SR-1 Freedom Reactor Radiation Shielding Design/Build

Active
INL-26-053Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Battelle Energy Alliance (BEA), the Management and Operating Contractor for the Department of Energy's Idaho National Laboratory (INL), is seeking Expressions of Interest for the design and fabrication of the Reactor Radiation Shielding system (RRS) for the NASA SR-1 Freedom interplanetary spacecraft. The RRS must protect spacecraft components from neutron and gamma photon radiation, maintaining a composite weight of less than 1200 kg and operating in a space vacuum with temperatures ranging from -273°C to 800°C. The system must interface with the reactor structure, control drum actuators, Heat Management System heat pipes, and Power Conversion System structure, while being qualified to withstand launch forces and vibrations. The project will be executed as a firm-fixed price contract awarded in progressive phases, with the possibility of multiple initial awards during the design phase before a final fabrication firm is selected. The project must be completed by July 2027. Interested firms must submit their qualifications by September 24, 2026, demonstrating expertise in radiation shielding design, transport modeling, and fabrication. Qualified offerors must adhere to ISO 9001-2015 and ANSI/ASQC C1-1996 quality standards and be capable of meeting INL Quality Supplier List audit requirements. A formal Request for Proposal is anticipated in late September or early October 2026, with a final award decision expected in October 2026.

General Info

BEA seeks firms to design and fabricate NASA SR-1 radiation shielding by 2027.

Agency

Department Of Energy → Battelle Energy Alliance–doe CntrView Agency

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

ID, 83415, USA

Set-Aside

NONE

Documents

(1)

SR-1 Freedom Reactor Radiation Shielding Design/Build EOI

PDFrfi

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
Contacts1 person available
OfficeIdaho Falls, ID, 83415, USA
Organization / Agency
Department Of Energy → Battelle Energy Alliance–doe Cntr
View Agency Profile
Office AddressIdaho Falls, ID, 83415, USA
Contacts

Full Description

Show more

I.  Introduction


Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL). BEA is collaborating with  the National Aeronautics and Space Administration (NASA) to develop the SR-1 Freedom interplanetary spacecraft. BEA is seeking an Expression of Interest (EOI) from prospective offerors to support design/build of the SR-1 Freedom Reactor Radiation Shielding system (RRS). 



II.  PROCESS


BEA is seeking qualified firms to compete for the design/build contract in support of the BEA/NASA SR-1 Freedom RRS system.  As determined by BEA, responders to this EOI may receive a Request for Proposal (RFP) that will require detailed technical and price proposals be provided for evaluation and ranking under a source selection process.


Interested firms are advised that RFP release is anticipated late September/early October 2026 and the source selection/award decision is anticipated in October 2026.  The contract award type will be firm-fixed price. The design/build contract will be awarded in progressive phases as the firms demonstrate the ability and competency to successfully plan, design, and fabricate the RRS. BEA may initially award multiple Design/Build contracts to various firms though the Design phase to make a final determination of which firm will continue with the fabrication. Completion of this project must be no later than July 2027.



III.  PROJECT DESCRIPTION


The RRS will be designed and fabricated for the SR-1 Nuclear Power Module (NPM) SR-1 Freedom which will be built at the Materials and Fuels Complex (MFC) at the INL.  MFC is located approximately 33 miles west of Idaho Falls, Idaho.  The RRS system will provide radiation shielding for various components of the spacecraft from the nuclear reactor neutron and gamma photon radiation. The composite weight of the RRS will need to be less than 1200 kg and interface with face four separate NPM systems:


  • The reactor structure
  • Control drum actuators
  • The Heat Management System (HMS) heat pipes
  • Power Conversion System (PCS) structure


The RRS system and materials will need to operate in the vacuum of space at temperatures ranging from space ambient temperature of -273°C to 800 °C when in proximity to the reactor and HMS heat pipes. The RRS system and materials will need to be designed, tested, and qualified to withstand the launch forces and vibrations associated with launch into space as well as the operation environment described above.



The RRS must provide adequate radiation shielding for various SR-1 Freedom systems, structures, and components, and prescribed gamma photon total ionizing dose limits and fast neutron fluences limits.



The RRS is positioned between the reactor and the PCS. The HMS transfers heat from the reactor via several dozen heat pipes to the PCS to convert the heat energy into electrical energy. In addition to the penetrations for the HMS heat pipes, the RRS must accommodate penetrations for the rods of the control drum actuators, located on the PCS side, which pass through the RRS and into the reactor.



Specific dimensions, configurations, reactor characteristics, dose limits, etc., may be considered export controlled information and will not be provided in this expression of interest. A general layout of the RRS and interfacing systems is provided below.



IV.  Submittal


Interested firms are requested to provide expressions of interest to the undersigned by close-of business on September 24, 2026.  Included must be sufficient written information confirming the responder’s qualifications addressing each of the following criteria:  


  • Experience in radiation shielding material design and fabrication.
  • Radiation transport modeling or equivalent shielding analysis.
  • Capability to meet the design/build schedule.
  • Capability to provide and fabricate the shielding components in the needed geometries.
  • Proper identification and execution plan for material testing & qualification.
  • Agreement to have a documented quality program that is consistent with the guidelines of ISO 9001-2015 and ANSI/ASQC C1-1996 General Requirements for a Quality Program.
  • Be capable of meeting QA audit requirements to be added to the INL QSL.

Note that responses must be no more than 20 pages in length.  Only potentially qualified offerors, as determined by BEA, will receive the RFP for the project.


If you have questions, need additional information, or need to speak with a BEA Point of Contact, please contact Chase Egbert via email at chase.egbert@inl.gov . Technical questions must be submitted in writing via email.


Similar Contracts

Same NAICS industry code

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 335910
Federal
Long-Duration Energy Storage (LDES) Battery System
Solicitation # INL-26-050
Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) have issued an Expression of Interest (EOI) under solicitation INL-26-050 to identify qualified vendors for non-lithium, rechargeable electrochemical long-duration energy storage (LDES) battery systems. The objective is to acquire systems for benchmark performance testing, specifically requiring two modules with at least 10 kW continuous power and 100 kWh usable energy, and one full-scale system with at least 100 kW continuous power and 1,000 kWh usable energy. All systems must be capable of at least 10 hours of continuous discharge, operate between 0 to 50 degrees Celsius, and possess a minimum field lifetime of 15 years. Acceptable technologies must be pre-built and exclude lithium-ion, lithium metal, lead-acid, and redox flow batteries. Technical requirements include a 3-phase 480 VAC AC interface and an isolated 800-1500 VDC DC interface, with support for SCADA protocols such as Modbus TCP/IP, DNP3, or IEC 61850. Systems must comply with NFPA 855, UL 9540/9540A, and NEC/IEEE standards, and include comprehensive hazard assessments and safety systems. Deliverables involve 70%, 90%, and final design packages, along with Factory and Site Acceptance Testing reports. Modules are to be delivered to INL within approximately three months of design acceptance, while the full-scale system is destined for ANL within six months. This EOI serves as a preliminary screening process to inform a future Request for Proposal (RFP); interested vendors must submit a consolidated response by September 24, 2026, to Chase Egbert.
Battery Manufacturing

POSTED

19 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS