design drawings and pricing forms.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Union County - Spiva Cove Bridge and Kiutuestia Creek Road Culvert RFP: Request for Proposals issued by the Union County Commissioner on October 14, 2026, for the replacement of the Spiva Cove Bridge and repair of a culvert on Kiutuestia Creek Road at Lows Mill Road. The procurement requires Georgia state licensed contractors. Proposals are due by November 11, 2026, at 10:00 A.M. The document outlines the schedule of events, communication restrictions, bond requirements (5% bid bond), and the scope of work.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Union County - Spiva Cove Bridge and Kiutuestia Creek Road Culvert RFP: Request for Proposals issued by the Union County Commissioner on October 14, 2026, for the replacement of the Spiva Cove Bridge and repair of the Kiutuestia Creek Road culvert at Lows Mill Road. The procurement requires Georgia state licensed contractors. Proposals are due by November 11, 2026, at 10:00 A.M. The document outlines the project scope, communication restrictions, a schedule of events, and bonding requirements (5% bid bond, 100% performance and payment bonds).
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Union County - Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair Contract: A construction contract agreement between the Union County Commissioner (Owner) and a Contractor for the Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair at Lows Mill Road. The document outlines the scope of work, integration of contract documents, bonding requirements, and a project timeline specifying substantial completion within 150 days of the Notice to Proceed. It also includes provisions for liquidated damages of $100 per day for delays in final completion.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Union County - Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair Contract: A contract agreement between the Union County Commissioner (Owner) and a Contractor for the Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair at Lows Mill Road. The document outlines the scope of work, payment terms, a 150-day timeline for substantial completion, liquidated damages for delays ($500/day for substantial completion, $100/day for final completion), and bonding requirements.
PDF
PDF, Low prioritysupporting-documents
LowAI Summary for Appendix B - E-Verify Forms: This document provides Georgia E-Verify requirements and necessary affidavits for contractors doing business with Union County. It includes the Contractor E-Verify Affidavit and Agreement, the Contractor E-Verify Exemption Affidavit for those without employees, and a list of compliant states for identification purposes per O.C.G.A. 13-10-91.
PDF
PDF, Low priority3 pages · other
LowAI Summary for Appendix E _ Kiutuestia Creek Road Culvert pl.pdf: Unreadable document.
Union County is requesting proposals from Georgia State licensed contractors to replace the Spiva Cove Bridge and repair a culvert on Kiutuestia Creek Road at Lows Mill Road in Union County.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.