Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Spring Mountain Youth Camp: Concrete Walkway Replacement

Closed
607896-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Clark County is soliciting bids for the demolition and replacement of walkway infrastructure at the Spring Mountain Youth Camp under solicitation number 607896-26. The project involves removing approximately 720 square feet of existing asphalt pavement and 7,150 square feet of concrete walkways, including associated stairs and railings, and constructing new concrete walkways totaling approximately 10,050 square feet with corresponding stairs and railings, as detailed in the construction documents. All work must comply with the specifications provided and be performed at the camp location in Nevada. Bids must be submitted by the deadline of July 28, 2026, at 10:15 PM Pacific Time, and inquiries should be directed to Christian Hartis via email at [email hidden] or by phone at [phone hidden]. This solicitation is posted on the Nevada Government Marketplace platform and is open to qualified firms or individuals willing to meet the project requirements.

General Info

Demolish and replace walkways at Spring Mountain Youth Camp, Nevada, with new concrete, bids due July 28, 2026.

Documents

1

Office of the Labor Commissioner Contact Information

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada Government Marketplace
Contacts1 person available
OfficeNV, USA
Organization / AgencyNevada Government Marketplace
Office AddressNV, USA
Contacts

Full Description

Show more
Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The Work consists of the demolition and removal of approximately 720 sf of existing asphalt pavement and 7,150 sf concrete walkways including associated stairs and railings, and construction of approximately 10,050 sf of new concrete walkways replacement including associated stairs and railings as shown on the construction documents.

More opportunities from Nevada Government Marketplace

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS