Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

SR-62 Mission Creek Bridge Reinforcement Project (EA 1P680) (Streambed Alteration Agreement No. EPIMS-RIV-50123-R6, Amendment No.1)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife amended Streambed Alteration Agreement EPIMS-RIV-50123-R6 to modify mitigation requirements for the SR-62 Mission Creek Bridge Reinforcement Project in Desert Hot Springs, California. The amendment, issued on November 26, 2025, removes the original requirement to install wildlife directional fencing and replaces it with a commitment to allocate funding toward wildlife connectivity efforts along State Route 62. This change aligns with the project’s environmental objectives under Section 1602 of the Fish and Game Code, which governs streambed alterations, and qualifies for a CEQA exemption under Title 14, Section 15269, as determined by Caltrans District 8. The project’s place of performance is clearly defined at Post Mile 5.6–5.7 on SR-62 in Riverside County, and oversight is shared between Caltrans as the lead implementing agency and CDFW as the regulatory approving authority. No financial figures, contract pricing, or formal procurement mechanisms are disclosed, indicating this is an environmental permitting action rather than a competitive acquisition. Key contacts include Scott Quinnell of Caltrans District 8 and Chris Briggs of CDFW, who serve as primary points of coordination for compliance and mitigation implementation. The agreement does not include standard federal contract clauses, invoicing protocols, payment details, or contractor-specific representations, and no award evaluation criteria or solicitation process is applicable. The focus remains solely on environmental mitigation adaptation through funding reallocation to support ecological connectivity in the project area.

General Info

Amended mitigation for SR-62 bridge project replaces fencing with funding for wildlife connectivity along Post Mile 5.6–5.7.

Agency

California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Desert Hot Springs, CA

Set-Aside

NONE

Documents

(1)

EPIMS-RIV-50123-R6 Streambed Alteration Agreement Amendment No.1 Notice of Exemption

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Office AddressN/A
Contacts
Chris BriggsSenior Environmental Scientist Specialist
Scott QuinnellSenior Environmental Scientist (Supervisor)

Full Description

Show more
The California Department of Fish and Wildlife has amended Streambed Alteration Agreement EPIMS Notification No. EPIMS-RIV-50123-R6 (Agreement), pursuant to Section 1602 of the Fish and Game Code to California Department of Transportation, District 8. Amendment No.1 revises the Agreement to remove a measure that required the installation of wildlife directional fencing. This measure is replaced with a mitigation measure that requires that funding be allocated to wildlife connectivity work along SR-62.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details