Stage and Rain Gauges at Altamont Creek and Arroyo de la Laguna
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Zone 7 Water Agency will install new stream gauging equipment at two locations in Livermore and Sunol, California, with partial funding provided by the California Department of Water Resources. The project involves deploying three field cameras, two telemetered pressure transducer probes, ten staff gauges, and associated telemetry equipment. These installations are designed to provide real-time visual monitoring of stream conditions and debris, improve early flood warning systems, and fill critical precipitation and hydrology data gaps along Arroyo De la Laguna. Construction is scheduled for Summer or Fall 2026 and will involve minimal environmental impact, with a total working footprint of approximately 50 square feet. The installation process for each site will take roughly two weeks of onsite activity, including the placement of footings, galvanized pipes, and camera calibration. Once complete, the project will require periodic staff access to the riparian corridor for ongoing operations and maintenance.
General Info
Agency
NAICS
Place of Performance
Altamont Creek at Bluebell and ADLL at Hwy 84, Livermore, CA, 94586Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts