Stage and Rain Gauges at Altamont Creek and Arroyo de la Laguna

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Zone 7 Water Agency will install new stream gauging equipment at two locations in Alameda County: Altamont Creek at Bluebell Drive in Livermore and Arroyo de la Laguna at Highway 84 in Sunol. This project, partially funded by the California Department of Water Resources, involves the installation of three field cameras, two telemetered pressure transducer probes, ten staff gauges, and associated telemetry equipment. The primary objectives are to enable real-time visual monitoring of stream conditions and debris, improve the early flood warning system, fill precipitation data gaps along Arroyo de la Laguna, and provide real-time hydrological data to the public. Construction is targeted for Summer or Fall 2026 and will involve approximately two weeks of onsite activity per location, including pole mounting, equipment installation, and camera calibration. The physical work consists of manually dug footings, galvanized pipe mounting, and the installation of staff plates, with a total working footprint of approximately 50 square feet. The project is certified as a Categorical Exemption under CEQA Guidelines Section 15301 due to its minimal environmental impact on noise and riparian vegetation. Ongoing operations will require periodic staff access to the riparian corridors where the equipment is situated.

General Info

Zone 7 Water Agency will install stream gauging equipment in California by Fall 2026.

Agency

California → Zone 7 Water Agency

Place of Performance

Altamont Creek at Bluebell and ADLL at Hwy 84, Livermore, CA, 94586

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Zone 7 Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Zone 7 Water Agency
Office AddressN/A
Contacts
Elke RankSr Water Resources Planner

Full Description

Show more
Zone 7 will install new stream gauging equipment at two locations: Livermore, CA, and Sunol, CA. The installations will include three field cameras, two telemetered pressure transducer probes, ten staff gauges, and associated telemetry equipment. This equipment will benefit the public, Zone 7 Water Agency, and the California Department of Water Resources (DWR), who are providing partial funding support for the project. The field camera system will enable real-time visual monitoring of stream conditions, debris accumulation, and channel flow, supporting storm response and operational decision-making during high-flow events. The new steam gauge in Sunol, CA will further allow for: 1) Better understanding of the hydrology along Arroyo De la Laguna (ADLL) located in Sunol, CA 2) Improve the flood agency’s early flood warning system 3) Fill stream and precipitation data gaps along ADLL 4) Provide real-time stream and precipitation data to the public Construction activities include manually dug footings for the equipment box near top of bank, mounting galvanized pipes along the channel slope for the probes, and mounting several staff plates along the channel slope. In all, the working footprint dimension for the two structures is approximately 50 square feet. This project will have minimal/ no impact on baseline noise and riparian vegetation. Temporary construction noises will be small and limited to a few hours during business hours. The target construction date for each camera location is set for Summer/Fall 2026, and for each location it will take approximately 1-2 days to construct the pole mounting equipment, then approximately 1 day to install the field camera and telemeter equipment. Field surveying and camera calibration of the station will take 2-3 days. In total it will take approximately 2 weeks of onsite field activity. Ongoing operations and maintenance of this station may require staff to periodically enter the riparian corridor where the field probes/cameras are placed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project in Centerville, Ohio, is a civil and electrical infrastructure initiative with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of concrete drive aprons and curbing, sanitary sewer and water main work, and a design-build electrical component covering site lighting, service conductors, and associated infrastructure. Key deliverables include the installation of 22 decorative light fixtures, weather-resistant receptacles, and specific roadway and traffic signal marking. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion deadline of September 30, 2027. The contract is administered by Oberer Construction Managers, Ltd. on behalf of the City of Centerville. Award is based on the lowest and best unit price bid submitted via Bid Express. Bidders are required to provide a bid bond for the full amount or a certified check for 10 percent of the bid, and the successful contractor must post a 100 percent performance bond. Financial requirements include minimum liability insurance limits of $2,000,000 for CGL and $1,000,000 for auto and employers liability. A 6 percent retainer will be held upon completion to serve as a maintenance bond. Compliance with Ohio Prevailing Wage laws and anti-discrimination clauses is mandatory.
City of Centerville

POSTED

about 14 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
CAT PLANT RIVERSIDE FERRY DOCK AND SHELTER
Solicitation # 2027-03
The Chatham Area Transit Authority (CAT) is soliciting proposals for the design, permitting, and construction of a ferry dock and shelter located at 500 West River Street in Savannah, Georgia. This design-build project features a 20 by 120 foot concrete floating dock with internal piles, an 80 foot long ADA-compliant aluminum gangway, solar-powered lighting, and a passenger landing shelter measuring approximately 14 by 24 feet. The estimated project timeline is 18 months, though CAT anticipates awarding a three-year contract to the selected vendor. All work must adhere to specific design plans from Thomas and Hutton and Sottile and Sottile, and all drawings must be stamped by a licensed professional. Proposals are due by November 6, 2026, and will be evaluated based on approach (40 points) and cost (10 points), with award given to the most advantageous Design/Builder. Submission requirements include a main response, a separate sealed cost proposal, and various certifications. The contract is subject to stringent federal regulations, including Buy America and Build America Buy America ACT requirements, DBE non-discrimination standards, and 2 CFR 200 administrative requirements. Selected vendors must provide a 5 percent bid bond, as well as performance and payment bonds for 100 percent of the contract price, and maintain commercial general and professional liability insurance.
Chatham Area Transit Authority

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS