This Solicitation opportunity from Missouri was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
St. Mark Catholic Church Renovation - Independence, MO
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The St. Mark Catholic Church Renovation project in Independence, Missouri, involves the remodeling of the nave, narthex, and chapel across a 20,392 square foot area. Managed by Straub Construction and designed by HTK Architects/Castrop Design Group, the work includes new tile, lighting, and drywall, as well as the relocation of the confessional, baptistry, and tabernacle. Specific structural modifications include work on the sanctuary stone wall and the installation of geo-foam around the existing altar. The project also includes three alternates covering narthex electrical work, Stations of the Cross soffit and lighting, and North Apse windows. Bids are due by March 27, 2026, at 2:00 PM, with a job walk scheduled for March 13 and RFIs due by March 18. The project is expected to run from May 18, 2026, through December 11, 2026. Key contractual terms specify that the project is sales tax exempt and follows standard wages rather than prevailing wages. Bidders are required to hold their pricing for 90 days following submission. All inquiries should be directed to Preconstruction Manager Frank McCoy.
General Info
Place of Performance
Independence, MO, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (1)
Full Description
Project: St. Mark Catholic Church Renovation - Permit Set Bids Due: Mar 27, 2026 at 2:00 PM Location: 3736 Lee's Summit Road, Independence, MO 64055 Job Walk: Mar 13, 2026 at 10:00 AM Pre-Bid RFIs Due: Mar 18, 2026 at 4:00 PM Expected Start: May 18, 2026 Expected Finish: Dec 11, 2026 Project Size: 20,392 sq. ft. Architect: HTK Architects/Castrop Design Group
Description: St. Mark Catholic Church in Independence, MO will be renovating their existing nave, narthex, & chapel starting May 18th, 2026 and being completed by December 11th, 2026.
Straub has been hired as the Construction Manager.
The nave renovation consists of new tile, lighting, relocation of the confessional, modifications to the sanctuary stone wall, baptistry relocation & re-build, geo-foam and pour around the existing altar, drywall & trim throughout.
In the narthex there will be new paint, lighting (alternate #1), & tile flooring.
The chapel renovation will consist of removal of the existing confessional, new lighting, trim, relocation of the tabernacle, and new tile flooring.
Please note there are three alternates. Alternate #1 - Narthex Electrical Work Alternate #2 - Stations of the Cross Soffit & Lighting Alternate #3 - North Apse Windows
Copy & Paste this link in browser to view 3D walk through of existing church. https://my.matterport.com/show/?m=guMFCTmTDqJ
* SALES TAX EXEMPT * STANDARD WAGES (NOT PREVAILING WAGE) * HOLD PRICING FOR 90 DAYS AFTER BID SUBMISSION
Please contact the Preconstruction Manager, Frank McCoy with any questions: contact@example.gov or +1 (555) 000-0000
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
