Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Cleveland Mayors Office of Capital Projects was posted on November 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SR 283 - E 55th (Superior to St. Clair) & St. Clair (E. 55th to E. 72nd)

Closed
2025-RFP-114State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 10 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This contract involves the preparation of construction contract plans and specifications for a roadway improvement project along State Route 283, which includes E 55th Street from Superior Avenue to St. Clair and St. Clair Avenue from E 55th Street to E 72nd Street in Cleveland, Ohio. The project covers approximately 1.1 miles and focuses on urban paving, roadway reconfiguration, and safety enhancements aligned with the City’s mobility goals. Key work elements include removing and replacing asphalt layers, installing new curbs, sidewalks, ADA-compliant curb ramps, and drainage systems. Additionally, the project involves traffic control improvements, such as installing new mast arm signals at specified intersections, contingent upon traffic studies, and reconfiguring roadways to support separated bikeways and other safety features. The City will oversee the design process, while construction administration will be managed by ODOT District 12. The procurement process includes a pre-proposal meeting scheduled for November 12, 2025, with a deadline for written questions by November 19, 2025. An official Q&A document will be issued by November 26, 2025. Proposals are due by December 5, 2025, at noon, with submissions made online. The contract value is estimated between five and ten million dollars, and the project is managed by the Cleveland Mayor’s Office of Capital Projects. The City retains the right to reject proposals, waive irregularities, or amend the RFP as deemed necessary to serve its best interests. The selected consultant will be responsible for designing and preparing detailed drawings and specifications, ensuring all work items are clearly assigned and compliant with relevant standards.

General Info

Documents

1

2025-RFP-114 Yuba County Child and Family Team Services

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Sep 24, 2025 to Dec 5, 2025. The notice title changed. NAICS code changed from 624190 to 237310. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCleveland Mayors Office of Capital Projects
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The services required under this Request for Proposal (RFP) are those needed to prepare construction contract plans and specifications for the Division of Engineering and Construction, Mayor’s Office of Capital Projects, for State Route 283 from Superior Avenue to East 72nd Street, approximately 1.1 miles.  E 55th Street from Superior Avenue to St. Clair and St. Clair from E 55th Street to E 72nd Street is designated as State Route (SR) 283 and is classified as a Minor Arterial.  The basic scope of work will consist of removing and replacing asphalt wearing course and intermediate course, installing new curbs, walks, and driveway aprons as needed, PROWAG/ADA-compliant curb ramps and landings, roadway drainage, castings adjusted to grade, traffic control improvements including new mast arm signals at East 61st, East 62nd, Addison, East 67th, and East 71st Streets, if traffic study warrants signals in these locations, and reconfiguring the roadways to accommodate separated bikeways and additional safety and mobility focused changes in alignment with the City’s goals. This is an urban paving project and the City will administer the design. Construction Administration will be performed by ODOT District 12. A pre-proposal meeting will be held November 12, 2025, 10:30 am via Teams. Written questions will be received until November 19, 2025, at 4:00 p.m., and an addendum with all questions and answers will be posted by the close of business on November 26, 2025. The proposal will be due on December 5, 2025, by noon. Questions shall be submitted online through the questions tab included in this proposal request.Where the following terms such as Consultant to determine, Yes, “x”, By Consultant and similar notations are used in this RFP, the Consultant shall design and prepare the necessary drawings and details for that item of work.  Design work may not be passed on to the construction contractor via plan note.  In addition, where there are items that require the action of work (by whom it may not be clear), the Consultant is the party that shall accomplish it. The City reserves the right to reject any or all proposals or portions of them, to waive irregularities, informalities, and technicalities, to re-issue or to proceed to obtain the service(s) desired otherwise, at any time or in any manner considered in the City’s best interests.  The Director may, at his/her sole discretion, modify or amend any provision of this notice or the RFP. 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS