Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Stampede Penstock and Butterfly Valve Rehab

Closed
140R2026R0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract for the Stampede Penstock and Butterfly Valve Rehab involves the rehabilitation of critical water infrastructure under the Bureau of Reclamation’s Mid-Pacific Region, with performance occurring at a project site under its jurisdiction. The scope encompasses multiple construction divisions including earthwork, marine construction, electrical systems, finishes, and hazardous material abatement, with specific requirements for abrasive blast cleaning and coating application on carbon steel, ductile iron, and steel components, as well as demolition, repair, and replacement of damaged infrastructure. Work must begin within seven days of notice to proceed and be fully completed within 600 calendar days, including final site cleanup. All materials must be sourced from the original manufacturer’s production lot, preserved against environmental degradation, and packaged according to strict standards requiring complete product identification, heat-shrink labeling with specified font and length, and non-conductive, heat-resistant cable tags. No bar-coding or military packaging standards are mandated, but industry standards such as ASME BPVC-V-21, ASME BPVC-IX-21, ASTM A802-19, and SSPC-SP standards govern inspection, testing, surface preparation, and welding qualifications. Acceptance of all materials occurs only at the jobsite after installation and testing, with the contractor fully responsible for damage or loss post-inspection. The solicitation is structured under a Lowest Price Technically Acceptable (LPTA) evaluation methodology, with no weighting assigned to factors, and award contingent upon proposals being deemed acceptable across all criteria—Technical Capability (including construction schedule and experience) and Past Performance—with price serving as the sole differentiator among technically acceptable offers. Proposals must be submitted electronically in three distinct volumes—Business, Technical, and Pricing—each with specific formatting requirements including a table of contents, cross-references, and cover page, and must be emailed to the contracting officer, Charlesetta Seibure, by the June 9, 2026 deadline. All offerors must provide a Unique Entity Identifier and CAGE code if using covered telecommunications equipment, and must represent their small business status under NAICS 237110, with a $45 million size standard. Contractor personnel are subject to Tier 1 background investigations under Reclamation’s SLE 01-01 directive, must obtain DOI Access Cards, and are required to have a Certified Industrial Hygienist and Safety Professional on site. Invoicing must be submitted through the Integrated Payment Processing system, with supporting documents emailed to a designated address;

General Info

Rehabilitation contract for Stampede Penstock and Butterfly Valve, issued May 2026, responses due June 3.

Agency

Department Of The Interior → Mp-Regional OfficeView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(32)

Solicitation 140R2026R0006 Stampede Penstock and Butterfly Valve Rehab

PDFifb

Section 52 00 00 Drawings for Stampede Dam Project

PDFdrawings

Section 01 57 70 Fire Protection and Prevention

PDFspecifications

Section 01 57 30 Water Pollution Control

PDFspecifications

Notice to Contractors on SAM Representations

PDFspecial-notice

Section 26 05 20 Grounding and Bonding Specifications

PDFspecifications

Section L Amendment 0001 - Instructions to Offerors

PDFamendment

New For Information Only (FIO) Drawings

PDFother

Amendment 0003 to Solicitation 140R2026R0006 for Stampede Penstock and Butterfly Valve Rehab

PDFamendment

Release of Claims Form DI-137 March 2017

PDFrelease-of-claims

Stampede Penstock and Butterfly Valve Rehab Q&A

PDFq-and-a

Amendment 0005 to Solicitation 140R2026R0006 for Stampede Penstock and Butterfly Valve Rehab

PDFamendment

General Decision Number CA20260007 Wage Determination

PDFwage-determination

Solicitation 140R2026R0006 - Stampede Penstock and Butterfly Valve Rehab

PDFifb

Section B - Supplies or Services and Prices/Costs for Stampede Penstock and Butterfly Valve Rehab

PDFprice-schedule

Amendment 0001 to Solicitation 140R2026R0006 for Stampede Penstock and Butterfly Valve Rehab

PDFamendment

Section 01 35 20 Safety and Health

PDFsow

Revised Specifications and Price Schedule for Stampede Penstock and Butterfly Valve Rehab

PDFspecifications

Amendment 0002 to Solicitation 140R2026R0006 for Stampede Penstock and Butterfly Valve Rehab

PDFamendment

Section 01 35 50 Site Security

PDFspecifications

Section 01 14 10 Use of Site

PDFspecifications

Section 00 01 10 Table of Contents for Specifications

PDFspecifications

Non-Disclosure_Agreement_%28NDA_-_Stampede_Penstock_and_Butterfly_Valve_Rehab_0001.pdf

PDF

Past Performance Questionnaire for Solicitation 140R2026R0006

PDFpast-performance

Site Visit Attendance Record for Solicitation 140R2026R00006

PDFsite-visit-attendance-record

Amdt 0005 Section J Attachment 6 Yaskawa 650 KW Generator Drawings

PDFamendment

Solicitation 140R2026R0006 Stampede Penstock and Butterfly Valve Rehab

PDFifb

Amendment 0004 to Solicitation 140R2026R0006 for Stampede Penstock and Butterfly Valve Rehab

PDFamendment

Amdt_0005 Attachment 1 - Questions and Answers

PDFamendment

Section 01 33 00 Submittals

PDFsow

Section 31 03 33 Removal and Control of Water

PDFspecifications

Offeror Responsibility Information for Solicitation 140R2026R0006

PDFofferor-responsibility-information

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mp-Regional Office
Contacts1 person available
OfficeSACRAMENTO, CA, 95825, USA
Organization / Agency
Department Of The Interior → Mp-Regional Office
View Agency Profile
Office AddressSACRAMENTO, CA, 95825, USA
Contacts

Full Description

Show more
Stampede Penstock and Butterfly Valve Rehab

More opportunities from Department Of The Interior → Mp-Regional Office

Same awarding agency

NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 4 days
View Details
NAICS: 237990
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build construction contract issued by the U.S. Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Sacramento County, California. The project is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under FAR 19.14, with an estimated value between 1 million and 5 million dollars. The scope of work encompasses the removal and disposal of the existing crane, including the handling of asbestos and other hazardous materials, the design and installation of a new 30-ton bridge crane, power supply installation, rail system survey and optional repairs, and final commissioning, load testing, and operator training. The contractor must begin performance within 7 calendar days of the notice to proceed and complete all work, including final cleanup, within 600 calendar days. The procurement process utilizes FAR Part 15 negotiation procedures, with award based on the most advantageous proposal to the government. Evaluation is weighted heavily toward non-price factors, specifically the technical approach, past performance within the last six years, and the qualifications of key personnel, including a qualified crane inspector. Proposals must be submitted in three distinct volumes: Business, Technical, and Pricing. The contract includes strict quality assurance requirements, including Factory Acceptance Testing (FAT) for PLCs and VFDs and adherence to various NEMA, IEEE, and UL standards. Performance is subject to liquidated damages of 2,900 dollars per calendar day of delay, and the contractor is required to provide performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS