Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

State Route 12 ADA Facilities Upgrades

Forecast
3W030_SR 12 ADA Upgrades_NOE 12State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 4 - Bay Area/Oakland

Place of Performance

Petaluma Avenue and Morris Street, Sebastopol, CA, 95472

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Christopher PincetichBranch Chief / Senior Environmental Scientist

Full Description

Show more
This project proposes to upgrade eight curb ramps and add two curb ramps, all to current ADA standards, at the intersection of Morris Street and SR 12 (Sebastopol Avenue), along with upgrades and installation of Pedestrian Push Buttons and Accessible Pedestrian Signals, where needed, at each corner. This project will also replace damaged sidewalk along SR 12 from Petaluma Avenue (PM 9.29) to Morris Street (PM 9.52). Drainage inlets between Petaluma Avenue and Morris Street, as well as the 18” corrugated metal pipe connecting them, will also be replaced.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, identified as IFB No. 8003R1, for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and site development activities. The scope of work includes site preparation such as land surveying, site clearing, and subsurface investigation; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Adherence to storm water pollution prevention (SWPPP) requirements is also mandatory. This solicitation specifically targets qualified Small Business (SB), Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Certification from an approved agency such as the SBA, MBDA, or CPUC must be obtained prior to the bid opening. The deadline for responses is November 18, 2025, with submissions managed through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
2027 Task Order Contract for Street Rehabilitation Package 11 Reconstruction
Solicitation # 23-04203-11
The City of San Antonio is soliciting bids for the 2027 Task Order Contract for Street Rehabilitation Package 11 Reconstruction under solicitation number 23-04203-11. This project involves comprehensive street reconstruction and infrastructure improvements within Texas. The scope of work includes base and pavement replacement, street reconstruction, the installation of concrete curbs, sidewalks, driveways, and curb ramps, as well as the construction of combination-type concrete retaining walls. Additionally, the contractor will be responsible for cleaning and sealing joints and cracks, installing speed humps, signage, and pavement markings, and performing topsoil and sodding work. The project also requires adjusting existing manholes and valve boxes, along with any other necessary tasks dictated by site conditions to complete the project scope. This solicitation was posted on November 6, 2026, with a response deadline of December 11, 2026. The procurement is managed by the City of San Antonio's finance and procurement department, with primary points of contact including Peter Duro and Troy Elliott. Interested parties can find further details through the Texas SmartBuy portal. While specific pricing, period of performance, and evaluation factors were not detailed in the provided documentation, the contract is categorized as a SLED organization project focused on essential urban infrastructure rehabilitation.
CITY OF SAN ANTONIO

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes
Solicitation # ITB2025-172CE
The City of Palm Beach Gardens, FL, is soliciting sealed responses for the LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes under solicitation number ITB2025-172CE. The project focuses on enhancing pedestrian and cyclist safety through the construction of 5-foot bicycle lanes on both the north and south sides of Gardens Parkway between Alternate A1A and Prosperity Farms Road, as well as a new 8-foot wide sidewalk on the south side between Fairchild Gardens Avenue and Prosperity Farms Road. The contract will be awarded to the responsive and responsible bidder who offers the lowest total aggregate price. Bidders must be certified general contractors in the State of Florida and must be prequalified by the Florida Department of Transportation for contracts exceeding $250,000. The project has a maximum performance duration of 410 calendar days, and bids exceeding this timeframe will be rejected. Contractors must adhere to strict technical specifications, including FDOT Standard Plans for traffic control, OSHA safety standards, and ADA requirements for installation patterns. Key legal and labor requirements include compliance with the Davis-Bacon and Related Act, the Build America Act (BABA) for sourcing steel and iron, and the maintenance of a drug-free workplace. The contract requires a minimum one-year warranty from the date of acceptance and mandates that all offers be accompanied by a bid bond, certified check, cashier's check, or surety bond. Submissions must include a detailed work schedule, evidence of experiential qualifications from the past five years, and a list of available staff and equipment.
City Engineer

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS