Stage and Rain Gauges at Altamont Creek and Arroyo de la Laguna

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Zone 7 Water Agency will install new stream gauging equipment at two locations in Livermore and Sunol, California, with partial funding provided by the California Department of Water Resources. The project involves deploying three field cameras, two telemetered pressure transducer probes, ten staff gauges, and associated telemetry equipment. These installations are designed to provide real-time visual monitoring of stream conditions and debris, improve early flood warning systems, and fill critical precipitation and hydrology data gaps along Arroyo De la Laguna. Construction is scheduled for Summer or Fall 2026 and will involve minimal environmental impact, with a total working footprint of approximately 50 square feet. The installation process for each site will take roughly two weeks of onsite activity, including the placement of footings, galvanized pipes, and camera calibration. Once complete, the project will require periodic staff access to the riparian corridor for ongoing operations and maintenance.

General Info

Zone 7 Water Agency will install stream gauging equipment in California by Fall 2026.

Agency

California → Zone 7 Water Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Altamont Creek at Bluebell and ADLL at Hwy 84, Livermore, CA, 94586

Set-Aside

NONE

Documents

(1)

Notice of Exemption SCH

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Zone 7 Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Zone 7 Water Agency
Office AddressN/A
Contacts
Elke RankSr Water Resources Planner

Full Description

Show more
Zone 7 will install new stream gauging equipment at two locations: Livermore, CA, and Sunol, CA. The installations will include three field cameras, two telemetered pressure transducer probes, ten staff gauges, and associated telemetry equipment. This equipment will benefit the public, Zone 7 Water Agency, and the California Department of Water Resources (DWR), who are providing partial funding support for the project. The field camera system will enable real-time visual monitoring of stream conditions, debris accumulation, and channel flow, supporting storm response and operational decision-making during high-flow events. The new steam gauge in Sunol, CA will further allow for: 1) Better understanding of the hydrology along Arroyo De la Laguna (ADLL) located in Sunol, CA 2) Improve the flood agency’s early flood warning system 3) Fill stream and precipitation data gaps along ADLL 4) Provide real-time stream and precipitation data to the public Construction activities include manually dug footings for the equipment box near top of bank, mounting galvanized pipes along the channel slope for the probes, and mounting several staff plates along the channel slope. In all, the working footprint dimension for the two structures is approximately 50 square feet. This project will have minimal/ no impact on baseline noise and riparian vegetation. Temporary construction noises will be small and limited to a few hours during business hours. The target construction date for each camera location is set for Summer/Fall 2026, and for each location it will take approximately 1-2 days to construct the pole mounting equipment, then approximately 1 day to install the field camera and telemeter equipment. Field surveying and camera calibration of the station will take 2-3 days. In total it will take approximately 2 weeks of onsite field activity. Ongoing operations and maintenance of this station may require staff to periodically enter the riparian corridor where the field probes/cameras are placed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal and ocean disposal of gravel, sand, silt, and clay. Additionally, the project requires revetted mole repairs, which encompass clearing and grubbing, CRM wall repair, tree and vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. The solicitation is an invitation for bid under NAICS code 237990, with a response deadline of September 30, 2026. Bids must be submitted in sealed envelopes, as electronic submissions are not permitted. Evaluation is based on a pass/fail gate for compliance and completeness, with a bid guarantee required at 20 percent of the bid price or 3 million dollars, whichever is less. The contract emphasizes strict quality management, requiring the use of the USACE National Dredging Quality Management Program and a physical on-site presence for the Quality Control Manager. Payment will be processed through the USACE Finance Center, and the project must adhere to EM 385-1-1 safety requirements and specific environmental protections for the Hawaiian hoary bat pupping season.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED