Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SR-118 Drainage Ditch Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 7 in Los Angeles is forecasting a Minor B Project for drainage ditch repairs on State Route 118 in Simi Valley, California. The work will take place between Erringer Road and Sycamore Drive and primarily involves crack sealing for existing asphalt and concrete ditches, as well as backfilling an undermined curb and gutter. The project is managed by Christopher Laurel, a Senior Environmental Scientist, and is associated with a forecast date of September 3, 2026. This infrastructure maintenance effort aims to restore the integrity of the drainage systems along the specified section of the highway.

General Info

Caltrans District 7 drainage ditch repairs on State Route 118, Simi Valley, September 2026.

Agency

California → Caltrans, District 7 - Los Angeles

Place of Performance

Simi Valley, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Christopher LaurelSenior Environmental Scientist (Specialist)

Full Description

Show more
Caltrans is proposing a Minor B Project in Ventura County on State Route 118 between Erringer Road and Sycamore Drive. The scope of the project includes crack sealing an existing asphalt and concrete ditch, and backfilling an undermined curb and gutter.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and utility construction services. The scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling; site work including land surveying, site clearing, shoring, and subsurface investigation; and infrastructure finishing such as asphalt paving, traffic signals, lighting, and landscaping. Additionally, the project requires environmental and support services including storm water pollution prevention (SWPPP), quality control, and site security. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Quotes are being managed through the Building Connected system, with a bid deadline of November 18, 2025, at 2:00 p.m. Primary contact for the solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement project, identified as Federal Project No. STP-9901(663), is a structural and roadway reconstruction effort located in St. Louis, Missouri, managed by the City of St. Louis Board of Public Service. The scope of work includes the reconstruction of the bridge over Forest Park Parkway and MetroLink, featuring critical tasks such as the application of a waterproofing membrane to the bridge deck, installation of galvanized reinforcing bars, and extensive civil works including excavation, concrete pavement, and drainage structures. Technical requirements mandate compliance with various ASTM standards, ADA accessibility guidelines, and specific engineering drawings for MetroLink OCS pole foundations and trackwork. The project has a designated completion timeline of 452 working days, with liquidated damages set at 4,300 dollars per day. Bidders must submit electronic proposals via the Bid Express Online Portal, with a final deadline of November 3, 2026, following several addenda that revised bid quantities and plan sheets. The solicitation requires a 5 percent bid deposit and strict adherence to federal and state regulations, including the Buy America Certification for iron and steel, E-Verify enrollment for employment eligibility, and compliance with the Anti-Discrimination Against Israel Act. Significant emphasis is placed on the Disadvantaged Business Enterprise (DBE) program, requiring detailed participation packages and utilization certifications. Additionally, contractors must ensure all on-site employees complete a ten-hour OSHA Construction Safety Program and adhere to the higher of the Missouri state or federal Davis-Bacon prevailing wage rates.
City of St. Louis Board of Public Service

POSTED

about 13 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
SLED
City of Swainsboro, Georgia: North Green Street Sidewalk Improvements
Solicitation # PE-66723-NONST-2027-000000023
The City of Swainsboro, Georgia, is soliciting proposals for the North Green Street Sidewalk Improvements project, identified by solicitation number PE-66723-NONST-2027-000000023. The scope of work involves furnishing all labor, equipment, and materials to install approximately 1,153 linear feet of concrete curb and gutter, 549 square yards of 5-foot-wide 4-inch-thick concrete sidewalk, 86 square yards of 4-foot-wide 6-inch-thick concrete sidewalk, 94 square yards of 6-inch-thick concrete valley gutter, and two concrete flumes. The project also includes traffic control and the grassing of disturbed areas. All work must comply with the 2021 Georgia Department of Transportation Standard Specifications, the 2024 Supplemental Specifications Book, and applicable special provisions. The project timeline allows for 90 consecutive calendar days for substantial completion and 120 consecutive calendar days for final completion. Bidders must submit sealed proposals by 2:00 P.M. local time on December 3, 2026, at Swainsboro City Hall. Proposals must be submitted on the provided form with pricing in both words and figures and must include a bid bond of at least 5 percent of the lump sum bid. The awarded contractor is required to provide performance and payment bonds, each equal to 100 percent of the contract amount, within 10 days of notification.
City of Swainsboro

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS