Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SR 152 Intersection Control Improvement (10-1Q040)

Forecast
10-1Q040State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The SR 152 Intersection Control Improvement project, managed by Caltrans District 10 in Stockton, involves the construction of a roundabout on State Route 152 from 0.3 miles west to 0.3 miles east of Volta Road in Merced County, approximately 2.5 miles west of Los Banos. The primary objective of the project is to reduce broadside collisions through improved intersection control. The scope of work includes the installation of sidewalks, bike ramps, curb ramps, street lighting, flashing beacons, and various drainage features such as inlets, culverts, outlets, ditches, and basins. To maintain traffic flow during construction, a detour will be established to the south of the intersection, featuring two traffic lanes in each direction, a center left turn lane, and four-foot shoulders. The project may also require additional right-of-way acquisition and utility relocation. The project is categorized as a forecast under NAICS code 237310 and has been determined to be categorically exempt under CEQA Class 1(c) and categorically excluded under NEPA, as it is a minor improvement to an existing facility with no significant environmental impacts. Contractors must adhere to strict environmental and air quality standards, including Caltrans Standard Specifications for dust control and palliative requirements, as well as ARB emission reduction regulations and air pollution control statutes per Sections 7-1.02A, 7-1.02C, and 14-9.02. Project administration is led by Project Manager Daniel Laureno and Senior Environmental Scientist Laura Cook.

General Info

Caltrans District 10 will construct a roundabout on SR 152 to reduce collisions.

Agency

California → Caltrans, District 10 - Stockton

Place of Performance

SR 152, Volta Road Intersection, Los Banos, CA, 93635

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 10 - Stockton
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 10 - Stockton
Office AddressN/A
Contacts
Laura CookSenior Environmental Scientist (Supervisory)

Full Description

Show more
The project proposes to construct a roundabout on State Route (SR) 152 from 0.3 miles west of Volta Road to 0.3 miles east of Volta Road (PM 15.9 to 16.5), approximately 2.5 miles west of Los Banos in Merced County. In addition, project work includes sidewalks, bike ramps, curb ramps, drainage features (drainage inlets, culverts, outlets, ditches, and basins) flashing beacons, and street lighting. Additional right-of-way and utility relocation may be required. A detour would be constructed to the south of the intersection. The roadway would consist of two traffic lanes in both directions, a center left turn lane, and 4 ft shoulders on both sides of the roadway.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
International
Conservation Work and Access Road Improvement of Shahr-e Gholghola to Chehel Dukhtaran Ancient Qalah and Access Road Improvement of Zargaran Bala and Zargaran Payeen Valley in Bamiyan, Afghanistan Aziz Ur Raman Tanha - [email hidden]
Solicitation # AFG26ITB009
UNESCO is soliciting bids for a large-scale works project in Bamiyan province, Afghanistan, focused on preserving heritage properties and upgrading informal settlements in Sayed Abad, Zargaran Bala, and Zargaran Payeen villages. The scope of work includes the conservation of the Ancient Qalahh of Chehel Dukhtaran, improvement of access roads from Shahr-e Gholghola to the Qalahh, and the installation of drainage systems. Key construction activities involve stone masonry, Plain Cement Concrete (PCC), boulders, and Reinforced Cement Concrete (RCC). The project is supported by the government of Italy and implemented through UNESCO and UN-Habitat. The contract will be awarded to the lowest priced technically qualified bidder based on criteria including technical capacity, experience, and compliance with specifications. The performance period requires commencement within 45 days of site access, with substantial completion expected within four months. Financial terms include a potential 20% advance payment, with progress payments submitted monthly and final payment processed 30 days after the issuance of a Certificate of Substantial Completion. Contractual obligations include a 10% performance guarantee valid for 12 months post-completion and a 12-month defects liability period. Liability insurance must cover the contract value plus 10%. For delays, liquidated damages are set at 0.35% of the contract price per calendar day, capped at 10%. Bidders must submit their proposals in PDF format via email by November 29, 2026, ensuring all files are under 10MB per email and avoiding third-party file-sharing tools.
UNESCO

POSTED

about 23 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Salem Twp- T-16 Culvert Washout Replacement
Solicitation # 49913
The Salem Township T-16 Culvert Washout Replacement project involves the emergency repair of a culvert washout on Duck Creek Road in Whipple, Ohio. The scope of work requires the contractor to provide all labor, equipment, and materials to replace the existing washout with a pre-cast concrete four-sided box culvert. The project is governed by the 2023 Ohio Department of Transportation Construction and Materials Specifications and the requirements of the Washington County Engineer. The estimated project cost is $91,527.00, and the contract will be awarded to the lowest and best bidder, provided the bid does not exceed the estimate by more than 10 percent. All work must be completed by April 1, 2027, with a one-year guarantee against defects following final payment. Contractors must adhere to strict regulatory requirements, including Ohio Prevailing Wage Laws, the Ohio Bureau of Worker’s Compensation Drug-Free Workplace Program, and Ohio preference for local products and labor. Required deliverables for the pre-construction meeting include a subcontractor list, a construction schedule, and road closure estimates. The contractor must provide a bid guaranty and, if necessary, a performance bond. Additionally, the project mandates compliance with various federal non-discrimination acts and requires the submission of certified payrolls and proof of Ohio workers' compensation coverage. The Township serves as the sole judge of the quality of materials and workmanship, and the pre-cast box culvert must be installed within a single day after coordinating with the county.
Washington County, OH - Engineer

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS