Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on September 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Standing Seam Metal Roofing Installation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
SG-000-270-003 Roof Replacement, Repair and Gutter Replacement Red Brick Cottages 1-4
Solicitation # SG-000-270-003
Solicitation SG-000-270-003 is for the roof replacement, repair, and gutter replacement of Red Brick Buildings 1 through 4 at Spring Grove Hospital in Catonsville, Maryland. The scope of work includes the installation of a new roof system and underlayment using Asphalt Architectural Limited Lifetime Warranty Shingles, with a required minimum average aged R-Value of 30. Technical requirements encompass selective structure demolition, gypsum deck restoration, and steel decking, with all materials subject to Architect approval and adherence to ASTM, ADA, and Maryland Accessibility Code standards. Eligibility is strictly limited to Master Contractors in the Central Region who have been awarded a contract under the Indefinite Quantity Contract IQC DGS-25-307-IQC. The award will be granted to the responsible bidder submitting the lowest responsive total bid. A critical requirement for responsiveness is the submission of properly completed MBE documentation, specifically Attachment D-1A, to meet a 20 percent MBE procurement goal. Bids must be submitted via the eMMA portal by November 30, 2026. Contract administration follows the General Conditions for Construction Contracts (July 1, 2022), with payments processed monthly and net 30 days after receipt of a proper invoice. Contractors must remit a 1 percent electronic transaction fee to the State. Performance begins upon receipt of a written Notice to Proceed, and the contractor is responsible for maintaining an adequate inspection system and adhering to prevailing wage laws, which prohibit the employment of helpers or trainees.

POSTED

about 10 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This subcontract opportunity involves the installation of a structural standing seam metal roofing system for US Army Corps of Engineers facility projects located in Cortland, Ohio. The scope of work includes the installation of metal roof panels, box gutters, and scuppers, ensuring the final system is fully integrated with the existing structure and remains watertight according to the provided specifications and drawings. The project is managed by the Department of Defense under the W072 Endist Pittsburgh agency and is designated as a total small business set-aside. Interested parties must submit their responses by October 26, 2026, under NAICS code 238160.

General Info

Small business subcontract for metal roofing installation at US Army facility in Cortland, Ohio.

NAICS

238160 - Roofing Contractors

Place of Performance

PA, 44410

Set-Aside

SBA

Documents

This scope was carved out of W911WN26QA062.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • SG-000-270-003 Roof Replacement, Repair and Gutter Replacement Red Brick Cottages 1-4Open now, due in 12 days
  • FCI Bastrop - Remove and Replace Housing Unit Roofs (10) 27Z5BB3Open now, due in 12 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs a structural standing seam metal roofing system for prime contractors on US Army Corps of Engineers facility projects in Cortland, OH. Installs standing seam metal roof panels, box gutters, and scuppers, integrating the system with the existing structure per provided specifications and drawings. Delivers a fully installed and watertight structural standing seam metal roof system.

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
Federal
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA004
The Borough of Millvale Local Protection Project (LPP) rehabilitation is a USACE project located along Girty's Run in Millvale Borough, Pennsylvania. The scope of work involves repairing significant flood damage from April 2024, specifically addressing bank erosion, shoaling, ruptured gabion baskets, and washed-out concrete buttresses that currently impede streamflow. The contractor will be responsible for site preparation, including erosion and sediment controls and temporary water diversions, as well as the excavation and removal of debris, replacement of damaged concrete paving and gabions, and the placement of stone-filled gabions between Station 68+00 and Station 73+80. This is a 100% Small Business Set-Aside under NAICS 237990, with an anticipated construction cost between $300,000.00 and $350,000.00. The award will be a single Firm-Fixed-Price purchase order based on best value, evaluating price and past performance. The project must be completed within 365 calendar days of the written Notice to Proceed, with work commencing within 10 days of that notice. Key requirements include the provision of performance and payment bonds at 100% of the contract price, adherence to the Davis-Bacon Act, and the appointment of a Superintendent who cannot also serve as the Site Safety and Health Officer.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

in 20 days
View Details
NAICS: 238210
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

23 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS