Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SR-220 Cold Plane and RHMA-G Paving (EA 04-4X970)

Forecast
EA 04-4X970State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation plans to perform cold planing and repaving on State Route 220 from SR-84 to the Sacramento County line in Solano County, covering post miles 0.00 to 3.10. The existing pavement will be removed through cold planing and replaced with a 0.10-inch layer of rubberized hot mix asphalt Type G to improve surface quality and durability. Pavement markings and delineation will be updated as necessary to ensure visibility and safety. All roadside signs within the project limits will be replaced using non-ground disturbing installation methods, with wooden posts set in place of the existing signposts to minimize environmental disruption. The project will be executed under one-way traffic control to maintain safety and allow for efficient construction operations. The initiative is identified under the project title SR-220 Cold Plane and RHMA-G Paving (EA 04-4X970) and is forecasted by Caltrans District 4 - Bay Area/Oakland, with the posting date set for June 29, 2026. Primary point of contact for inquiries is Juliane Smith, Senior Environmental Scientist, who can be reached via email or phone for further details regarding environmental compliance and project logistics.

General Info

Caltrans to cold plane and repave SR-220 with rubberized asphalt, update markings, replace signs non-invasively under one-way traffic.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
The California Department of Transportation (Caltrans) proposes cold planing and repaving State Route (SR-) 220 from SR-84 to the Sacramento County line in Solano County from post mile 0.00 to 3.10. The roadway will be cold planed and then repaved with 0.10-inch of rubberized hot mix asphalt (RHMA) Type G. Pavement delineation and markings will be replaced as needed. The project will also replace roadside signs within the project limits. Only non-ground disturbing signs shall be utilized and the wooden posts will be installed where the current signposts exist. One-way traffic control will be implemented during project construction.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Augusta — Please visit the City of Augusta's website for bid documents.
Solicitation # 027478.00
The Maine Department of Transportation and the City of Augusta are soliciting bids for the Eastern Avenue Pedestrian Crossings project, a Locally Administered Project focused on pedestrian improvements. The scope of work includes the removal of existing sidewalks and shoulders, the construction of concrete bump outs with ADA-approved ramps and landings, sidewalk reconstruction, the installation of Rectangular Rapid Flashing Beacons, and surface milling, shimming, and paving to manage surface water. The project is governed by the MaineDOT Standard Specifications and Standard Details dated March 2026 and the City of Augusta's Technical Standards, with the former taking precedence in the event of a conflict. The contract will be awarded to a responsible qualified bidder based on an evaluation of the total unit price base bid, a construction narrative, and a proposed project schedule. To be eligible, the lowest responsive bidder must have successfully completed a similar project. Proposals must be submitted in sealed form by 2:00 PM on December 9, 2026. The assumed award date is December 18, 2026, with a projected completion date of August 27, 2027, unless otherwise specified in the bidder's schedule. For bids exceeding $50,000, a 5% bid bond and a 100% performance and surety bond are required.
Maine Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS