This Solicitation opportunity from Rhode Island was posted on April 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sports Field Lighting System at Veterans Memorial Field

Closed
37State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
DIBBS
BINDER, LOAD
Solicitation # SPE8EF-27-T-0188
Solicitation SPE8EF-27-T-0188 is a request for quotations issued by DLA Troop Support, Construction and Equipment Manufacturing and Construction for the procurement of 61 units of Load Binders, identified by NSN 3990-01-554-6200 and Columbus McKinnon Corporation part number D060164. The requirement is designated as a total small business set-aside under FAR 19.5, with a response deadline of November 9, 2026. Delivery is required within 167 days after order, with a need ship date of April 26, 2027, and a final required delivery date of September 13, 2027. The items are to be delivered FOB Origin to DLA Distribution Red River in Texarkana, Texas, where both inspection and acceptance will take place. The contract mandates strict adherence to packaging and marking standards, requiring compliance with MIL-STD-129 and ASTM D3951, though DLA Master List technical and quality requirements take precedence. Palletization must follow RP001 guidelines. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Key regulatory clauses are incorporated, including DFARS 252.204-7012 for safeguarding covered defense information and various prohibitions regarding hazardous materials and covered telecommunications equipment. Offerors must maintain current certifications in the System for Award Management and provide safety data sheets where applicable to be considered responsible for award.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

1 day ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Town of Barrington, Rhode Island, is seeking proposals from qualified design-build teams to install a new, energy-efficient LED sports field lighting system at Veterans Memorial Field. The project aims to improve visibility and safety while reducing energy consumption and light spill in accordance with IESNA RP-6-15 standards. The selected contractor will be responsible for the entire project lifecycle, including site investigation, engineering design, photometric analysis, procurement, installation of poles and luminaires, and final commissioning. A key objective is to utilize existing electrical infrastructure where possible to avoid extensive trenching and field closures. Proposals are due in person by May 9, 2025, and must include a detailed technical approach, photometric plans, a lump sum price, and evidence of relevant experience. Evaluation will be based on qualifications, design quality, cost, schedule, and warranty offerings. The winning bidder must provide a 100% Performance and Payment Bond and comply with the Davis-Bacon Act regarding prevailing wages. All work must adhere to local, state, and federal building codes and safety regulations.

General Info

Barrington seeks design-build proposals for LED sports lighting at Veterans Memorial Field.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyRhode Island → Town of Barrington
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
ADVERTISEMENT (PDF)REQUEST FOR PROPOSAL & BID FORM (PDF)TOWN OF BARRINGTON, RIREQUEST FOR PROPOSALDesign-Build Services for Veterans Memorial Field Lighting Project 1.1 Project Overview The Town of Barrington, through its Department of Public Works, is soliciting proposals from qualified design-build teams to provide design and construction services for the installation of a new sports field lighting system at Veterans Memorial Field, located in Barrington, Rhode Island.1.2 RFP Schedule (Tentative)RFP Issued: April 21st 2025Pre-Bid Meeting (Optional): April 28th 2025 10am on siteQuestions Due: May 5th 2025 11 am via emailProposals Due: May 9th 2025 11 am in personTarget Award Date: Upon Council Approval date TBDAll communications regarding this RFP shall be directed to:Brock HandyBarrington Public Works84 Upland Way Barrington RI 02806For security reasons, you must enable JavaScript to view this E-mail address. +1 (555) 000-0000 ext. 204SECTION 2: PROJECT BACKGROUND & GOALSVeterans Memorial Field is a central athletic facility serving local sports programs and community events. The Town intends to replace or upgrade existing lighting systems with a new, energy-efficient LED system that provides high-quality, uniform lighting in accordance with IESNA RP-6-15 standards for recreational and competitive play.Goals include:Improved visibility and safety for players and spectatorsReduced energy usage and light spillLong-term reliability with minimal maintenanceSystem control for flexible operationSalvage existing electrical to avoid trenching leading to field closure if possible SECTION 3: SCOPE OF WORK3.1 Design-Build Services The selected team will be responsible for:Field investigation and validation of site conditionsEngineering design of the lighting systemPhotometric analysis meeting Town performance requirementsProcurement and installation of all poles, luminaires, and controlsFoundation design and constructionAll necessary electrical work and trenching (if deemed needed)  Testing, commissioning, and training3.2 Illumination Overview Bidders are required to provide an overview of proposed lighting performance, including anticipated average and minimum footcandle levels for infield and outfield areas. Submissions must include a detailed photometric plan showing uniformity and illumination levels across the entire field.3.3 System Overview Proposals should include a general description of the proposed lighting system including pole types, fixture styles, control systems, and any additional components. Equipment specifications, lighting characteristics, and warranties should be described. Submissions must clearly demonstrate how the system meets or exceeds the Town's goals for quality, reliability, and energy efficiency. SECTION 4: PROPOSAL REQUIREMENTSAll proposals shall include:Cover letter and company profileRelevant experience and past performanceProposed lighting layout and photometric analysisDetailed scope of work and timelineLump sum price and itemized cost breakdownWarranty and maintenance optionsList of key personnel and subcontractors SECTION 5: EVALUATION CRITERIAProposals will be evaluated based on:Qualifications and relevant experience (25%)Quality of design and technical approach (25%)Cost and value (20%)Schedule and ability to meet timelines (15%)Warranty and support offerings (15%) SECTION 6: SUBMISSION INSTRUCTIONSSubmit 3 hard copies and one digital copy via USB.SECTION 7: BONDS AND INSURANCEThe selected contractor shall furnish a 100% Performance and Payment Bond for the full amount of the contract price. Bonds must be provided by a surety company licensed to do business in the State of Rhode Island and acceptable to the Town. Proof of insurance coverage meeting Town requirements will also be required prior to contract execution. SECTION 8: DAVIS-BACON ACT COMPLIANCEThis project is subject to the provisions of the Davis-Bacon Act, and all contractors and subcontractors must pay laborers and mechanics wages at rates not less than those prevailing on projects of a similar character in the locality as determined by the U.S. Department of Labor. Certified payroll documentation will be required for compliance verification. SECTION 9: BUILDING CODE COMPLIANCEAll work performed must comply with local, state, and federal building codes and regulations, including applicable electrical and safety standards.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS