Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

SR-241/SR-91 Tolled Express Lanes Connector Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The SR-241/SR-91 Tolled Express Lanes Connector Project, managed by Caltrans District 12 in Orange County, involves the construction of a direct-connect structure between State Route 241 and State Route 91. The project will establish two express lanes: one connecting northbound SR 241 to eastbound SR 91, and another connecting westbound SR 91 to southbound SR 241. The work is located across Orange and Riverside Counties, specifically spanning SR 241 from post mile 33.6 to 39.1 and SR 91 from post mile R15.9 to R18.9, affecting the cities of Anaheim, Yorba Linda, and Corona. The scope of work includes the installation of guardrails, outlet pipes, underground storm drainpipes, and bioswales, as well as the reconfiguration of earthen channels into concrete-lined v-ditches. To address environmental impacts, the California Department of Fish and Wildlife amended the Lake and Streambed Alteration Agreement EPIMS-ORA-41486-R5 to update the project from streambed or riparian habitat re-establishment credits to enhancement credits under Fish and Game Code section 1602. The project has been approved by the California Transportation Commission and the California Department of Fish and Wildlife, with both agencies determining that the project will not have a significant environmental effect, provided that the adopted mitigation measures and monitoring plans are followed in accordance with CEQA requirements.

General Info

Caltrans modifies streams for toll lane connector with CDFW oversight, using enhancement credits under CEQA and Fish and Game Code.

Agency

California → Caltrans, District 12 - Orange

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
Contacts
Cherry ZamoraAssociate Deputy Director
Smita DeshpandeSenior Environmental Scientist

Full Description

Show more
Construct a direct-connect structure between SR 241 and SR 91, which will accommodate two lanes: a single express lane connecting northbound SR 241 toll road to eastbound SR 91 Express Lanes, and a single express lane connecting westbound SR 91 Express Lanes to southbound SR 241 toll road.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Construction On State Highway In Santa Cruz County From 0.5 Mile North Of Larkin Valley Road Undercrossing To Laguna Road
Solicitation # 05-1J9624
Solicitation 05-1J9624 is a unit price construction contract issued by the California Department of Transportation for work on State Highway in Santa Cruz County. The project scope involves various locations from State Park Drive to Laguna Road, with primary objectives to modify existing drainage, replace lighting systems, and install Traffic Management Systems. The estimated project cost is 6,800,000 dollars, and the work must be completed within 300 working days. Job site activities are required to start within 55 days of contract approval, though early starts are possible with specific authorizations. Notably, work in culverts or drainage channels at designated locations is restricted to the period between June 1 and October 31. The contract is governed by the 2025 Standard Specifications and Special Provisions, which include requirements for environmental product declarations for concrete and hot mix asphalt, and the electronic submittal of certified payroll records via LCPtracker Pro. Award is based on the total bid, with a strict requirement to meet the Small Business Enterprise participation goal to avoid being deemed nonresponsive. Certified SBE bidders may receive a bid comparison reduction of up to 5 percent. Contractors must adhere to prevailing wage rates, conduct daily safety inspections per 8 CA Code of Regs, and ensure ADA compliance through pre- and post-construction surveys. Payment administration is managed through the Department's prompt payment monitoring system, requiring subcontractors to be paid within 7 days of progress payments.
California Department Of Transportation Division Of Engineering Services Office Engineer

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS