Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

SR-84 Sinkhole and Culvert Repair DO (EA 4X430)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Woodside, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for SR-84 Sinkhole and Culvert Repair DO (EA 4X430)

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
Caltrans proposes repairing a sinkhole and failed culvert on SR-84 in San Mateo County at post mile 16.07. Maintenance Services discovered the sinkhole on August 4 and Field Maintenance installed a steel plate over the sinkhole temporarily so the lane could be reopened to traffic. The sinkhole extends approximately 4 feet toward the median, 15 feet back toward a cross culvert, and daylighted 20 feet down the slope along the roadway. It was determined that an 18-inch corrugated metal pipe (CMP) cross culvert had failed, causing water to intrude into the roadway subbase. The water seepage resulted in loss of subbase material and eventually crated the sinkhole. The project proposes to first remove the undermined roadway section and loose material from the sinkhole. The sinkhole will be repaired by reconstructing the subbase. The existing damaged section of the 18-inch CMP cross culvert will be removed and replaced with a new culvert section of the same size. The roadway will then be repaved using hot mix asphalt. Traffic control, temporary railing (type K), and a temporary signal will be required during construction.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS